2 resultados para international joint ventures

em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: To optimize patient functioning, rehabilitation professionals often rely on measurements of functioning as well as on classifications. Although the International Classification of Diseases (ICD) and the International Classification of Functioning, Disability and Health (ICF) are used, their joint use has yet to become an established practice. To encourage their joint use in daily practice, the World Health Organization (WHO) has invited all rehabilitation practitioners worldwide to support the ICD-11 revision process by identifying the ICF categories that correspond to specific rehabilitation-relevant health conditions. The first step in completing this task, generating the list of these health conditions, was taken at a February 2012 workshop in Sao Paulo, Brazil. Objectives: The objectives of this paper are to present the results of the Sao Paulo workshop, and to invite practitioners to participate in the ICD-ICF joint use initiative. Discussion: Alternating plenary and small working group sessions were held and 103 rehabilitation-relevant health conditions were identified. With this list available, WHO together with the International Society of Physical and Rehabilitation Medicine (ISPRM), is reaching out to clinicians of all rehabilitation disciplines to take on the challenge of identifying the ICF categories for at least one of the health conditions listed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The integrated production scheduling and lot-sizing problem in a flow shop environment consists of establishing production lot sizes and allocating machines to process them within a planning horizon in a production line with machines arranged in series. The problem considers that demands must be met without backlogging, the capacity of the machines must be respected, and machine setups are sequence-dependent and preserved between periods of the planning horizon. The objective is to determine a production schedule to minimise the setup, production and inventory costs. A mathematical model from the literature is presented, as well as procedures for obtaining feasible solutions. However, some of the procedures have difficulty in obtaining feasible solutions for large-sized problem instances. In addition, we address the problem using different versions of the Asynchronous Team (A-Team) approach. The procedures were compared with literature heuristics based on Mixed Integer Programming. The proposed A-Team procedures outperformed the literature heuristics, especially for large instances. The developed methodologies and the results obtained are presented.