4 resultados para Payback

em Repositório Institucional da Universidade Estadual de São Paulo - UNESP


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work studies and develops a machine automation for tyre truing. It is discussed industry development, industrial processes automation, tyre-recycling process, advantages of tyre reuse for preservation of the environment and probable gains from the automation of part of the tyre-recycling process. In this text, it is detailed the work done to configure, program and optimize the truing process through automation components as CNC, PLC and drives. Tests and simulations are performed to determine the payback necessary period in productivity and profit gains

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The automobile industry shows relevance inside the Brazilian industrial scenario since it contributes with the development of a significant chain of supply, distributors, workshops, publicity agencies and insurance companies in the internal market, aside from being one of the five biggest worldwide market. Thereby, the federal government decreed in Dec, 17th 2012 by Law nº 12.715 the Inovar-Auto Program. As the Adjusted Present Value (APV) is highly recommended, although not yet widespread to public politics of tax reduction, this work intends to apply the APV method on the cash flow analysis of an automobile sector's company, which has recently installed in national territory and wants to rely with governmental incentives proposed by Inovar-Auto Program. The developed work evaluates the company's current cash flow stochastically from mathematical modeling of variables such as price, demand and interest rate through probability distributions with the assist of Crystal Ball software, a Microsoft Excel Add-in, generating different scenarios from Monte Carlo Simulation. As results probabilities situations have been evaluated until the end of the Inovar-Auto's conducted period, in 2017. Beside APV others indicator such as Internal Rate of Return (IRR) and payback period were estimated for the investment project. For APV a sampling distribution with only 0.057% of risk, IRR of 29% were obtained and estimated project payback period was 4.13 years

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)