7 resultados para FRP-concrete bond
em Greenwich Academic Literature Archive - UK
Resumo:
In this paper, thermal cycling reliability along with ANSYS analysis of the residual stress generated in heavy-gauge Al bond wires at different bonding temperatures is reported. 99.999% pure Al wires of 375 mum in diameter, were ultrasonically bonded to silicon dies coated with a 5mum thick Al metallisation at 25degC (room temperature), 100degC and 200degC, respectively (with the same bonding parameters). The wire bonded samples were then subjected to thermal cycling in air from -60degC to +150degC. The degradation rate of the wire bonds was assessed by means of bond shear test and via microstructural characterisation. Prior to thermal cycling, the shear strength of all of the wire bonds was approximately equal to the shear strength of pure aluminum and independent of bonding temperature. During thermal cycling, however, the shear strength of room temperature bonded samples was observed to decrease more rapidly (as compared to bonds formed at 100degC and 200degC) as a result of a high crack propagation rate across the bonding area. In addition, modification of the grain structure at the bonding interface was also observed with bonding temperature, leading to changes in the mechanical properties of the wire. The heat and pressure induced by the high temperature bonding is believed to promote grain recovery and recrystallisation, softening the wires through removal of the dislocations and plastic strain energy. Coarse grains formed at the bonding interface after bonding at elevated temperatures may also contribute to greater resistance for crack propagation, thus lowering the wire bond degradation rate
Resumo:
Despite being exposed to the harsh sea-spray environment of the North Sea at Arbroath, Scotland, for over 63 years, many of the reinforced concrete precast beam elements of the 1.5 km long promenade railing are still in very good condition and show little evidence of reinforcement corrosion. In contrast, railing replacements constructed in about 1968 and in 1993 are almost all badly cracked as a result of extensive corrosion of the longitudinal reinforcement. This is despite the newer concrete appearing to be of better quality than the 1943 concrete. Statistics for maximum crack width for each of the three populations, based on measurements made in 2004 and in 2006, are presented. In situ and laboratory measurements show that the 1943 concrete appears to have high permeability but it also shows high electrical resistivity. Chloride penetration measurements show the 1943 and 1993 concretes to have similar chloride profiles and similar chloride concentrations at the reinforcement bars. This is inconsistent with the 1943 beams showing much less reinforcement corrosion than their later replacements and casts doubt on the conventional practice for durability design focusing on reducing concrete permeability through denser concretes or greater cover.
Resumo:
The corrosion of steel reinforcement bars in reinforced concrete structures exposed to severe marine environments usually is attributed to the aggressive nature of chloride ions. In some cases in practice corrosion has been observed to commence already within a few years of exposure even with considerable concrete cover to the reinforcement and apparently high quality concretes. However, there are a number of other cases in practice for which corrosion initiation took much longer, even in cases with quite modest concrete cover and modest concrete quality. Many of these structures show satisfactory long-term structural performance, despite having high levels of localized chloride concentrations at the reinforcement. This disparity was noted already more than 50 years ago, but appears still not fully explained. This paper presents a systematic overview of cases reported in the engineering and corrosion literature and considers possible reasons for these differences. Consistent with observations by others, the data show that concretes made from blast furnace cements have better corrosion durability properties. The data also strongly suggest that concretes made with limestone or non-reactive dolomite aggregates or sufficiently high levels of other forms of calcium carbonates have favourable reinforcement corrosion properties. Both corrosion initiation and the onset of significant damage are delayed. Some possible reasons for this are explored briefly.
Resumo:
The aim of this study was determine whether bonding of glass-ionomer cements to non-carious dentine differed from that to carious dentine. Five commercial cements were used, namely Fuji IX GP, Fuji IX capsulated, Fuji IX Fast capsulated (all GC, Japan), Ketac-Molar and Ketac-Molar Aplicap (both 3M-ESPE, Germany). Following conditioning of the substrate with 10% poly (acrylic acid) for 10 s, sets of 10 samples of the cements were bonded to prepared teeth that had been removed for orthodontic reasons. The teeth used had either sound dentine or sclerotic dentine. Shear bond strengths were determined following 24 h storage. For the auto-mixed cements, shear bond strength to sound dentine was found not to differ statistically from shear bond strength to sclerotic dentine whereas for hand-mixed cements, shear bond to sound dentine was found to be higher than to carious dentine (to at least p < 0.05). This shows that the chemical effects arising from interactions of glass-ionomer cements with the mineral phase of the tooth are the most important in developing strong bonds, at least in the shorter term.
Resumo:
Based on extensive research on reinforcing steel corrosion in concrete in the past decades, it is now possible to estimate the effect of the progression of reinforcement corrosion in concrete infrastructure on its structural performance. There are still areas of considerable uncertainty in the models and in the data available, however This paper uses a recently developed model for reinforcement corrosion in concrete to improve the estimation process and to indicate the practical implications. In particular stochastic models are used to estimate the time likely to elapse for each phase of the whole corrosion process: initiation, corrosion-induced concrete cracking, and structural strength reduction. It was found that, for practical flexural structures subject to chloride attacks, corrosion initiation may start quite early in their service life. It was also found that, once the structure is considered to be unserviceable due to corrosion-induced cracking, there is considerable remaining service life before the structure can be considered to have become unsafe. The procedure proposed in the paper has the potential to serve as a rational tool for practitioners, operators, and asset managers to make decisions about the optimal timing of repairs, strengthening, and/or rehabilitation of corrosion-affected concrete infrastructure. Timely intervention has the potential to prolong the service life of infrastructure.
Resumo:
For existing reinforced concrete structures exposed to saline or marine conditions, there is an increasing engineering interest in their remaining safety and serviceability. A significant factor is the corrosion of steel reinforcement. At present there is little field experience and other data available. This limits the possibility for developing purely empirical models for strength and performance deterioration for use in structural safety and serviceability assessment. An alternative approach using theoretical concepts and probabilistic modeling is proposed herein. It is based on the evidence that the rate of diffusion of chlorides is influenced by internal damage to the concrete surrounding the reinforcement. This may be due to localized stresses resulting from external loading or through concrete shrinkage. Usually, the net effect is that the time to initiation of active corrosion is shortened, leading to greater localized corrosion and earlier reduction of ultimate capacity and structural stiffness. The proposed procedure is applied to an example beam and compared to experimental observations,including estimates of uncertainty in the remaining ultimate moment capacity and beam stiffness. Reasonably good agreement between the results of the proposed procedure and the experiment was found
Resumo:
This paper describes the condition of a reinforced concrete balustrade consisting of some 1000 individual beam elements all exposed similarly to the hostile marine environment of the North Sea at Arbroath, Scotland since 1943. A comparison is made of the condition of the original construction with the condition of repairs carried out in 1968 and in 1993. It is shown that the 1943 construction shows very little corrosion-induced cracking and little rust staining even though it does not appear to be of high construction quality. Only a very low percentage of the balustrade beams have been replaced. In contrast the beam installed in 1968 and later in 1993 show very considerable and large concrete cracks directly attributable to the corrosion of the longitudinal reinforcement, even though the concrete is of a higher quality and density. A detailed condition survey and statistics of crack sizes are presented in the paper. It is found that the higher corrosion resistance of the 1943 concrete is generally consistent with the concrete electrical resistivity measurements but the degree of corrosion of the reinforcing bars is inconsistent with chloride penetration measurements. The results are compared with the very few observations available in the literature for ageing concrete structures in marine environments. The results cast doubt on the conventional wisdom that chloride content at the reinforcement correlates well with reinforcement corrosion.