1 resultado para Abastecimento de água - Presidente Venceslau (SP)
em Repositório Institucional da Universidade Tecnológica Federal do Paraná (RIUT)
Resumo:
The main issues related to water conservation in urban centers are the increase in water supply cost, demand growth, pollution and differences in the distribution of water resources. Water conservation, the controlled and efficient use of water, includes both measures as reasonable means of water reuse. Thus, conservation practices are an effective way to meet demand and supply water to new activities and users without jeopardizing the supplying water bodies and preserving the natural environment. This study aims to examine the water management of a shopping mall and the use of rainwater harvesting combined with greywater reuse. For buildings in general, water loss is common due to leaks in the hydraulic and restroom equipment. These losses, which are caused by a high volume of water used and wasted in the system, are often the result of design errors, incorrect maintenance procedures and users' bad habits In southern Brazil, where there is rainfall almost all year long, water shortages occasionally occur, particularly in some winter mouths. One difficulty that appears on rainwater studies is the proper determination of rainwater volume that can be used to address water supply systems. In this work, the simulation method was used to determine this volume. Thus, simulations with the following variables: rainfall, catchment area and water consumption were performed. For mall's hydraulic systems, segmented alternatives are adopted. That is, focusing on the use of rainwater or greywater reuse. Other alternatives of effluent reuse have been slightly discussed due to sanitary issues, those are effluents from toilets and kitchen sinks. The adoption of greywater may be feasible if there is a significant flow of greywater to comply water demand for toilet flushing. The inspections made in this study found that the quantity of sinks was insufficient to supply an adequate amount of water to toilets and urinals. The greywater reuse system was found to be infeasible in terms of demand and supply of water. Conversely, the rainwater harvesting system was entirely feasible and easily supplied water to all restrooms and contributed to the cooling of the air conditioning system with a short payback period. One of the challenges of this work was the need to compare the actual water consumption with a water consumption parameter used in buildings. Thus, a method that addresses the generation of specific consumption indexes for specific activity (like a mall) was used. The water consumption indices showed that this mall has a satisfactory water management program.