2 resultados para Reasonable time
em Greenwich Academic Literature Archive - UK
Resumo:
A commercial pyrometallurgical process for the extraction of platinum-group metals (PGM) from a feedstock slag was analysed with the use of a model based on computational fluid dynamics. The results of the modelling indicate that recovery depends on the behaviour of the collector phase. A possible method is proposed for estimation of the rate at which PGM particles in slag are absorbed into an iron collector droplet that falls through it. Nanoscale modelling techniques (for particle migration or capture) are combined with a diffusion-controlled mass-transfer model to determine the iron collector droplet size needed for >95% PGM recovery in a typical process bath (70 mm deep) in a realistic time-scale (<1 h). The results show that an iron droplet having a diameter in the range 0.1–0.3 mm gives good recovery (>90%) within a reasonable time. This finding is compatible with published experimental data. Pyrometallurgical processes similar to that investigated should be applicable to other types of waste that contain low levels of potentially valuable metals.
Resumo:
This work explores the impact of response time distributions on high-rise building evacuation. The analysis utilises response times extracted from printed accounts and interviews of evacuees from the WTC North Tower evacuation of 11 September 2001. Evacuation simulations produced using these “real” response time distributions are compared with simulations produced using instant and engineering response time distributions. Results suggest that while typical engineering approximations to the response time distribution may produce reasonable evacuation times for up to 90% of the building population, using this approach may underestimate total evacuation times by as much as 61%. These observations are applicable to situations involving large high-rise buildings in which travel times are generally expected to be greater than response times