17 resultados para Electricity Network Distribution Wastes


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Brazilian network for genotyping is composed of 21 laboratories that perform and analyze genotyping tests for all HIV-infected patients within the public system, performing approximately 25,000 tests per year. We assessed the interlaboratory and intralaboratory reproducibility of genotyping systems by creating and implementing a local external quality control evaluation. Plasma samples from HIV-1-infected individuals (with low and intermediate viral loads) or RNA viral constructs with specific mutations were used. This evaluation included analyses of sensitivity and specificity of the tests based on qualitative and quantitative criteria, which scored laboratory performance on a 100-point system. Five evaluations were performed from 2003 to 2008, with 64% of laboratories scoring over 80 points in 2003, 81% doing so in 2005, 56% in 2006, 91% in 2007, and 90% in 2008 (Kruskal-Wallis, p = 0.003). Increased performance was aided by retraining laboratories that had specific deficiencies. The results emphasize the importance of investing in laboratory training and interpretation of DNA sequencing results, especially in developing countries where public (or scarce) resources are used to manage the AIDS epidemic.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Network reconfiguration for service restoration (SR) in distribution systems is a complex optimization problem. For large-scale distribution systems, it is computationally hard to find adequate SR plans in real time since the problem is combinatorial and non-linear, involving several constraints and objectives. Two Multi-Objective Evolutionary Algorithms that use Node-Depth Encoding (NDE) have proved able to efficiently generate adequate SR plans for large distribution systems: (i) one of them is the hybridization of the Non-Dominated Sorting Genetic Algorithm-II (NSGA-II) with NDE, named NSGA-N; (ii) the other is a Multi-Objective Evolutionary Algorithm based on subpopulation tables that uses NDE, named MEAN. Further challenges are faced now, i.e. the design of SR plans for larger systems as good as those for relatively smaller ones and for multiple faults as good as those for one fault (single fault). In order to tackle both challenges, this paper proposes a method that results from the combination of NSGA-N, MEAN and a new heuristic. Such a heuristic focuses on the application of NDE operators to alarming network zones according to technical constraints. The method generates similar quality SR plans in distribution systems of significantly different sizes (from 3860 to 30,880 buses). Moreover, the number of switching operations required to implement the SR plans generated by the proposed method increases in a moderate way with the number of faults.