2 resultados para Parking lots.
em Repositório Institucional da Universidade Estadual de São Paulo - UNESP
Resumo:
Having in mind that petroleum's history presents a huge growth, the exploration and production areas have been receiving lots of investments, in order to attend the increasing demand for gas and petroleum. Looking through that scenario, new technologies have been evolving in favor of discovering new natural petroleum deposits and act with effectiveness in truly deep waters without giving up the worldwide best operational security practices. The use of rigid pipes in marine installations have been rising quickly and, thanks to this reality, the many storage and pipe launching forms became study objects and are getting improved. The analysis of steel API X70 characteristics, proving that they are suitable for use in pipes developed to transport gas and petroleum is the theme of this presentation. A tensile test was conducted to determine the base metal's mechanical properties, draining's tension, traction's resistance, elasticity's modulus and maximum tension. An aspect that is concerning too is the metallographic analysis, in order to determine the studied iron's microstructure. Results of analyzes showed that the steel has high resistance, with good capacity for deformation and well defined yield point, concluding suitable for the application in question
Resumo:
The current competitive market requires companies to adapt so that they can meet the needs of customers in an agile manner and aimed at the lowest possible cost in their manufacture, be it a product or service. The Toyota Production System is aimed at higher profits through lean manufacturing practices with reduced spending, smaller lots and inventories, generated by market demand. The variety of products makes the setup of the equipment a critical point and it should be reduced as much as possible so it does not affect productivity. The rapid exchange of tools allows with few actions and a modification that time does not exceed one digit on your total time. In this study, a case study showed that only with standardization and use of cheap improvements made it possible to reduce setup time in bottle labeling machine by 98 minutes for a final time of approximately 10 minutes with little investment, demonstrating the feasibility the displayed and a monthly gain tool in bottles at approximately 120,000, generating a performance gain and budget of approximately R$ 94,000.00 per month