3 resultados para dynamique trash

em DRUM (Digital Repository at the University of Maryland)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gemstone Team GREEN JUSTICE

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The relationship between industry, waste, and urbanism is one fraught with problems across the United States and in particular American cities. The interrelated nature of these systems of flows is in critical need of re-evaluation. This thesis critiques the system of Municipal Solid Waste Management as it currently exists in American cities as a necessary yet undesirable ‘invisible infrastructure’. Industry and waste environments have been pushed to the periphery of urban environments, severing the relationship between the urban environment we inhabit and the one that is required to support the way we live. The flow of garbage from cities of high density to landscapes of waste has created a model of valuing waste as a linear system that separates input from output. This thesis aims to investigate ways that industry, waste, and urban ecologies can work to reinforce one another. The goal of this thesis is to repair the physical and mental separation of waste and public activity through architecture. This thesis will propose ways to tie urban waste infrastructure and public amenities together through the merging of architecture and landscape to create new avenues for public engagement with waste processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Intensive archaeological investigation was undertaken on an urban backlot in Annapolis, Maryland. Fieldwork was conducted on behalf of Historic Annapolis Foundation for the property's owners, King and Cornwall, Inc. Supplemental documentary research, an evaluation of existing conditions on the property, and below-ground excavation of a 35 X 70 ft. urban backlot were conducted. While the project was not a Section 106 compliance effort, the field methods and rationale for the site's investigation are comparable to those of standard Phase II site evaluations. Historical documentation attested to the fact that the 22 West Street Backlot, located along the western most edge of the Historic District of Annapolis, Maryland, had seen development and occupation since the first quarter of the eighteenth century. A substantial brick structure was known to have occupied the property in a series of altered forms for much of that period. This structure served a variety of purposes over time: a private residence in the eighteenth century, a boarding house in the nineteenth century (known as the National Hotel), a duplex in the early twentieth century, half of which remained in use until the structure was entirely razed in the 1970s after destruction by fire. Recovery and analysis of site formation processes (i.e., both cultural and natural transformations of the buried remains) indicated that sections of the site were disturbed to a depth of six feet. In contrast to what initially seemed a poor prognosis for site integrity, other areas of the backlot revealed numerous intact historical features and deposits. Structural remains from the dwelling and its associated outbuildings, additions, and attendant trash deposits were recovered. What was initiated as a program of limited testing evolved into a larger-scale undertaking that made use of largely hand-excavated units in conjunction with machine-assisted stripping of areas demonstrated to contain from four to six-foot deep sterile layers of fill. The current investigations provided a window into a portion of the city and period in its history not documented archaeologically. Moreover, this project provided valuable insight into the archaeology of the homelot within a lightly industrialized, urban context. Evidence was recovered of shifts in the layout and arrangement of the houselot as well as changing relations between individuals and the workplace--all within an urban context--an issue defined elsewhere in the archaeological literature as a significant one. No further investigations are recommended for the site, however, further analysis and interpretation of materials recovered are ongoing. In the event that the site were to undergo development, monitoring of any construction activity is recommended.