5 resultados para Standardisation. Selling Process. Sales Performance. Sales Funnel Management. Performance
em Greenwich Academic Literature Archive - UK
Resumo:
The performance enhancement of AMLCD's has been hindered with problems encountered during the curing process, such as window framing and de-lamination of the glass and adhesive. A thermo-mechanical analysis using FEA was conducted to help optimise the design of the rugged display and enhance the optical performance.
Resumo:
In this paper, a knowledge-based approach is proposed for the management of temporal information in process control. A common-sense theory of temporal constraints over processes/events, allowing relative temporal knowledge, is employed here as the temporal basis for the system. This theory supports duration reasoning and consistency checking, and accepts relative temporal knowledge which is in a form normally used by human operators. An architecture for process control is proposed which centres on an historical database consisting of events and processes, together with the qualitative temporal relationships between their occurrences. The dynamics of the system is expressed by means of three types of rule: database updating rules, process control rules, and data deletion rules. An example is provided in the form of a life scheduler, to illustrate the database and the rule sets. The example demonstrates the transitions of the database over time, and identifies the procedure in terms of a state transition model for the application. The dividing instant problem for logical inference is discussed with reference to this process control example, and it is shown how the temporal theory employed can be used to deal with the problem.
Resumo:
The future of many companies will depend to a large extent on their ability to initiate techniques that bring schedules, performance, tests, support, production, life-cycle-costs, reliability prediction and quality control into the earliest stages of the product creation process. Important questions for an engineer who is responsible for the quality of electronic parts such as printed circuit boards (PCBs) during design, production, assembly and after-sales support are: What is the impact of temperature? What is the impact of this temperature on the stress produced in the components? What is the electromagnetic compatibility (EMC) associated with such a design? At present, thermal, stress and EMC calculations are undertaken using different software tools that each require model build and meshing. This leads to a large investment in time, and hence cost, to undertake each of these simulations. This paper discusses the progression towards a fully integrated software environment, based on a common data model and user interface, having the capability to predict temperature, stress and EMC fields in a coupled manner. Such a modelling environment used early within the design stage of an electronic product will provide engineers with fast solutions to questions regarding thermal, stress and EMC issues. The paper concentrates on recent developments in creating such an integrated modeling environment with preliminary results from the analyses conducted. Further research into the thermal and stress related aspects of the paper is being conducted under a nationally funded project, while their application in reliability prediction will be addressed in a new European project called PROFIT.
Resumo:
A cross-domain workflow application may be constructed using a standard reference model such as the one by the Workflow Management Coalition (WfMC) [7] but the requirements for this type of application are inherently different from one organization to another. The existing models and systems built around them meet some but not all the requirements from all the organizations involved in a collaborative process. Furthermore the requirements change over time. This makes the applications difficult to develop and distribute. Service Oriented Architecture (SOA) based approaches such as the BPET (Business Process Execution Language) intend to provide a solution but fail to address the problems sufficiently, especially in the situations where the expectations and level of skills of the users (e.g. the participants of the processes) in different organisations are likely to be different. In this paper, we discuss a design pattern that provides a novel approach towards a solution. In the solution, business users can design the applications at a high level of abstraction: the use cases and user interactions; the designs are documented and used, together with the data and events captured later that represents the user interactions with the systems, to feed an intermediate component local to the users -the IFM (InterFace Mapper) -which bridges the gaps between the users and the systems. We discuss the main issues faced in the design and prototyping. The approach alleviates the need for re-programming with the APIs to any back-end service thus easing the development and distribution of the applications
Resumo:
Purpose: The purpose of this paper is to describe the problems encountered and the solutions developed when using benchmarking and key performance indicators (KPIs) to monitor a major UK social house building innovation (change) programme. The innovation programme sought improvements to both the quality of the house product and the procurement process. Design/methodology/approach: Benchmarking and KPIs were used to quantify performance and in-depth case studies to identify underlying cause and effect relationships within the innovation programme. Findings: The inherent competition between consortium members; the complexity of the relationship between the consortium and its strategic partner; the lack of an authoritative management control structure; and the rapidly changing nature of the UK social housing market all proved problematic to the development of a reliable and robust monitoring system. These problems were overcome by the development of multi-dimensional benchmarking model that balanced the needs and aspirations of the individual organisations with the broader objectives of the consortium. Research limitations/implications: Whilst the research methodology provides insight into the factors that affected the performance of a major innovation programme its findings may not be representative of all projects. Practical implications: The lessons learnt should assist those developing benchmarking models for multi-client consortia. Originality/value: The work reported in this paper describes an inclusive approach to benchmarking in which a multiple client group and their strategic partner sought to work together for shared gain. Very few papers have addressed this issue.