4 resultados para Setor de software
em Repositório Institucional da Universidade Estadual de São Paulo - UNESP
Resumo:
The automobile industry shows relevance inside the Brazilian industrial scenario since it contributes with the development of a significant chain of supply, distributors, workshops, publicity agencies and insurance companies in the internal market, aside from being one of the five biggest worldwide market. Thereby, the federal government decreed in Dec, 17th 2012 by Law nº 12.715 the Inovar-Auto Program. As the Adjusted Present Value (APV) is highly recommended, although not yet widespread to public politics of tax reduction, this work intends to apply the APV method on the cash flow analysis of an automobile sector's company, which has recently installed in national territory and wants to rely with governmental incentives proposed by Inovar-Auto Program. The developed work evaluates the company's current cash flow stochastically from mathematical modeling of variables such as price, demand and interest rate through probability distributions with the assist of Crystal Ball software, a Microsoft Excel Add-in, generating different scenarios from Monte Carlo Simulation. As results probabilities situations have been evaluated until the end of the Inovar-Auto's conducted period, in 2017. Beside APV others indicator such as Internal Rate of Return (IRR) and payback period were estimated for the investment project. For APV a sampling distribution with only 0.057% of risk, IRR of 29% were obtained and estimated project payback period was 4.13 years
Resumo:
The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Psicologia - FCLAS