10 resultados para Labor Stage Third

em Greenwich Academic Literature Archive - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper studies two models of two-stage processing with no-wait in process. The first model is the two-machine flow shop, and the other is the assembly model. For both models we consider the problem of minimizing the makespan, provided that the setup and removal times are separated from the processing times. Each of these scheduling problems is reduced to the Traveling Salesman Problem (TSP). We show that, in general, the assembly problem is NP-hard in the strong sense. On the other hand, the two-machine flow shop problem reduces to the Gilmore-Gomory TSP, and is solvable in polynomial time. The same holds for the assembly problem under some reasonable assumptions. Using these and existing results, we provide a complete complexity classification of the relevant two-stage no-wait scheduling models.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper considers the job shop scheduling problem to minimize the makespan. It is assumed that each job consists of at most two operations, one of which is to be processed on one of m⩾2 machines, while the other operation must be performed on a single bottleneck machine, the same for all jobs. For this strongly NP-hard problem we present two heuristics with improved worst-case performance. One of them guarantees a worst-case performance ratio of 3/2. The other algorithm creates a schedule with the makespan that exceeds the largest machine workload by at most the length of the largest operation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reviews of: [1] James E. Hoch, Semitic Words in Egyptian Texts of the New Kingdom and Third Intermediate Period, (1994), Princeton University Press. [2] Daniel Sivan and Zipora Cochavi-Rainey, West Semitic Vocabulary in Egyptian Script of the 14th to the 10th Centuries BCE, (1992), Ben-Gurion University of the Negev Press.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is known that for the open shop scheduling problem to minimize the makespan there exists no polynomial-time heuristic algorithm that guarantees a worst-case performance ratio better than 5/4, unless P6≠NP. However, this result holds only if the instance of the problem contains jobs consisting of at least three operations. This paper considers the open shop scheduling problem, provided that each job consists of at most two operations, one of which is to be processed on one of the m⩾2 machines, while the other operation must be performed on the bottleneck machine, the same for all jobs. For this NP-hard problem we present a heuristic algorithm and show that its worst-case performance ratio is 5/4.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Comments on the Chancery Division decision in Clarence House Ltd v National Westminster Bank Plc on whether the alienation covenant in a lease of commercial premises had been breached by the tenant effecting a virtual assignment of it, under which all the economic benefits and burdens of the lease were transferred to a third party without there being any actually assignment of the leasehold interest or change in occupancy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This, the third part of a three-part article on the contractual termination of leases, examines, with reference to UK and Commonwealth case law, the connection between contractual termination and the provisions of legislation including the the Landlord and Tenant Act 1954 Pt II relating to forfeiture and termination of business tenancies. Considers why contractual termination by acceptance of a repudiatory breach is a necessary development to protect tenants in the event of a landlord's significant default.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Examines the Court of Appeal ruling in Midill (97PL) Ltd v Park Lane Estates Ltd on whether the court should exercise its discretion to return a deposit paid under a contract for the sale of a property where, despite the claimant having defaulted on its purchase, the owner obtained a higher price than would have been paid by the claimant when it subsequently sold the property to a third party. Considers the need for special or exceptional circumstances to be present to override the rule that deposits were to be forfeited upon the purchaser's default.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Examines the Chancery Division ruling in London Development Agency v Nidai on whether a number of agreements providing for the construction of a bridge and shop premises on the retaining walls of a river resulted in a binding legal lease or a series of bare licences. Comments on the failure of the judgment to mention the House of Lords ruling in Bruton v London & Quadrant Housing Trust and discusses whether a Bruton tenancy is capable of binding third parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The spillway of Lake Waxahachie, Ellis County (Texas), exposes a > 17 m section of the Hutchins Member of the Austin Chalk Group, un-conformably overlain by Taylor Clay. The Austin sequence was regarded as a potential Global Stratotype Section for the base of the Campanian Stage at the 1995 Brussels meeting on Cretaceous Stage boundaries, with the last occurrence of the crinoid Marsupites testudinarius (von Schlotheim, 1820) as the potential boundary marker. An integrated study of the geochemistry, stable carbon and oxgen isotopes, nannofossils, planktonic foraminifera, inoceramid bivalves, ammonites and crinoids of this section place the last occurrence of M. testudinarius in a matrix of eighteen ancillary biostratigraphic markers, while the boundary can also be recognised on the basis of a delta C-13 excursion that can, in principle, be detected globally in marine sediments. A new forma of the crinoid Marsupites testudinarius is introduced. The Waxahachie section fulfils sufficient geological criteria as to be an excellent candidate GSSP for the base of the Campanian Stage, if problems of ownership and access to the section can be resolved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In advanced non-small cell lung cancer (NSCLC) platinum based chemotherapy with second generation drugs improves median survival (MS) to 8 months and 29% and 10% at 1 and 2 years. Platinum with a third generation drug can improve survival further (BMJ 1995;311: 899) (Spiro et al. Thorax 2004;59:828 Big Lung Trial; N Engl J Med 2003;346:92 ECOG study). NICE now recommends chemotherapy with platinum and a third generation drug for inoperable NSCLC as the first treatment modality. Methods: We audited survival of 176/461 consecutive patients referred for at least 3 courses of platinum and either gemcitabine or vinorelbine from July 2001 to December 2005. Minimal follow up 17 months. Chemotherapy was given on site. Radical radiotherapy for stage IIIA, palliative radiotherapy and second line drugs were given as felt appropriate. Results: 64% were male. 30 (17%) were <55 years ; 66 (37.5%) age 55–65 years; 63 (35.8%) aged 66–75 and 16 (9.1%) >75 years. 5 (2.8%) were stage II; 46 (26%) stage IIIA; 68 (38%) stage IIIB and 55 (30.8%) stage IV. 68 (38%) had 0– 2 courses; 63 (36%) 3 courses and 44 (25%) had 4 or more.