3 resultados para Factory automation

em Duke University


Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES: To assess the prevalence of musculoskeletal symptoms and their association with sociodemographic risk factors among female garment factory workers in Sri Lanka. METHODS: 1058 randomly selected female garment factory workers employed in the free trade zone of Kogalla, Sri Lanka were recruited to complete two interviewer-administered questionnaires assessing musculoskeletal symptoms and health behaviors. DISCUSSION: Musculoskeletal complaints among female garment workers in the FTZ of Kogalla are less common than expected. Sociocultural factors may have resulted in underreporting and similarly contribute to the low rates of healthcare utilization by these women. RESULTS: 164 (15.5%) of workers reported musculoskeletal symptoms occurring more than 3 times or lasting a week or more during the previous 12-month period. Back (57.3%) and knee (31.7%) were the most common sites of pain. Although most symptomatic women reported that their problems interfered with work and leisure activities, very few missed work as a result of their pain. Prevalence correlated positively with increased age and industry tenure of less than 12 months. Job type, body mass index, and education were not significant predictors of musculoskeletal symptoms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

© The Author 2014.Factory farming continues to grow around the world as a low-cost way of producing animal products for human consumption. However, many of the practices associated with intensive animal farming have been criticized by public health professionals and animal welfare advocates. The aim of this essay is to raise three independent moral concerns with factory farming, and to explain why the practices associated with factory farming flourish despite the cruelty inflicted on animals and the public health risks imposed on people. I conclude that the costs of factory farming as it is currently practiced far outweigh the benefits, and offer a few suggestions for how to improve the situation for animals and people.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing prevalence and capabilities of autonomous systems as part of complex heterogeneous manned-unmanned environments (HMUEs), an important consideration is the impact of the introduction of automation on the optimal assignment of human personnel. The US Navy has implemented optimal staffing techniques before in the 1990's and 2000's with a "minimal staffing" approach. The results were poor, leading to the degradation of Naval preparedness. Clearly, another approach to determining optimal staffing is necessary. To this end, the goal of this research is to develop human performance models for use in determining optimal manning of HMUEs. The human performance models are developed using an agent-based simulation of the aircraft carrier flight deck, a representative safety-critical HMUE. The Personnel Multi-Agent Safety and Control Simulation (PMASCS) simulates and analyzes the effects of introducing generalized maintenance crew skill sets and accelerated failure repair times on the overall performance and safety of the carrier flight deck. A behavioral model of four operator types (ordnance officers, chocks and chains, fueling officers, plane captains, and maintenance operators) is presented here along with an aircraft failure model. The main focus of this work is on the maintenance operators and aircraft failure modeling, since they have a direct impact on total launch time, a primary metric for carrier deck performance. With PMASCS I explore the effects of two variables on total launch time of 22 aircraft: 1) skill level of maintenance operators and 2) aircraft failure repair times while on the catapult (referred to as Phase 4 repair times). It is found that neither introducing a generic skill set to maintenance crews nor introducing a technology to accelerate Phase 4 aircraft repair times improves the average total launch time of 22 aircraft. An optimal manning level of 3 maintenance crews is found under all conditions, the point at which any additional maintenance crews does not reduce the total launch time. An additional discussion is included about how these results change if the operations are relieved of the bottleneck of installing the holdback bar at launch time.