3 resultados para Strichartz Estimates

em Harvard University


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This six-page undated list contains volume titles and estimates for the cost of binding them. The list is undated, but one of the first entries contains the note, "from the year 1774 to the present time [1801]."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The estimate includes projected costs for the materials and labor required for each renovation. The anatomical room needed its circular seats raised and altered. The renovation of the lower room included making new window frames and sashes (including replacing glass), installing new doors, and repairing the floors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Includes estimates for building stairs on the outside of Wigglesworth House, making shutters, constructing a porch over the well, and making general repairs on the inside of the house.