2 resultados para watershed management -- Mekong River Watershed

em Repository Napier


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The present research, undertaken in a mangrove swamp in northeastern Brazil (Mamanguape River Estuary), examined the factors that led to the overwhelming acceptance of the tangle-netting technique by crab harvesters in detriment to the now illegal tamping technique. Both techniques are the only ones currently used at our study site and in many other areas in Brazil, despite being prohibited by law. Data were collected through direct observations to determine capture efficiency, productivity, daily production, selectivity, and harvesting effort, and through interviews with crab harvesters, focusing on their perceptions of the capture techniques, the conditions of crab stocks and the sales price of a dozen crabs. Our results indicated that the two capture techniques did not significantly differ in terms of their efficiency or productivity, but daily production rates differed significantly, being greater using tangle-netting. The tangle-netting permits a greater harvesting effort (6 hours and 34 min) compared to tamping (4 hours and 19 min). Tangle-netting is also less selective than tamping indicated by the larger number of captured smaller specimens, including females. This results in a lower average sales price for a dozen crabs caught by tangle-netting (US$ 0.95) compared to tamping (US$ 1.02). The greater daily production of crab harvesters using the tangle-netting technique nevertheless increased their net gain, explaining their preference for this method, Given that tangle-netting results in greater harvesting pressure but lower selectivity compared to tamping, it may potentially be less sustainable. All of the crab harvesters interviewed having more than 20 years of experience (n = 34) stated they perceived that stocks of U. cordatus had become reduced over the last 20 years, together with average crab sizes. It is now important to examine the structure of the local U. cordatus population and to assess its fishery to allow evaluating whether the illegal, but prominent tangle-netting and tamping mangrove crab capture techniques are sustainable or not. We further suggest improving the dialogue between decision makers and fishermen, which barely exists to date, to initiate a discussion about possible ways of resolving the current situation of illegality of the fishermen. This will be key to achieving effective sustainable co-management of this important natural mangrove forest resource.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Hulun Lake, China’s fifth-largest inland lake, experienced severe declines in water level in the period of 2000-2010. This has prompted concerns whether the lake is drying up gradually. A multi-million US dollar engineering project to construct a water channel to transfer part of the river flow from a nearby river to maintain the water level was completed in August 2010. This study aimed to advance the understanding of the key processes controlling the lake water level variation over the last five decades, as well as investigate the impact of the river transfer engineering project on the water level. A water balance model was developed to investigate the lake water level variations over the last five decades, using hydrological and climatic data as well as satellite-based measurements and results from land surface modelling. The investigation reveals that the severe reduction of river discharge (- 364±64 mm/yr, ~70% of the five-decade average) into the lake was the key factor behind the decline of the lake water level between 2000 and 2010. The decline of river discharge was due to the reduction of total runoff from the lake watershed. This was a result of the reduction of soil moisture due to the decrease of precipitation (-49±45 mm/yr) over this period. The water budget calculation suggests that the groundwater component from the surrounding lake area as well as surface run off from the un-gauged area surrounding the lake contributed ~ net 210 Mm3/yr (equivalent to ~ 100 mm/yr) water inflows into the lake. The results also show that the water diversion project did prevent a further water level decline of over 0.5 m by the end of 2012. Overall, the monthly water balance model gave an excellent prediction of the lake water level fluctuation over the last five decades and can be a useful tool to manage lake water resources in the future.