7 resultados para Jones, John, -1994?
em DRUM (Digital Repository at the University of Maryland)
Resumo:
In the fall of 1989, emergency excavation was undertaken in conjunction with restoration work at the John Brice II (Jennings-Brice) House, 18AP53. The exact date of construction for this brick home is problematic, and it was hoped that archaeological investigation could provide conclusive evidence to firmly establish the structure's date of construction. Excavation of one 5 X 5 ft. unit revealed the presence of 10 separate soil layers and four features of note, described in detail below. Unfortunately, no builders trench or similar feature by which we might date the house's construction was recovered. Future plans and possibilities for excavation at the property are outlined with the hopes of performing subsequent work at this rich site. We anticipate a focus on the arrangement and changes in use of the houselot, amassing evidence to support the presence of a vernacular garden on the property during the 18th century, as well as researching refuse disposal patterns, and clues to changing lifeways through the 18th century.
Resumo:
During the summer of 1994, Archaeology in Annapolis conducted archaeological investigations of the city block bounded by Franklin, South and Cathedral Streets in the city of Annapolis. This Phase III excavation was conducted as a means to identify subsurface cultural resources in the impact area associated with the proposed construction of the Anne Arundel County Courthouse addition. This impact area included both the upper and lower parking lots used by Courthouse employees. Investigations were conducted in the form of mechanical trenching and hand excavated units. Excavations in the upper lot area yielded significant information concerning the interior area of the block. Known as Bellis Court, this series of rowhouses was constructed in the late nineteenth century and was used as rental properties by African-Americans. The dwellings remained until the middle of the twentieth century when they were demolished in preparation for the construction of a Courthouse addition. Portions of the foundation of a house owned by William H. Bellis in the 1870s were also exposed in this area. Construction of this house was begun by William Nicholson around 1730 and completed by Daniel Dulany in 1732/33. It was demolished in 1896 by James Munroe, a Trustee for Bellis. Excavations in the upper lot also revealed the remains of a late seventeenth/early eighteenth century wood-lined cellar, believed to be part of the earliest known structure on Lot 58. After an initially rapid deposition of fill around 1828, this cellar was gradually covered with soil throughout the remainder of the nineteenth century. The fill deposit in the cellar feature yielded a mixed assemblage of artifacts that included sherds of early materials such as North Devon gravel-tempered earthenware, North Devon sgraffito and Northem Italian slipware, along with creamware, pearlware and whiteware. In the lower parking lot, numerous artifacts were recovered from yard scatter associated with the houses that at one time fronted along Cathedral Street and were occupied by African- Americans. An assemblage of late seventeenth century/early eighteenth century materials and several slag deposits from an early forge were recovered from this second area of study. The materials associated with the forge, including portions of a crucible, provided evidence of some of the earliest industry in Annapolis. Investigations in both the upper and lower parking lots added to the knowledge of the changing landscape within the project area, including a prevalence of open space in early periods, a surprising survival of impermanent structures, and a gradual regrading and filling of the block with houses and interior courts. Excavations at the Anne Arundel County Courthouse proved this to be a multi-component site, rich in cultural resources from Annapolis' Early Settlement Period through its Modern Period (as specified by Maryland's Comprehensive Historic Preservation Plan (Weissman 1986)). This report provides detailed interpretations of the archaeological findings of these Phase III investigations.
Resumo:
Archaeological investigation at the Slayton House site in Annapolis revealed evidence of occupation of the lot since the early 18th century. The intact late 18th century ground surfaces on which John Ridout built the row houses, and subsequent changes in the landscape and use of the yard as work space in the 19th century were discovered. There was ample visible evidence of the early 20th century landscape and use of the yard as a pleasure garden when excavation was started. Deposits inside the house were quite disturbed, but there was evidence of the work done by the African Americans who lived there. A number of artifacts were found which may indicate the slaves and free African Americans were practicing African-related folk beliefs. No further investigations are recommended for the site. However, if severe or deep ground-disturbing activities were to take place on the property, they should be monitored by a qualified archaeologist.
Resumo:
193 Main Street (18AP44) is located between Main Street and Duke of Gloucester Street. The property was used ass a yard related to residential and commercial buildings during the 18th and 19th centuries. In the 1930's a movie theatre and parking lot were built on the property. That structure was torn down in the 1980's and a three-story commercial building was constructed. Archaeological excavations were conducted on the property from 1985-1987. A preliminary report was written in 1986 by Paul A. Shackel. This report is the final report on the archaeological investigations at 193 Main Street.
Resumo:
The Archaeological Reconnaissance Survey of United States Naval Academy will provide the Navy with a rich understanding of the history of this property. A National Register of Historic Places District, such as the Academy, deserves a thorough analysis of its past, in order to preserve what exists and to plan for the future. The goal of this project is to investigate the history of the Academy through traditional historic research, innovative computer analysis of historic maps, oral history interviews, and tract histories. This information has been synthesized to provide the Navy with a planning tool for Public Works, a concise look at the cartographic history of the Academy, and reference manual of the vast amounts of information which have been gathered during the course of this project. This information can serve as a reference tool to help the Public Works department comply with Section 106 regulations of the Historic Sites Preservation Act, with regard to construction. It can also serve as a source of cartographic history for those interested in the Academy's physical development, and as a way of preserving the culture of residents in Annapolis. This program and archaeological survey will ultimately serve to add to the rich history of the United States Naval Academy while preserving an important part of our nation's heritage.
Resumo:
Research indicates that school leaders are crucial to improving instruction and raising student achievement (Council of Chief State School Officers, 2008). As such, educational reforms such as the No Child Left Behind Act (2001) and Race to the Top (2009) have sparked an accountability movement where principals are being held accountable for students' academic achievement and educational outcomes. The shift towards greater accountability has placed new attention on the ways principals are trained. Researchers have noted that organized professional development programs have not adequately prepared school principals to meet the priority demands of the 21st century (Hale & Moorman, 2003; Murphy, 1994). Murphy (1994) stated, "Traditional preparation programs - usually pre-service programs based in colleges or universities, that awarded certification and advanced degrees - rarely concentrated on the leadership challenges that principals actually face in real schools" (p. 4). As a result, many school districts are seeking ways to develop leadership development training programs that will prepare principals for their job responsibilities as a school leader. In spite of the additional training principals receive, researchers suggests that there is an obvious gap between the readiness of administrators to be instructional leaders and the demands for accountability that school administrators face (Hale & Moorman, 2003). This quantitative study examined elementary school principals' perceptions of their leadership development training program. Guided by four research questions, the study examined principals' perceptions of their overall training and how well their training prepared them to deal with school and classroom practices that contribute to student achievement; to work with teachers and others to design and implement a system for continuous student achievement; and to provide necessary support to carry out sound school, curriculum, and instructional practices. Data for this study was collected by way of survey responses from a total of 46 elementary school principals. The results from the study revealed that more than half (58.7%) of participants perceived their training as excellent. While principals' perceived that their training adequately prepared them to work collaboratively in teams, set clear visions and goals, and to use data to improve students achievement, many respondents reported a lack of training in being informed and focused on student achievement. Principals also suggested that they were not effectively trained in finding effective ways to obtain support from central office or community members.