4 resultados para Projects and realizations
em DigitalCommons@University of Nebraska - Lincoln
Resumo:
This is a survey of the procurement, organization and use of unpublished projects, theses, and Africana mateials in Hezekiah Oluwasanmi Library, Obafemi Awolowo University, Ile-Ife, Nigeria. The Africana section conserves knowledge, preserves cultural heritage, provides information, and supports education and research. This paper the location, mode of processing, circulation, and terms of availability of these materials. Recommendations are made on how to manage Africana materials in academic libraries where they constitute a vital component of collections.
Resumo:
Small businesses are considered important engines for job growth and economic development by policy makers worldwide. One of the most commonly cited constraints of small businesses is a lack of access to capital. To address this constraint, small business loan guarantee programs have been established in over 100 countries. There are a variety of types of guarantee funds, with the most significant differences being which borrowers are eligible for guarantees, and how borrowers are approved for guarantees. There is currently no clear delineation between types of programs and the economic conditions they operate in, though some trends are becoming apparent. However, these trends may not be leading to the best economic outcomes possible. By better matching the structure of the guarantee fund to the economic conditions it operates in, the program’s success in meeting economic development goals may be greatly improved. Many programs in developing countries may not be taking advantage of bank expertise and may be limiting the scope of their effectiveness. At the same time, programs in developed countries may be wasting resources by scattering their efforts too thinly and subsidizing less competitive firms to the detriment of local economic development.
Resumo:
The October 1998 flood on the upper Guadalupe River system was produced by a 24-hour precipitation amount of 483 mm at one station, over 380 mm at several other stations, and up to 590 mm over five days, precipitation amounts greater than the 100-year storm as prescribed in Weather Bureau Technical Papers 40 (1961) and 49 (1964). This study uses slope-area discharge estimates and published discharge and precipitation data to analyze flow characteristics of the three major branches of the Guadalupe River on the Edwards Plateau. The main channel of the Guadalupe has a single large flood-control structure at Canyon Dam and five flood dams on the tributary Comal River. On the upper San Marcos River there are five detention dams that regulate 80% of its drainage. The Blanco River, which has no structural controls, generated a peak discharge of 2,970 m3/s from a 1,067 km2 basin. Downstream of Canyon Dam, the Guadalupe River generated a peak discharge greater than 3,000 m3/s from an area of 223 km2. The event exceeded the capacity of both the Comal River and San Marcos flood-control projects and produced spills that inundated areas greater than the 100-year floodplain defined by the Federal Emergency Management Agency.
Resumo:
Green buildings are becoming the new fixation for the building industry because of the impact they have on the carbon footprint and the cost savings they offer for utility costs. Governments have begun to produce policies and regulations that implement and mandate green buildings due to these successes. However, the policies are having troubles increasing the popularity and quantities of green buildings. There is a need for a way to produce better policies and regulations that will increase both the amount of green buildings their popularity. A decision-making tool, such as a decision tree, should be created to help policymakers who do not have the backgrounds to produce well thought out regulations. By researching the green building industry and its current status, key points can be graphed out in a decision tool that will provide the needed education for policy makers to produce better green building regulations.