5 resultados para Waste Elimination
em DigitalCommons@University of Nebraska - Lincoln
Recommendations for Elimination of Bovine Tuberculosis in Free-Ranging White-Tailed Deer in Michigan
Resumo:
A significant infection rate of bovine TB in the deer population of the northeastern lower peninsula poses a potential risk to several important values including public health, United States Department of Agriculture (U.S.D.A.) TB-free accreditation for Michigan cattle, wildlife health, wildlife-related recreation and tourism and economic stability in several sectors. A risk assessment study by the U.S. D.A. Centers for Epidemiology and Animal Health (Fort Collins, CO) predicted that if no changes were made in the management of the affected free-ranging deer population, the TB prevalence (compared to the current prevalence of 2.3%). Although the current annual risk of TB transfer to cattle in the affected area is .I%, the report estimated a 12% cumulative risk that at least one head of cattle would become infected over the next 25 years if no changes are made in deer and/or cattle management.
Resumo:
A transparent (wide-area) wavelength-routed optical network may be constructed by using wavelength cross-connect switches connected together by fiber to form an arbitrary mesh structure. The network is accessed through electronic stations that are attached to some of these cross-connects. These wavelength cross-connect switches have the property that they may configure themselves into unspecified states. Each input port of a switch is always connected to some output port of the switch whether or not such a connection is required for the purpose of information transfer. Due to the presence of these unspecified states, there exists the possibility of setting up unintended alloptical cycles in the network (viz., a loop with no terminating electronics in it). If such a cycle contains amplifiers [e.g., Erbium- Doped Fiber Amplifiers (EDFA’s)], there exists the possibility that the net loop gain is greater than the net loop loss. The amplified spontaneous emission (ASE) noise from amplifiers can build up in such a feedback loop to saturate the amplifiers and result in oscillations of the ASE noise in the loop. Such all-optical cycles as defined above (and hereafter referred to as “white” cycles) must be eliminated from an optical network in order for the network to perform any useful operation. Furthermore, for the realistic case in which the wavelength cross-connects result in signal crosstalk, there is a possibility of having closed cycles with oscillating crosstalk signals. We examine algorithms that set up new transparent optical connections upon request while avoiding the creation of such cycles in the network. These algorithms attempt to find a route for a connection and then (in a post-processing fashion) configure switches such that white cycles that might get created would automatically get eliminated. In addition, our call-set-up algorithms can avoid the possibility of crosstalk cycles.
Resumo:
The phrase, “never let a crisis go to waste” may take frugality to a whole new level! That’s the sentiment of Lynda Applegate, Professor of Business Administration at the Harvard Business School, in a recent on-line article, Building Businesses in Turbulent Times.
Resumo:
The Livestock Waste Management Act requires all livestock operations with 300 animal units or more to be inspected by the Nebraska Department of Environmental Quality (DEQ) to determine whether livestock wastes contaminate surface or ground water. This NebFact discusses the following parts of the Livestock Waste Management Act: Act (how cited); Terms (defined); Livestock operation, exemption, livestock waste control facility, permit, restriction; Construction permit or operating permit (when required), livestock waste control facilities, classification, restrictions; Section (how construed); Cold water class A streams (designation); Permit (acknowledgment required); Livestock operation (request inspection, when, fees, department, duties); Permits (duration, modification); Permit (application and modification fees, Livestock Waste Management Cash Fund (created, use, investment, report, legislative intent); Applicant (rejection, grounds, application, information required, certification required); Postconstruction inspection requirement; Department (contracts authorized, permit application, notice required); Permit application (approval from Department of Natural Resources and Department of Environmental Quality, powers); Council (rules and regulations); and Enforcement of act (legislative intent).
Resumo:
Many bird species are attracted to landfills which take domestic or putrescible waste. These sites provide a reliable, rich source of food which can attract large concentrations of birds. The birds may cause conflicts with human interest with respect to noise, birds carrying litter off site, possible transmission of pathogens in bird droppings and the potential for birdstrikes. In the UK there is an 8 mile safeguarding radius around an airfield, within which any planning applications must pass scrutiny from regulatory bodies to show they will not attract birds into the area and increase the birdstrike risk. Peckfield Landfill site near Leeds, West Yorkshire was chosen for a trial of a netting system designed to exclude birds from domestic waste landfills. The site was assessed for bird numbers before the trial, during the netting trial and after the net had been removed. A ScanCord net was installed for 6 weeks, during which time all household waste was tipped inside the net. Gull numbers decreased on the site from a mean of 1074 per hourly count to 29 per hourly count after two days. The gull numbers increased again after the net had been removed. Bird concentrations in the surroundings were also monitored to assess the effect of the net. Bird numbers in the immediate vicinity of the landfill site were higher than those further away. When the net was installed, the bird concentrations adjacent to the landfill site decreased. Corvids were not affected by the net as they fed on covered waste which was available outside the net throughout the trial. This shows that bird problems on a landfill site are complex, requiring a comprehensive policy of bird control. A supporting bird scaring system and clear operating policy for sites near to airports would be required.