65 resultados para Job Shop Problem


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper considers a variant of the classical problem of minimizing makespan in a two-machine flow shop. In this variant, each job has three operations, where the first operation must be performed on the first machine, the second operation can be performed on either machine but cannot be preempted, and the third operation must be performed on the second machine. The NP-hard nature of the problem motivates the design and analysis of approximation algorithms. It is shown that a schedule in which the operations are sequenced arbitrarily, but without inserted machine idle time, has a worst-case performance ratio of 2. Also, an algorithm that constructs four schedules and selects the best is shown to have a worst-case performance ratio of 3/2. A polynomial time approximation scheme (PTAS) is also presented.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper considers two-machine flow shop scheduling problems with machine availability constraints. When the processing of a job is interrupted by an unavailability period of a machine, we consider both the resumable scenario in which the processing can be resumed when the machine next becomes available, and the semi-resumable scenario in which some portion of the processing is repeated but the job is otherwise resumable. For the problem with several non-availability intervals on the first machine under the resumable scenario, we present a fast (3/2)-approximation algorithm. For the problem with one non-availability interval under the semi-resumable scenario, a polynomial-time approximation scheme is developed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We study a two-machine open shop scheduling problem, in which one machine is not available for processing during a given time interval. The objective is to minimize the makespan. We show that the problem is NP-hard and present an approximation algorithm with a worst-case ratio of 4/3.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We study a two-machine open shop scheduling problem, in which the machines are not continuously available for processing. No preemption is allowed in the processing of any operation. The objective is to minimize the makespan. We consider approximability issues of the problem with more than one non-availability intervals and present an approximation algorithm with a worst-case ratio of 4/3 for the problem with a single non-availability interval.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper we study the two-machine flow shop and open shop problems to minimize the makespan with a single interstage transporter that may carry any number of jobs between the machines at a time. For each of these problems we present a best possible approximation algorithm within a class of schedules with at most two shipments. As a by-product of this research, for the problem of minimizing the makespan on parallel identical machines we analyze the ratio of the makespan for a non-preemptive schedule over the makespan of a preemptive schedule.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper we provide a fairly complete complexity classification of various versions of the two-machine permutation flow shop scheduling problem to minimize the makespan in which some of the jobs have to be processed with no-wait in process. For some version, we offer a fully polynomial-time approximation scheme and a 43-approximation algorithm.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We consider the two-machine open shop scheduling problem in which the jobs are brought to the system by a single transporter and moved between the processing machines by the same transporter. The purpose is to split the jobs into batches and to find the sequence of moves of the transporter so that the time by which the completed jobs are collected together on board the transporter is minimal. We present a 7/5-approximation algorithm. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, we provide a unified approach to solving preemptive scheduling problems with uniform parallel machines and controllable processing times. We demonstrate that a single criterion problem of minimizing total compression cost subject to the constraint that all due dates should be met can be formulated in terms of maximizing a linear function over a generalized polymatroid. This justifies applicability of the greedy approach and allows us to develop fast algorithms for solving the problem with arbitrary release and due dates as well as its special case with zero release dates and a common due date. For the bicriteria counterpart of the latter problem we develop an efficient algorithm that constructs the trade-off curve for minimizing the compression cost and the makespan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Approximately 85,000 part-time teaching staff working in further education (FE) and adult and community learning (ACL) are often seen as ‘a problem’. The intrinsic ‘part-timeness’ of these staff tends to marginalise them: they remain under-recognised and largely unsupported. Yet this picture is over-simplified. This article examines how part-time staff make creative use of professional autonomy and agency to mitigate problematic ‘casual employment’ conditions, reporting on results from Learning and Skills Development Agency-sponsored research (2002–2006) with 700 part-time staff in the learning and skills sector. The question of agency was reported as a key factor in part-time employment. Change is necessary for the professional agency of part-timers to be harnessed as the sector responds to ambitious sectoral ‘improvement’ agendas following the Foster Report and FE White Paper. Enhanced professionalisation for part-time staff needs greater recognition and inclusion in change agendas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of 'nested methods' is adopted to solve the location-routeing problem. Unlike the sequential and iterative approaches, in this method we treat the routeing element as a sub-problem within the larger problem of location. Efficient techniques that take into account the above concept and which use a neighbourhood structure inspired from computational geometry are presented. A simple version of tabu search is also embedded into our methods to improve the solutions further. Computational testing is carried out on five sets of problems of 400 customers with five levels of depot fixed costs, and the results obtained are encouraging.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper considers the single machine due date assignment and scheduling problems with n jobs in which the due dates are to be obtained from the processing times by adding a positive slack q. A schedule is feasible if there are no tardy jobs and the job sequence respects given precedence constraints. The value of q is chosen so as to minimize a function ϕ(F,q) which is non-decreasing in each of its arguments, where F is a certain non-decreasing earliness penalty function. Once q is chosen or fixed, the corresponding scheduling problem is to find a feasible schedule with the minimum value of function F. In the case of arbitrary precedence constraints the problems under consideration are shown to be NP-hard in the strong sense even for F being total earliness. If the precedence constraints are defined by a series-parallel graph, both scheduling and due date assignment problems are proved solvable in time, provided that F is either the sum of linear functions or the sum of exponential functions. The running time of the algorithms can be reduced to if the jobs are independent. Scope and purpose We consider the single machine due date assignment and scheduling problems and design fast algorithms for their solution under a wide range of assumptions. The problems under consideration arise in production planning when the management is faced with a problem of setting the realistic due dates for a number of orders. The due dates of the orders are determined by increasing the time needed for their fulfillment by a common positive slack. If the slack is set to be large enough, the due dates can be easily maintained, thereby producing a good image of the firm. This, however, may result in the substantial holding cost of the finished products before they are brought to the customer. The objective is to explore the trade-off between the size of the slack and the arising holding costs for the early orders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper the many to many location routing problem is introduced, and its relationship to various problems in distribution management is emphasised. Useful mathematical formulations which can be easily extended to cater for other related problems are produced. Techniques for tackling this complex distribution problem are also outlined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main interest in the assessment of forest species diversity for conservation purposes is in the rare species. The main problem in the tropical rain forests is that most of the species are rare. Assessment of species diversity in the tropical rain forests is therefore often concerned with estimating that which is not observed in recorded samples. Statistical methodology is therefore required to try to estimate the truncated tail of the species frequency distribution, or to estimate the asymptote of species/diversity-area curves. A Horvitz-Thompson estimator of the number of unobserved (“virtual”) species in each species intensity class is proposed. The approach allows a definition of an extended definition of diversity, ( or generalised Renyi entropy). The paper presents a case study from data collected in Jambi, Sumatra, and the “extended diversity measure” is used on the species data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is NP-hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst-case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two-machine flow shop and the open shop problems with a single server are also shown to be NP-hard in the strong sense. However, we reduce the two-machine flow shop no-wait problem with a single server to the Gilmore-Gomory traveling salesman problem and solve it in polynomial time. (c) 2000 John Wiley & Sons, Inc.