3 resultados para riparian

em Digital Commons @ DU | University of Denver Research


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following document identifies the impact to the current management plan of the Rio Salado Riparian Habitat Restoration Area in the event the endangered Southwestern Willow Flycatcher is found nesting at the project site. Rio Salado is managed by the City of Phoenix Parks and Recreation Department, and consists of a low-flow channel with native vegetation and wildlife along the Salt River. This paper analyzes the regulatory responsibilities of project site management and discusses the necessary adjustments to the management plan. Despite the current absence of the Southwestern Willow Flycatcher from Rio Salado, management should enter into a Safe Harbor Agreement with the U.S. Fish and Wildlife Service to legally protect themselves from the regulations stipulated in the Endangered Species Act.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Highways can be effective barriers to animal migration. Where highways cross over streams, a passageway, typically a culvert, not designed for fish access can cut off an organism from miles of habitat. Traditional methods of culvert design, to convey floodwaters, reduced access to aquatic and riparian range. The Colorado Department of Transportation likely has numerous culverts that restrict aquatic passage. This paper provides guidance to CDOT for assessment of stream geomorphic conditions affecting culvert performance for fish passage, understanding aquatic organism habitat requirements, and incorporating ecological parameters into culvert designs that benefit fish and other organisms. A case study illustrates culvert problems in a difficult geomorphic setting including a fish passage assessment to evaluate stream stability for long-term culvert reliability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Three sustainable projects were studied under a sustainable park model for humid climates to determine where their costs lie in terms of installation, maintenance or both. These projects included the use of solar lighting to replace every configuration of conventional lighting, inclusion of a water garden/bog filter and Riparian Buffer System for the purposes of filtering sediments and nutrients out of runoff to prevent contaminated runoff from reaching the river that was adjacent to the park model location and construction of a LEED-inspired building to serve as the concession stand/restrooms building. The aggregate cost savings of instituting all three projects over ten years was $74,120 and the entire project paid itself off in approximately four years.