4 resultados para Desenho - Projetos
em Repositório Institucional da Universidade Estadual de São Paulo - UNESP
Resumo:
The aim of this paper is to gather research information and studies posted about the importance of social environment in the development of symbolic systems on children. Languages verbal, visual and written are interrelated representation systems, although each one has its own characteristics and elements. The objective of this paper is to elucidate the importance of linking the various existing types of language and therefore the importance of a coordinate approach also in the teaching-learning situations of these systems. The work also intends to disclose how thin is the line that separates writing of drawing, both of them as representative systems. As well as to show how visual information and language are intrinsically linked as thought happens by the connections between them. The work includes the report of an activity with Japanese ideograms done in the author's teacher's training at formal education. It also approaches pictographic, creative and poetic aspects of ideograms that brings up new ways of thinking and representing symbolically just like the methods of artistic language
Resumo:
Water is an economic, strategic and social valuable resource of the utmost importance to society. This renewable natural resource is increasingly scarce with the growing of populations, industries and agriculture, in addition to the pollution surface and underground water and the waste have aggravated this situation. Investments in the sector of water resources so that this resource meets in quantity and quality the demand from its multiple uses, represent a significant portion of national and regional budgets. Therefore, the use of alternative sources of water capture can reduce the pressure on conventional public water supply systems. In this work was designed and executed a rain water collection system to a residence in the city of Barueri (SP), which can be applied to other residences. In this system, the rooftop of the residence was used as the waterproof and capture area. The gutter and the PVC conductors were used for driving the water to two connected reservoirs. The stored water was designed to address activities that are not potable, such as washing clothes and external areas and garden irrigation. The system showed economic viability, with 34-month return of investment time, wherein after that period, in addition to environmental and social benefits derived from the implementation of the project, the economy made with the payment of public supply rates should be considered. This rainwater capture system is inexpensive and uses materials available in the market. Therefore, its application to a greater number of households should be encouraged as a measure of sustainable water management
Resumo:
This paper presents a study based on bibliographic research on LTE technology, chosen for the fourth generation of mobile phones, and the current status of implementation of 4G network in Brazil. The change in user behavior, which now uses data over the voice services, requires transmission networks to be increasingly robust and fast to enable the viewing of videos and use of other platforms that require internet connection. The retrospective of the development of mobile technologies, from 1G up to 4G that is currently used, shows the long road until it came to appliances and how the phone is used nowadays. Finally, the popularity of smartphones and hence the growing number of people with access to 4G networks, demanded new researchs for the development of future generations technologies in order to achieve the demand for speed enabling significant changes in user experience
Resumo:
The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness