4 resultados para IFRS compliance
em Digital Commons @ DU | University of Denver Research
Resumo:
Wetlands that are lost to development are not effectively compensated by the current wetland mitigation banking regulatory program due to inadequate monitoring and compliance. Based on a critical investigation of two wetland mitigation banks in Colorado described herein, recommendations are given to improve the effectiveness of the wetland mitigation banking program. The recommendations to improve mitigation banking are to specify and follow comprehensive monitoring and reporting plans, develop solid contingency and adaptive management plans, utilize specially developed checklists and templates, and impose enforcement when compliance is not met. Implementing these recommendations will assist regulators and bankers in achieving more effective wetland mitigation and will help the United States reach its no net loss of wetlands goal.
Resumo:
Gasoline Distribution Generally Available Control Technology (GD GACT) is a Federal environmental regulation that is specifically written and enforced to reduce HAP emissions from gasoline distribution (GD) facilities. The regulation targets four specific types of GD facilities: bulk gasoline terminals, bulk gasoline plants, pipeline breakout stations, and pipeline pumping stations. A GD GACT compliance plan was developed for a particular, representative example of each type of GD facility affected by the regulation. Each facility in the study is owned and operated by a single company. The compliance plans were developed to meet the regulatory requirements contained within GD GACT. The compliance plans will be implemented at each facility prior to the January 10, 2011 compliance date.
Resumo:
The Adams County Regional Park and Fairgrounds must comply with environmental policies related to surface water and groundwater protection. This paper assesses various methods which have proven to be effective in the reduction of nutrients and other contaminants found in surface and groundwater at comparable livestock-based venues. Data was gathered from other facilities in order to identify specific compliance alternatives and evaluate management options. Empirical research, coupled with GIS mapping technology yielded explicit water quality management recommendations for the Adams County Regional Park and Fairgrounds. The outcome of this research and mapping exercise include twelve management recommendations and two site-specific locations for structural BMPs designed to better control water pollution at the Adams County Regional Park and Fairgrounds.
Resumo:
Sodium phosphates are a class of chemicals that have been widely employed in commercial and consumer applications. However, declining use of these chemicals due to environmental concerns has lead to restructuring within the industry that has caused, and is likely to continue to cause, reduction of sodium phosphate production capacity. Closure of a sodium phosphate manufacturing plant necessitates decommissioning and decontamination activities that are subject to a variety of federal, state, and local regulations. A compliance plan was developed to provide a blueprint for ensuring that all federal regulatory requirements are met, however, site dependent state and local requirements were excluded. The compliance plan provides a framework that addresses project team formation and project planning, regulatory requirements, identification of affected processing equipment, plant pre-shutdown activities, waste stream identification and waste management facilities, safety, training, and emergency preparedness planning, and project decommissioning remedial actions. This regulatory compliance plan will enable sodium phosphate plant operators to complete decontamination and decommissioning work in a timely, efficient, compliant, and cost effective manner.