5 resultados para Rear-End Collisions.
em Greenwich Academic Literature Archive - UK
Resumo:
While incidents requiring the rapid egress of passengers from trains are infrequent, perhaps the most challenging scenario for passengers involves the evacuation from an overturned carriage subjected to fire. In this paper we attempt to estimate the flow rate capacity of an overturned rail carriage end exit. This was achieved through two full-scale evacuation experiments, in one of which the participants were subjected to non-toxic smoke. The experiments were conducted as part of a pilot study into evacuation from rail carriages. In reviewing the experimental results, it should be noted that only a single run of each trial was undertaken with a limited — though varied — population. As a result it is not possible to test the statistical significance of the evacuation times quoted and so the results should be treated as indicative rather than definitive. The carriage used in the experiments was a standard class Mark IID which, while an old carriage design, shares many features with those carriages commonly found on the British rail network. In the evacuation involving smoke, the carriage end exit was found to achieve an average flow rate capacity of approximately 5.0 persons/min. The average flow rate capacity of the exit without smoke was found to be approximately 9.2 persons/min. It was noted that the presence of smoke tended to reduce significantly the exit flow rate. Due to the nature of the experimental conditions, these flow rates are considered optimistic. Finally, the authors make several recommendations for improving survivability in rail accidents. Copyright © 2000 John Wiley & Sons, Ltd.
Resumo:
This study utilized the latest computing techniques to analyze the driver's cab of a railroad vehicle colliding with deformable objects. It explored the differences between a collision with a deformable object and a collision with a rigid object. It also examined the differences between a collision with a large simple shaped object and a collision with a life-like object. Tools of analysis included vehicle dynamics analysis and finite element analysis.
Resumo:
Considers the proposed pre-action protocol for mortgage arrears aimed at residential lenders and intended to restrict their ability to seek possession. Includes responses to the Civil Justice Council's consultation, which ended in May 2008, with particular emphasis on the objections of the Council of Mortgage Lenders. [From Legal Journals Index]
Resumo:
EXECUTIVE SUMMARY Aims 1. The aims of this strategy are • to ensure that a full range of education and training related to the adult end of life care pathway is available across South East London to meet the needs of our health and social care workforce • to enable those responsible for end of life care education and training commissioning to procure comprehensively from a full range of education providers in a systematic and strategic manner. Background 2. The work that underpins this strategy was begun by the South East London Cancer Network via its Palliative and End of Life Care Coordinating Group and then developed by way of the Marie Curie Delivering Choice Programme’s Education and Training work stream.