2 resultados para Learning space design
em Duke University
Resumo:
Line drawings were presented in either a spatial or a nonspatial format. Subjects recalled each of four sets of 24 items in serial order. Amount recalled in the correct serial order and sequencing errors were scored. In Experiment 1 items appeared either in consecutive locations of a matrix or in one central location. Subjects who saw the items in different locations made fewer sequencing errors than those who saw each item in a central location, but serial recall levels for these two conditions did not differ. When items appeared in nonconsecutive locations in Experiment 2, the advantage of the spatial presentation on sequencing errors disappeared. Experiment 3 included conditions in which both the consecutive and nonconsecutive spatial formats were paired with retrieval cues that either did or did not indicate the sequence of locations in which the items had appeared. Spatial imagery aided sequencing when, and only when, the order of locations in which the stimuli appeared could be reconstructed at retrieval.
Resumo:
The Duke University Medical Center Library and Archives is located in the heart of the Duke Medicine campus, surrounded by Duke Hospital, ambulatory clinics, and numerous research facilities. Its location is considered prime real estate, given its adjacency to patient care, research, and educational activities. In 2005, the Duke University Library Space Planning Committee had recommended creating a learning center in the library that would support a variety of educational activities. However, the health system needed to convert the library's top floor into office space to make way for expansion of the hospital and cancer center. The library had only five months to plan the storage and consolidation of its journal and book collections, while working with the facilities design office and architect on the replacement of key user spaces on the top floor. Library staff worked together to develop plans for storing, weeding, and consolidating the collections and provided input into renovation plans for users spaces on its mezzanine level. The library lost 15,238 square feet (29%) of its net assignable square footage and a total of 16,897 (30%) gross square feet. This included 50% of the total space allotted to collections and over 15% of user spaces. The top-floor space now houses offices for Duke Medicine oncology faculty and staff. By storing a large portion of its collection off-site, the library was able to remove more stacks on the remaining stack level and convert them to user spaces, a long-term goal for the library. Additional space on the mezzanine level had to be converted to replace lost study and conference room spaces. While this project did not match the recommended space plans for the library, it underscored the need for the library to think creatively about the future of its facility and to work toward a more cohesive master plan.