3 resultados para 809

em Greenwich Academic Literature Archive - UK


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This presentation will attempt to address the issue of whether the engineering design community has the knowledge, data and tool sets required to undertake advanced evacuation analysis. In discussing this issue I want to draw on examples not only from the building industry but more widely from where ever people come into contact with an environment fashioned by man. Prescriptive design regulations the world over suggest that if we follow a particular set of essentially configurational regulations concerning travel distances, number of exits, exit widths, etc it should be possible to evacuate a structure within a pre-defined acceptable amount of time. In the U.K. for public buildings this turns out to be 2.5 minutes, internationally in the aviation industry this is 90 seconds, in the UK rail industry this is 90 seconds and the international standard adopted by the maritime industry is 60 minutes. The difficulties and short comings of this approach are well known and so I will not repeat them here, save to say that this approach is usually littered with “magic numbers” that do not stand up to scrutiny. As we are focusing on human behaviour issues, it is also worth noting that more generally, the approach fails to take into account how people actually behave, preferring to adopt an engineer’s view of what people should do in order to make their design work. Examples of the failure of this approach are legion and include the; Manchester Boeing 737 fire, Kings Cross underground station fire, Piper Alpha oil platform explosion, Ladbroke Grove Rail crash and fire, Mont Blanc tunnel fire, Scandinavian Star ferry fire and the Station Nightclub fire.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we consider the problem of providing flexibility to solutions of two-machine shop scheduling problems. We use the concept of group-scheduling to characterize a whole set of schedules so as to provide more choice to the decision-maker at any decision point. A group-schedule is a sequence of groups of permutable operations defined on each machine where each group is such that any permutation of the operations inside the group leads to a feasible schedule. Flexibility of a solution and its makespan are often conflicting, thus we search for a compromise between a low number of groups and a small value of makespan. We resolve the complexity status of the relevant problems for the two-machine flow shop, job shop and open shop. A number of approximation algorithms are developed and their worst-case performance is analyzed. For the flow shop, an effective heuristic algorithm is proposed and the results of computational experiments are reported.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper discusses the reliability of an IGBT power electronics module. This work is part of a major UK funded initiative into the design, packaging and reliability of power electronic modules. The predictive methodology combines numerical modeling techniques with experimentation and accelerated testing to identify failure modes and mechanisms for these type of power electronic module structures. The paper details results for solder joint failure substrate solder. Finite element method modeling techniques have been used to predict the stress and strain distribution within the module structures. Together with accelerated life testing, these results have provided a failure model for these joints which has been used to predict reliability of a rail traction application