3 resultados para Conselho de Recursos do Sistema Financeiro Nacional (Brasil)
em Repositório Institucional da Universidade Tecnológica Federal do Paraná (RIUT)
Resumo:
Brazil is internationally acknowledged for its renewable sources, most notably, hydroelectric power plant projects which correspond to 65% of electricity production supply to the National Interconnected System. The main question behind this research is: what are the weights and the relative importance of the variables which have influence on the decision making process for the expansion of hydroelectric generation projects in Parana? The main objective is to propose a multi-criteria decision procedure, in association with water sources options that take into consideration the weight and relative importance of the alternatives having influence on the decision by enterprises in the generation of electricity in the state of Paraná. As far as the approach to the problem is concerned, this research can be classified as having mixed methodologies, applying Content Analysis, Delphi technique and the Analytic Hierarchy Process. Following Delphi methodology, a group of 21 was selected for data collection, all of those linked to Paranaense hydroelectricity market. And the main result was the construction of a decision tree in which it was possible to identify the importance and relative weight of the elements associated with the four dimensions of energy. In environmental dimension, the highest relative weight was placed on the loading capacity of Parana system; the economic dimension, the amortization of investment; in social dimension, the generation of direct work places and in institutional dimension, the availability of suitable sources of financing. Policy makers and business managers make their decisions based on specific criteria related to the organization segment, market information, economic and political behavior among other indicators that guide them in dealing with the typical tradeoffs of projects in hydropower area. The results obtained in the decision tree show that the economic bias is still the main factor in making investment decisions. However, environmental impacts on the State loading capacity, income generation, providing opportunities for direct as well as indirect jobs. And at an institutional level, the absence of funding sources show that the perception of experts is focused on other issues beyond the logic behind development per se. The order of priority of variables in this study indicates that in the current environment of uncertainty in the Brazilian economy as many variables must be analyzed and compared in order to optimize the scarce resources available to expand local development in relation to Paranaense water matrix.
Resumo:
The focus of this work is the automatic analysis of disturbance records for electrical power generating units. The main proposition is a method based on wavelet transform applied to short-term disturbance records (waveform records). The goal of the method is to detect the time instants of recorded disturbances and extract meaningful information that characterize the faults. The result is a set of representative information of the monitored signals in power generators. This information can be further classified by an expert system (or other classification method) in order to classify the faults and other abnormal operating conditions. The large amount of data produced by digital fault recorders during faults justify the research of methods to assist the analysts in their task of analysing the disturbances. The literature review pointed out the state of the art and possible applications for oscillography records. The review of the COMTRADE standard and wavelet transform underlines the choice of the method for solving the problem. The conducted tests lead to the determination of the best mother wavelet for the segmentation process. The application of the proposed method to five case studies with real oscillographic records confirmed the accuracy and efficiency of the proposed scheme. With this research, the post-operation analysis of occurrences is improved and as a direct result is the reduction of the time that generators are offline.
Resumo:
The municipal management in any country of the globe requires planning and allocation of resources evenly. In Brazil, the Law of Budgetary Guidelines (LDO) guides municipal managers toward that balance. This research develops a model that seeks to find the balance of the allocation of public resources in Brazilian municipalities, considering the LDO as a parameter. For this using statistical techniques and multicriteria analysis as a first step in order to define allocation strategies, based on the technical aspects arising from the municipal manager. In a second step, presented in linear programming based optimization where the objective function is derived from the preference of the results of the manager and his staff. The statistical representation is presented to support multicriteria development in the definition of replacement rates through time series. The multicriteria analysis was structured by defining the criteria, alternatives and the application of UTASTAR methods to calculate replacement rates. After these initial settings, an application of linear programming was developed to find the optimal allocation of enforcement resources of the municipal budget. Data from the budget of a municipality in southwestern Paraná were studied in the application of the model and analysis of results.