200 resultados para Pausanias, fl. ca. 150-175.
Resumo:
Pen and ink drawing by Charles Bulfinch of the proposed cupola of University Hall. Pencil drawing of interior of cupola on verso.
Resumo:
Sketchbook contains four drawings of elevations and floor plans of University Hall. Includes floor plans for the ground floor and second story. Also contains exterior sketches of side view and end view and principal entrance. Each drawing is accompanied by notes indicating the scales measurements and designated rooms in Floor plan sketches.
Resumo:
Bemis, responding to an advertisement from Lowell and Baldwin requesting bids for building materials, outlines his proposal for using Chelmsford granite for the construction of University Hall. Bemis lists 12 stipulations in his proposal including costs per bricks, techniques for constructing the upper storeys, and labor costs.
Resumo:
This estimate submitted by Metcalf and Hunter includes their projected costs for completing the outside of University Hall with face stone. Also includes itemized estimates for rough stone work on the cellar and brick laying.
Resumo:
Moore and Walton's projected cost for finishing University Hall is $5,386.61. This includes finishing the roof, laying the floors, and installing the gutters and windows.
Resumo:
Detailed drawing of stairways to be built in University Hall. Includes dimensions for height, length, and width of stairs.
Resumo:
This drawing includes the intricate stonework designed by Charles Bulfinch for University Hall. Each stone is numbered or lettered to indicate the exact stones needed for the project.
Resumo:
This drawing includes the dimensions for the north and south stairs as well as for the spaces surrounding the staircases. Dimensions are also given for the windows and doors.
Resumo:
Estimate for $10,189.62 to complete stone work in University Hall. This includes the front basement, end basement, window stools, door ports, and stairs.
Resumo:
Estimate for $5942.68 for the completion of the interior fixtures of University Hall including folding doors, pew arrangement in the chapel, and architraves to doors, windows, and fireplaces.
Resumo:
Detailed list of twelve interior projects that need to be completed in University Hall. The list includes hinging doors, completing architraves, and installing windows. Appears to be simplified version of Memoranda of contract with carpenters, Moore, and others, in Box 1, Folder 42.
Resumo:
Known as the Bulfinch view, this proposed site plan of the College grounds by Charles Bulfinch depicts University Hall at the center of the drawing surrounded by Massachusetts, Harvard, Hollis, Stoughton, and Holworthy Halls. Several unlabeled buildings are displayed in the plan.
Resumo:
Title transcribed by cataloger.
Resumo:
Title supplied by cataloger.