3 resultados para Mobilità sostenibile, LEED, certificazione

em Digital Commons @ DU | University of Denver Research


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite the economy, the green building industry continues to grow and drive the demand for environmentally conscious, highly skilled professionals (USGBC 2009). LEED Accredited Professionals (APs) have the knowledge and skills to meet such demand; however, information is limited regarding LEED APs or their motivations and expectations toward prospective employers. The author surveyed a sample of LEED Accredited architects and found a combination of job and personal factors motivated them to attain accreditation. LEED APs value both a competitive salary and commitment to sustainability in prospective employers. To attract, retain, and utilize LEED APs, executives in this industry must reexamine corporate culture, their willingness to pay for credentialing, and the alignment of their reputation with the desires of potential applicants.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Characteristics of six operating hot spring recreational facilities were reviewed to identify opportunities for integrating a range of sustainable design and operation approaches into a community park. Potential operating cost savings were evaluated for a conceptual landscape project, bathhouse project, and swimming pool project that reduced the use of electricity, natural gas, water, the discharge of water, and solid waste generation. The projects showed a combined cost savings of approximately $40,000 per year by adopting passive solar design, energy efficient lighting, native vegetation, water efficient fixtures, and a natural swimming pool. The greatest potential operating cost reductions were observed for cutbacks in the use of swimming pool water and reductions in natural gas needed for building and swimming pool heating.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Three sustainable projects were studied under a sustainable park model for humid climates to determine where their costs lie in terms of installation, maintenance or both. These projects included the use of solar lighting to replace every configuration of conventional lighting, inclusion of a water garden/bog filter and Riparian Buffer System for the purposes of filtering sediments and nutrients out of runoff to prevent contaminated runoff from reaching the river that was adjacent to the park model location and construction of a LEED-inspired building to serve as the concession stand/restrooms building. The aggregate cost savings of instituting all three projects over ten years was $74,120 and the entire project paid itself off in approximately four years.