4 resultados para Wave Impact

em CORA - Cork Open Research Archive - University College Cork - Ireland


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The performance of an RF output matching network is dependent on integrity of the ground connection. If this connection is compromised in anyway, additional parasitic elements may occur that can degrade performance and yield unreliable results. Traditionally, designers measure Constant Wave (CW) power to determine that the RF chain is performing optimally, the device is properly matched and by implication grounded. It is shown that there are situations where modulation quality can be compromised due to poor grounding that is not apparent using CW power measurements alone. The consequence of this is reduced throughput, range and reliability. Measurements are presented on a Tyndall Mote using a CC2420 RFIC todemonstrate how poor solder contact between the ground contacts and the ground layer of the PCB can lead tothe degradation of modulated performance. Detailed evaluation that required the development of a new measurement definition for 802.15.4 and analysis is presented to show how waveform quality is affected while the modulated output power remains within acceptable limits.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The work presented in this thesis covers four major topics of research related to the grid integration of wave energy. More specifically, the grid impact of a wave farm on the power quality of its local network is investigated. Two estimation methods were developed regarding the flicker level Pst generated by a wave farm in relation to its rated power as well as in relation to the impedance angle ψk of the node in the grid to which it is connected. The electrical design of a typical wave farm design is also studied in terms of minimum rating for three types of costly pieces of equipment, namely the VAr compensator, the submarine cables and the overhead line. The power losses dissipated within the farm's electrical network are also evaluated. The feasibility of transforming a test site into a commercial site of greater rated power is investigated from the perspective of power quality and of cables and overhead line thermal loading. Finally, the generic modelling of ocean devices, referring here to both wave and tidal current devices, is investigated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines 'availability' and the input metrics of operational expenditure (OPEX) for wave energy projects and reports on a case study which assesses the impact of these inputs on project profit returns. Case study simulations modelled a 75 MW wave energy project at two locations; the west coast of Ireland and the north coast of Portugal. Access and availability with respect to weather windows at both locations are discussed and their impact on energy output and wave farm operations is quantified. The input metrics used to calculate OPEX of wave energy projects are defined as well as the impact of OPEX on project net present value (NPV) and internal rate of return (IRR). Results indicate that access and resultant availability factors have a significant impact on case study results by reducing energy output and correspondingly financial returns. Furthermore, the technology maturity level designated for a project also impacts on availability factors and consequently energy output and NPV. Case study profits proved to be very sensitive to annual OPEX, especially if overhaul and replacement costs were accounted for. As a result of the impact of 'availability' on project profit returns. Feed-in tariffs will need to be tailored to the location in question as well as the device technology maturity level, with case study simulations indicating that high FIT will be required to support early stage WEC projects. (C) 2012 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the development of wave energy converters, the mooring system is a key component for a safe station-keeping and an important factor in the cost of the wave energy production. Generally, when designing a mooring system for a wave energy converter, two important conditions must be considered: (i) that the mooring system must be strong enough to limit the drifting motions, even in extreme waves, tidal and wind conditions and (ii) it must be compliant enough so that the impact on wave energy production can be minimised. It is frequently found that these two conditions are contradictory. The existing solutions mainly include the use of heavy chains, which create a catenary shaped mooring configuration, allowing limited flexibility within the mooring system, and hence very large forces may still be present on mooring lines and thus on anchors. This solution is normally quite expensive if the costs of the materials and installation are included. This paper presents a new solution to the mooring system for wave energy converters within the FP7 project, ‘GeoWAVE’, which is a project aiming to develop a new generation of the moorings system for minimising the loads on mooring lines and anchors, the impact on the device motions for power conversion, and the footprint if it is applicable, and meanwhile the new types of anchors are also addressed within the project. However this paper will focus on the new mooring system by presenting the wave tank test results of the Pelamis wave energy converter model and the new developed mooring system. It can be seen that the new generation of mooring system can significantly reduce the loads on mooring lines and anchors, and reduce the device excursions as a result of the new mooring system when compare to the conventional catenary mooring.