3 resultados para Waqf--Economic aspects

em Digital Commons @ DU | University of Denver Research


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Coastal erosion is an important and constant issue facing coastal areas all over the world today. The rate of coastal development over the years has increased, in turn requiring that action be taken to protect structures from the threat of erosion. A review of the causes of coastal erosion and the methods implemented to control it was conducted in order to determine the best course of action in response to coastal erosion issues. The potential positive and negative economic and environmental impacts are key concerns in determining whether or not to restore an eroding beach and which erosion control method(s) to implement. Results focus on providing a comparison of these concerns as well as recommendations for addressing coastal erosion issues.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Reactive power is critical to the operation of the power networks on both safety aspects and economic aspects. Unreasonable distribution of the reactive power would severely affect the power quality of the power networks and increases the transmission loss. Currently, the most economical and practical approach to minimizing the real power loss remains using reactive power dispatch method. Reactive power dispatch problem is nonlinear and has both equality constraints and inequality constraints. In this thesis, PSO algorithm and MATPOWER 5.1 toolbox are applied to solve the reactive power dispatch problem. PSO is a global optimization technique that is equipped with excellent searching capability. The biggest advantage of PSO is that the efficiency of PSO is less sensitive to the complexity of the objective function. MATPOWER 5.1 is an open source MATLAB toolbox focusing on solving the power flow problems. The benefit of MATPOWER is that its code can be easily used and modified. The proposed method in this thesis minimizes the real power loss in a practical power system and determines the optimal placement of a new installed DG. IEEE 14 bus system is used to evaluate the performance. Test results show the effectiveness of the proposed method.