12 resultados para Distribution system operation
em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo
Resumo:
This paper proposes an evolutionary computing strategy to solve the problem of fault indicator (FI) placement in primary distribution feeders. More specifically, a genetic algorithm (GA) is employed to search for an efficient configuration of FIs, located at the best positions on the main feeder of a real-life distribution system. Thus, the problem is modeled as one of optimization, aimed at improving the distribution reliability indices, while, at the same time, finding the least expensive solution. Based on actual data, the results confirm the efficiency of the GA approach to the FI placement problem.
Resumo:
This paper presents the development of a mathematical model to optimize the management and operation of the Brazilian hydrothermal system. The system consists of a large set of individual hydropower plants and a set of aggregated thermal plants. The energy generated in the system is interconnected by a transmission network so it can be transmitted to centers of consumption throughout the country. The optimization model offered is capable of handling different types of constraints, such as interbasin water transfers, water supply for various purposes, and environmental requirements. Its overall objective is to produce energy to meet the country's demand at a minimum cost. Called HIDROTERM, the model integrates a database with basic hydrological and technical information to run the optimization model, and provides an interface to manage the input and output data. The optimization model uses the General Algebraic Modeling System (GAMS) package and can invoke different linear as well as nonlinear programming solvers. The optimization model was applied to the Brazilian hydrothermal system, one of the largest in the world. The system is divided into four subsystems with 127 active hydropower plants. Preliminary results under different scenarios of inflow, demand, and installed capacity demonstrate the efficiency and utility of the model. From this and other case studies in Brazil, the results indicate that the methodology developed is suitable to different applications, such as planning operation, capacity expansion, and operational rule studies, and trade-off analysis among multiple water users. DOI: 10.1061/(ASCE)WR.1943-5452.0000149. (C) 2012 American Society of Civil Engineers.
Resumo:
Trigeneration systems have been used with advantage in the last years in distributed electricity generation systems as a function of a growth of natural gas pipeline network distribution system, tax incentives, and energy regulation policies. Typically, a trigeneration system is used to produce electrical power simultaneously with supplying heating and cooling load by recovering the combustion products thermal power content that otherwise would be driven to atmosphere. Concerning that, two small scale trigeneration plants have been tested for overall efficiency evaluation and operational comparison. The first system is based on a 30 kW (ISO) natural gas powered microturbine, and the second one uses a 26 kW natural gas powered internal combustion engine coupled to an electrical generator as a prime mover. The stack gases from both machines were directed to a 17.6 kW ammonia-water absorption refrigeration chiller for producing chilled water first and next to a water heat recovery boiler in order to produce hot water. Experimental results are presented along with relevant system operational parameters for appropriate operation including natural gas consumption, net electrical and thermal power production, i.e., hot and cold water production rates, primary energy saving index, and the energy utilization factor over total and partial electrical load operational conditions. (c) 2011 Elsevier Ltd. All rights reserved.
Resumo:
Network reconfiguration for service restoration (SR) in distribution systems is a complex optimization problem. For large-scale distribution systems, it is computationally hard to find adequate SR plans in real time since the problem is combinatorial and non-linear, involving several constraints and objectives. Two Multi-Objective Evolutionary Algorithms that use Node-Depth Encoding (NDE) have proved able to efficiently generate adequate SR plans for large distribution systems: (i) one of them is the hybridization of the Non-Dominated Sorting Genetic Algorithm-II (NSGA-II) with NDE, named NSGA-N; (ii) the other is a Multi-Objective Evolutionary Algorithm based on subpopulation tables that uses NDE, named MEAN. Further challenges are faced now, i.e. the design of SR plans for larger systems as good as those for relatively smaller ones and for multiple faults as good as those for one fault (single fault). In order to tackle both challenges, this paper proposes a method that results from the combination of NSGA-N, MEAN and a new heuristic. Such a heuristic focuses on the application of NDE operators to alarming network zones according to technical constraints. The method generates similar quality SR plans in distribution systems of significantly different sizes (from 3860 to 30,880 buses). Moreover, the number of switching operations required to implement the SR plans generated by the proposed method increases in a moderate way with the number of faults.
Resumo:
The design of a network is a solution to several engineering and science problems. Several network design problems are known to be NP-hard, and population-based metaheuristics like evolutionary algorithms (EAs) have been largely investigated for such problems. Such optimization methods simultaneously generate a large number of potential solutions to investigate the search space in breadth and, consequently, to avoid local optima. Obtaining a potential solution usually involves the construction and maintenance of several spanning trees, or more generally, spanning forests. To efficiently explore the search space, special data structures have been developed to provide operations that manipulate a set of spanning trees (population). For a tree with n nodes, the most efficient data structures available in the literature require time O(n) to generate a new spanning tree that modifies an existing one and to store the new solution. We propose a new data structure, called node-depth-degree representation (NDDR), and we demonstrate that using this encoding, generating a new spanning forest requires average time O(root n). Experiments with an EA based on NDDR applied to large-scale instances of the degree-constrained minimum spanning tree problem have shown that the implementation adds small constants and lower order terms to the theoretical bound.
Resumo:
Synchronous distributed generators are prone to operate islanded after contingencies, which is usually not allowed due to safety and power-quality issues. Thus, there are several anti-islanding techniques; however, most of them present technical limitations so that they are likely to fail in certain situations. Therefore, it is important to quantify and determine whether the scheme under study is adequate or not. In this context, this paper proposes an index to evaluate the effectiveness of anti-islanding frequency-based relays commonly used to protect synchronous distributed generators. The method is based on the calculation of a numerical index that indicates the time period that the system is unprotected against islanding considering the global period of analysis. Although this index can precisely be calculated based on several electromagnetic transient simulations, a practical method is also proposed to calculate it directly from simple analytical formulas or lookup tables. The results have shown that the proposed approach can assist distribution engineers to assess and set anti-islanding protection schemes.
Resumo:
Este trabalho propõe uma abordagem computacional evolutiva para a resolução do problema de alocação de dispositivos indicadores de faltas (IFs) em alimentadores primários de distribuição de energia elétrica. De forma mais específica, o problema de se obter o melhor local de instalação é solucionado por meio da técnica de Algoritmos Genéticos (AGs) que busca obter uma configuração eficiente de instalação de IFs no tronco principal de um alimentador de distribuição. Assim, faz-se a modelagem do mesmo na forma de um problema de otimização orientado à melhoria dos indicadores de qualidade do serviço e ao encontro de uma solução economicamente atraente. Os resultados com dados reais comprovam a eficiência da metodologia proposta.
Resumo:
This paper presents an analysis of the impact of the lightning overvoltages on the operational performance of the energized shield wire line technology (SWL) implemented in two locations of the State of Rondonia, Brazil. The analysis covers the periods of 1996 to 2000 (SWL Jaru) and 1997 to 2002 (SWL Itapua do Oeste), and shows that lightning is responsible for most of the system outages. The paper describes the satisfactory results achieved with the system, showing that the isolation and energization of the shield wires does not deteriorate the lightning performance of the 230 kV transmission lines. Comparisons between the performances of the SWL technology, conventional 34.5 kV lines, and thermal power plants in operation in the same region are also presented. The results demonstrate the technical and economical viability of the SWL technology and show that its application can lead to a postponement of investments.
Resumo:
The design and implementation of a new control scheme for reactive power compensation, voltage regulation and transient stability enhancement for wind turbines equipped with fixed-speed induction generators (IGs) in large interconnected power systems is presented in this study. The low-voltage-ride-through (LVRT) capability is provided by extending the range of the operation of the controlled system to include typical post-fault conditions. A systematic procedure is proposed to design decentralised multi-variable controllers for large interconnected power systems using the linear quadratic (LQ) output-feedback control design method and the controller design procedure is formulated as an optimisation problem involving rank-constrained linear matrix inequality (LMI). In this study, it is shown that a static synchronous compensator (STATCOM) with energy storage system (ESS), controlled via robust control technique, is an effective device for improving the LVRT capability of fixed-speed wind turbines.
Resumo:
This research reports liquid liquid equilibrium data for the system lard (swine fat), cis-9-octadecenoic acid (oleic acid), ethanol, and water at 318.2 K, as well as their correlation with the nonrandom two-liquid (NRTL) and universal quasichemical activity coefficient (UNIQUAC) thermodynamic equations, which have provided global deviations of 0.41 % and 0.53 %, respectively. Additional equilibrium experiments were also performed to obtain cholesterol partition (or distribution) coefficients to verify the availability of the use of ethanol plus water to reduce the cholesterol content in lard. The partition experiments were performed with concentrations of free fatty acids (commercial oleic acid) that varied from (0 to 20) mass % and of water in the solvent that varied from (0 to 18) mass %. The percentage of free fatty acids initially present in lard had a slight effect on the distribution of cholesterol between the phases. Furthermore, the distribution coefficients decreased by adding water in the ethanol; specifically, it resulted in a diminution of the capability of the solvent to remove the cholesterol.
Resumo:
DISTRIBUTION OF NITROGEN AMMONIUM SULFATE (N-15) SOIL-PLANT SYSTEM IN A NO-TILLAGE CROP SUCCESSION The N use by maize (Zea mays, L.) is affected by N-fertilizer levels. This study was conducted using a sandy-clay texture soil (Hapludox) to evaluate the efficiency of N use by maize in a crop succession, based on N-15-labeled ammonium sulfate (5.5 atom %) at different rates, and to assess the residual fertilizer effect in two no-tillage succession crops (signalgrass and corn). Two maize crops were evaluated, the first in the growing season 2006, the second in 2007, and brachiaria in the second growing season. The treatments consisted of N rates of 60, 120 and 180 kg ha(-1) in the form of labeled N-15 ammonium sulfate. This fertilizer was applied in previously defined subplots, only to the first maize crop (growing season 2006). The variables total accumulated N; fertilizer-derived N in corn plants and pasture; fertilizer-derived N in the soil; and recovery of fertilizer-N by plants and soil were evaluated. The highest uptake of fertilizer N by corn was observed after application of 120 kg ha(-1) N and the residual effect of N fertilizer on subsequent corn and Brachiaria was highest after application of 180 kg ha(-1) N. After the crop succession, soil N recovery was 32, 23 and 27 % for the respective applications of 60, 120 and 180 kg ha(-1) N.
Resumo:
Abstract Background The authors have developed a small portable device for the objective measurement of the transparency of corneas stored in preservative medium, for use by eye banks in evaluation prior to transplantation. Methods The optical system consists of a white light, lenses, and pinholes that collimate the white light beams and illuminate the cornea in its preservative medium, and an optical filter (400–700 nm) that selects the range of the wavelength of interest. A sensor detects the light that passes through the cornea, and the average corneal transparency is displayed. In order to obtain only the tissue transparency, an electronic circuit was built to detect a baseline input of the preservative medium prior to the measurement of corneal transparency. The operation of the system involves three steps: adjusting the "0 %" transmittance of the instrument, determining the "100 %" transmittance of the system, and finally measuring the transparency of the preserved cornea inside the storage medium. Results Fifty selected corneas were evaluated. Each cornea was submitted to three evaluation methods: subjective classification of transparency through a slit lamp, quantification of the transmittance of light using a corneal spectrophotometer previously developed, and measurement of transparency with the portable device. Conclusion By comparing the three methods and using the expertise of eye bank trained personnel, a table for quantifying corneal transparency with the new device has been developed. The correlation factor between the corneal spectrophotometer and the new device is 0,99813, leading to a system that is able to standardize transparency measurements of preserved corneas, which is currently done subjectively.