3 resultados para BIM

em Repositório Institucional da Universidade Estadual de São Paulo - UNESP


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coordination compounds of trivalent lanthanides cations with diphenylphosphinate are originated from direct reaction between a lanthanide salt and diphenylphosphinic acid. These complexes have peculiar and intriguing features, as (i) quickly obtainment through wet process precipitation, (ii) appreciable thermal stability, similar to inorganic phosphates, (iii) polymeric structure, and consequently, (iv) low solubility in both polar and non-polar solvents. Nowadays, coordination polymers are classified as coordination networks or, in case of porous materials, as metal-organic frameworks (MOFs). By this study, we aim to determine some optical properties of rare-earth diphenylphosphinate (RE = La3+, Eu3+, Gd3+, Lu3+) and conduct an updated classification of these compounds, bringing more details of its structure and the possible proposal of new materials with applications in lighting, detection of ionizing radiation and magnetism. The complexes of trivalent rare-earth cation with diphenylphosphinate were prepared by direct mixture of diphenylphosphinic acid with rare-earth metal chloride, both in ethanolic solution. The solution of diphenylphosphinic acid was kept in a beaker under constant stirring with pH measurements of the solution and gadolinium chloride solution was then dripped slowly with the aid of a burette until its complete addition; the following metal:ligand molar ratios were tested: 1:1, 1:2, 1:3, 2:1 e 3:1. The compounds were characterized by spectroscopic and structural techniques. By Fourier Transform Infrared Spectroscopy (FT-IR), it was possible to check the total ionization of diphenylphosphinic acid in synthesized complexes, confirmed by the absence of the band type A, B, C related to ѵ(O-H) of the acid (2663 cm-1, 2168 cm-1, 1684 cm-1), as well as the disappearance of ѵ(P-OH)=961 cm-1. Furthermore, the occurrence of bands shifts of ѵ(POO-) [symmetrical and asymmetrical] of...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness