1 resultado para Terminazione forzata, Flight Termination System, FTS, APR
em Repositório Institucional da Universidade Estadual de São Paulo - UNESP
Resumo:
The modernization of the world made the speed, accuracy and reliability of all existing processes become increasingly necessary. For this evolution to occur every day, the evolution of the equipment was strategic, but not as much as needed. It is necessary for such equipment to ensure its function and, in case of failure, an early diagnosis to prevent loss. Therefore the evolution of maintainability and reliability in equipment is also paramount. Thus, the growth of forms of maintenance was driven by this scenario, forming maintenance philosophies. Among many, there is the RCM, which have its focus on the identification, parameters development and performance preview. One of those methodologies from this idea is the FMEA, process that has been studied and implemented this work, aiming the anticipation of failure modes and guidance for the use of a heat exchanger and a pump. This implementation has the aid of another process of RCM, the PHA, which was also shown and implemented, these results being used to start the FMEA process. The results show the activities with the highest chance of failure, presenting also the measures to be taken to avoid or minimize them. It is shown, in this paper, concern with the valves because they maintain control and system security, and its flaws related to accidents with possible danger to people and the whole system, emphasizing the priority of action