3 resultados para Energy performance
em CORA - Cork Open Research Archive - University College Cork - Ireland
Resumo:
Through this paper we will look at links between architecture education, research and practice, using a current project as a vehicle to cover aspects of building, pilot and live project. The first aspect, the building project consists of the refurbishment and extension of a Parnell Cottage for a private client and is located near Cloyne, in East Cork, Ireland. The pilot project falls within the NEES Project, investigating the use of materials and services based on natural or recycled materials to improve the energy performance of new and existing buildings. The live project aims to hold a series of on site workshops and seminars for students of Architecture, Architects and interested parties, demonstrating the integration of the NEES best practice materials and techniques within the built project. The workshops, seminars and key project documents will be digitally recorded for dissemination through a web based publication. The small scale of the building project allowed for flexibility in the early conceptual design stages and the integration of the research and educational aspects.
Resumo:
In the development of wave energy converters, the mooring system is a key component for a safe station-keeping and an important factor in the cost of the wave energy production. Generally, when designing a mooring system for a wave energy converter, two important conditions must be considered: (i) that the mooring system must be strong enough to limit the drifting motions, even in extreme waves, tidal and wind conditions and (ii) it must be compliant enough so that the impact on wave energy production can be minimised. It is frequently found that these two conditions are contradictory. The existing solutions mainly include the use of heavy chains, which create a catenary shaped mooring configuration, allowing limited flexibility within the mooring system, and hence very large forces may still be present on mooring lines and thus on anchors. This solution is normally quite expensive if the costs of the materials and installation are included. This paper presents a new solution to the mooring system for wave energy converters within the FP7 project, ‘GeoWAVE’, which is a project aiming to develop a new generation of the moorings system for minimising the loads on mooring lines and anchors, the impact on the device motions for power conversion, and the footprint if it is applicable, and meanwhile the new types of anchors are also addressed within the project. However this paper will focus on the new mooring system by presenting the wave tank test results of the Pelamis wave energy converter model and the new developed mooring system. It can be seen that the new generation of mooring system can significantly reduce the loads on mooring lines and anchors, and reduce the device excursions as a result of the new mooring system when compare to the conventional catenary mooring.
Resumo:
The Galway Bay wave energy test site promises to be a vital resource for wave energy researchers and developers. As part of the development of this site, a floating power system is being developed to provide power and data acquisition capabilities, including its function as a local grid connection, allowing for the connection of up to three wave energy converter devices. This work shows results from scaled physical model testing and numerical modelling of the floating power system and an oscillating water column connected with an umbilical. Results from this study will be used to influence further scaled testing as well as the full scale design and build of the floating power system in Galway Bay.