4 resultados para Distributed Pipeline

em Digital Commons @ DU | University of Denver Research


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to explore the leadership capacities and practices of assistant principals. The research also sought to determine what relationships existed between capacity and practice and to see if there was a difference based on experience, context and personal characteristics. Since the majority of principals first serve as assistant principals, their work and experiences as assistant principals will have significant consequences (Kwan, 2009). The literature has long held and continues to challenge the notion that the role of assistant principal is adequate preparation for the principalship (Chan, Webb, & Bowen, 2003; Harris, Muijs, & Crawford, 2003; Kwan, 2009; Mertz, 2000; Webb & Vulliamy, 1995). Based on empirical findings, this study has affirmed the need to further research and refine the role of the assistant principal. The results indicate that in addition to strengths, there are explicit gaps and missed opportunities in the leadership practices of assistant principals that impact the potential for building a leadership pipeline within schools. The work of the assistant principal is characterized by a proliferation of duties rather than a strategic set of practices that support distributed leadership and sustainability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reactive power is critical to the operation of the power networks on both safety aspects and economic aspects. Unreasonable distribution of the reactive power would severely affect the power quality of the power networks and increases the transmission loss. Currently, the most economical and practical approach to minimizing the real power loss remains using reactive power dispatch method. Reactive power dispatch problem is nonlinear and has both equality constraints and inequality constraints. In this thesis, PSO algorithm and MATPOWER 5.1 toolbox are applied to solve the reactive power dispatch problem. PSO is a global optimization technique that is equipped with excellent searching capability. The biggest advantage of PSO is that the efficiency of PSO is less sensitive to the complexity of the objective function. MATPOWER 5.1 is an open source MATLAB toolbox focusing on solving the power flow problems. The benefit of MATPOWER is that its code can be easily used and modified. The proposed method in this thesis minimizes the real power loss in a practical power system and determines the optimal placement of a new installed DG. IEEE 14 bus system is used to evaluate the performance. Test results show the effectiveness of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Alaska Natural Gas Pipeline (ANGP) is proposed for construction on the North Slope in 2016. It will be aligned through Arctic caribou habitat and evidence shows that caribou are negatively affected by human development. This Capstone identifies potential adverse affects of ANGP on Arctic caribou using interviews from expert caribou biologists and the 1977 Trans-Alaska Pipeline System (TAPS) as a model. Based on a synthesis of the interviews and TAPS analysis, this capstone proposes and examines a set of seventeen conservation measures to be implemented during construction and operation of ANGP to minimize adverse impacts on caribou herds. These conservation measures can be used as a baseline for future developments on the North Slope to promote caribou herd management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The petroleum pipeline industry in the United States is challenged with maintaining the integrity of their pipelines, while also protecting the environment during any pipeline repairs. This project provides information on the activities relating to the industry Integrity Management Program, assesses the process that federal agencies are developing to create streamlined permitting processes, and if the necessary federal, state, and local wetland permits can be obtained in the time frame required by the law. Recommendations are also made for implementation of a fast-track wetland permitting process and what pipeline companies can do to speed up the permitting process. This project focuses on the refined petroleum pipelines that originate near the Gulf of Mexico and terminate in the Northeastern United States.