2 resultados para Model Construction and Estimation
em Digital Commons @ DU | University of Denver Research
Resumo:
Three sustainable projects were studied under a sustainable park model for humid climates to determine where their costs lie in terms of installation, maintenance or both. These projects included the use of solar lighting to replace every configuration of conventional lighting, inclusion of a water garden/bog filter and Riparian Buffer System for the purposes of filtering sediments and nutrients out of runoff to prevent contaminated runoff from reaching the river that was adjacent to the park model location and construction of a LEED-inspired building to serve as the concession stand/restrooms building. The aggregate cost savings of instituting all three projects over ten years was $74,120 and the entire project paid itself off in approximately four years.
Resumo:
The Alaska Natural Gas Pipeline (ANGP) is proposed for construction on the North Slope in 2016. It will be aligned through Arctic caribou habitat and evidence shows that caribou are negatively affected by human development. This Capstone identifies potential adverse affects of ANGP on Arctic caribou using interviews from expert caribou biologists and the 1977 Trans-Alaska Pipeline System (TAPS) as a model. Based on a synthesis of the interviews and TAPS analysis, this capstone proposes and examines a set of seventeen conservation measures to be implemented during construction and operation of ANGP to minimize adverse impacts on caribou herds. These conservation measures can be used as a baseline for future developments on the North Slope to promote caribou herd management.