3 resultados para Hearning and visual problem
em Greenwich Academic Literature Archive - UK
Resumo:
We consider a knapsack problem to minimize a symmetric quadratic function. We demonstrate that this symmetric quadratic knapsack problem is relevant to two problems of single machine scheduling: the problem of minimizing the weighted sum of the completion times with a single machine non-availability interval under the non-resumable scenario; and the problem of minimizing the total weighted earliness and tardiness with respect to a common small due date. We develop a polynomial-time approximation algorithm that delivers a constant worst-case performance ratio for a special form of the symmetric quadratic knapsack problem. We adapt that algorithm to our scheduling problems and achieve a better performance. For the problems under consideration no fixed-ratio approximation algorithms have been previously known.
Resumo:
We consider a single machine due date assignment and scheduling problem of minimizing holding costs with no tardy jobs tinder series parallel and somewhat wider class of precedence constraints as well as the properties of series-parallel graphs.
Resumo:
An Internet based supply chain simulation game (ISCS) is introduced and demonstrated in this paper. Different from other games and extended from the Beer Game, a comprehensive set of supply chain (SC) management strategies can be tested in the game, and these strategies can be evaluated and appraised based on the built-in Management Information System (MIS). The key functionalities of ISCS are designed to increase players SC awareness, facilitate understanding on various SC strategies and challenges, foster collaboration between partners, and improve problem solving skills. It is concluded that an ISCS can be used as an efficient and effective teaching tool as well as a research tool in operations research and management science. Problems and obstacles have been observed while engaging in the SC business scenario game. The actions proposed and implemented to solve these problems have resulted in improved SC performance.