5 resultados para Close and open communion.

em Greenwich Academic Literature Archive - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we study a problem of scheduling and batching on two machines in a flow-shop and open-shop environment. Each machine processes operations in batches, and the processing time of a batch is the sum of the processing times of the operations in that batch. A setup time, which depends only on the machine, is required before a batch is processed on a machine, and all jobs in a batch remain at the machine until the entire batch is processed. The aim is to make batching and sequencing decisions, which specify a partition of the jobs into batches on each machine, and a processing order of the batches on each machine, respectively, so that the makespan is minimized. The flow-shop problem is shown to be strongly NP-hard. We demonstrate that there is an optimal solution with the same batches on the two machines; we refer to these as consistent batches. A heuristic is developed that selects the best schedule among several with one, two, or three consistent batches, and is shown to have a worst-case performance ratio of 4/3. For the open-shop, we show that the problem is NP-hard in the ordinary sense. By proving the existence of an optimal solution with one, two or three consistent batches, a close relationship is established with the problem of scheduling two or three identical parallel machines to minimize the makespan. This allows a pseudo-polynomial algorithm to be derived, and various heuristic methods to be suggested.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we consider the problem of providing flexibility to solutions of two-machine shop scheduling problems. We use the concept of group-scheduling to characterize a whole set of schedules so as to provide more choice to the decision-maker at any decision point. A group-schedule is a sequence of groups of permutable operations defined on each machine where each group is such that any permutation of the operations inside the group leads to a feasible schedule. Flexibility of a solution and its makespan are often conflicting, thus we search for a compromise between a low number of groups and a small value of makespan. We resolve the complexity status of the relevant problems for the two-machine flow shop, job shop and open shop. A number of approximation algorithms are developed and their worst-case performance is analyzed. For the flow shop, an effective heuristic algorithm is proposed and the results of computational experiments are reported.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The so-called dividing instant (DI) problem is an ancient historical puzzle encountered when attempting to represent what happens at the boundary instant which divides two successive states. The specification of such a problem requires a thorough exploration of the primitives of the temporal ontology and the corresponding time structure, as well as the conditions that the resulting temporal models must satisfy. The problem is closely related to the question of how to characterize the relationship between time periods with positive duration and time instants with no duration. It involves the characterization of the ‘closed’ andopen’ nature of time intervals, i.e. whether time intervals include their ending points or not. In the domain of artificial intelligence, the DI problem may be treated as an issue of how to represent different assumptions (or hypotheses) about the DI in a consistent way. In this paper, we shall examine various temporal models including those based solely on points, those based solely on intervals and those based on both points and intervals, and point out the corresponding DI problem with regard to each of these temporal models. We shall propose a classification of assumptions about the DI and provide a solution to the corresponding problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we study the two-machine flow shop and open shop problems to minimize the makespan with a single interstage transporter that may carry any number of jobs between the machines at a time. For each of these problems we present a best possible approximation algorithm within a class of schedules with at most two shipments. As a by-product of this research, for the problem of minimizing the makespan on parallel identical machines we analyze the ratio of the makespan for a non-preemptive schedule over the makespan of a preemptive schedule.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Zaha Hadid's Kartal Pendik Masterplan (2006) for a new city centre on the east bank of Istanbul proposes the redevelopment of an abandoned industrial site located in a crucial infrastructural node between Europe and Asia as a connecting system between the neighbouring areas of Kartal in the west and Pendik in the east. The project is organised on what its architects call a soft grid, a flexible and adaptable grid that allows it to articulate connections and differences of form, density and use within the same spatial structure [1]. Its final overall design constitutes only one of the many possible configurations that the project may take in response to the demands of the different areas included in the masterplan, and is produced from a script that is able to generate both built volumes and open spaces, skyscrapers as well as parks. The soft grid in fact produces a ‘becoming’ rather than a finite and definitive form: its surface space does not look like a grid, but is derived from a grid operation which is best explained by the project presentation in video animation. The grid here is a process of ‘gridding’, enacted according to ancient choreographed linear movements of measuring, defining, adjusting, reconnecting spaces through an articulated surface rather than superimposed on an ignored given like an indifferent colonising carpet.