9 resultados para Gerenciamento de fornecedores
em Repositório Institucional da Universidade Federal do Rio Grande do Norte
Resumo:
SILVA, Alexandre Reche e. LAUDMUS: rumo à implantação e gerenciamento de uma lista de audição musical online. In: ENCONTRO REGIONAL DA ABEM NORDESTE (Associação Brasileira de Educação Musical), 9, Natal, RN, 2010. Anais eletronicos... Natal, RN, 2010.Trabalho Completo. Disponivel em:
Resumo:
The present study has got as its aim to show how the impressions management is being used by the hotels in Paraiba State. For that, the dramma or role play perspective has been adopted as a model for service management. From the theater metaphor, the physical environment and its components can be seen as a scenery of the service show. We conduct the reader to notice the importance of the consummer about the service quality demand and its influence on his satisfaction. A methodology with exploring and qualifying nature has been adopted by using the analyses of content technique in interviews applied to hotel managers lebeled as having 4 and 5 stars in the State, trying to check how impression management takes place, identifying impression management tools used in relation to the physical evidences and to contacting people, as well as checking managers views in the survey about the use of impression management for client satisfaction make. The information revealed that managers, maybe for being unaware about impression management theory, haven t considered neither the physical evidences yet, nor contacting people as marketing tools. About the physical evidences, we could see that hotels take actions in a pulverized way referring to environment decoration and colors, however there isn t a global usage of physical evidences to highlight the service. Contacting people by their turn, receive better importance and attention. It was possible to make sure that managers are aware about the influence of the employee over the attendance quality. This way, we may come into a conclusion that impression management at Paraiba hotels has been under used, as long as managers seem to be, most times, turned to actions related to contacting people, not having realized the planning importance and national-wide use of service scenery in a genaral way yet
Resumo:
The inclusion of local suppliers in production chains has considerable impact on its performance, but most notably in its main actors. The results of this process may be of different kinds and can be analyzed from economic or institutional approaches. This study aimed to verify the existence of different performances of Petrobras due to the inclusion of local suppliers in the oil and gas production chain in the state of Rio Grande do Norte, from the viewpoints of transaction costs and the Institutional Theory. In order to this, were made the characterization of the PROMINP, the description of its actions and results, the mapping of its institutional context of reference, and identification of results obtained by Petrobras in terms of transaction costs and legitimacy. The theoretical framework is based on authors dealing with industrial concentration, as like Marshall, Krugman, Porter and Schmitz, from the sociological perspective of neoinstitucional theory, as like DiMaggio and Powell and Scott and Meyer, and transaction costs, as like Williamson. This is a qualitative research, with data collection done by consulting secondary fonts and semi-structured interviews with nineteen actors of three groups, namely: actors involved in actions of the program, representatives of enterprises and representative of Petrobras. To analyze the content was used the Suchman s model (1995) for categories associated with strategies of legitimation and fourteen variables associated with the three variables assets specificity, bounded rationality and opportunism (Williamson, 1995, 1989) in the case of transaction costs. The results indicate that PROMINP has achieved its objectives by encouraging the increased participation of local companies in the oil and gas production chain, reflecting in the economic development of the state. The Redepetro/RN, fostered and built upon the interaction of the participants, is presented as a solution of continuity to the participation of enterprises in the chain, after the closure of the actions of the program. PROMINP demands responses to coercive, legislative and regulatory pressures of the organizational field, whose institutional context of reference is wide. From the point of view of legitimacy, through strategies to gain cognitive legitimacy and maintaining pragmatic legitimacy, Petrobras can manipulate the environment, ensuring the compliance of the constituents to their technical and institutional demands. Enterprises, in turn, respond to the demands through compliance with technical demands, mainly through the certification of processes, and cultural changes. There aren t clear gains related to the transaction costs, however, gains in legitimacy can be seen as a cumulative capital that can serve as a competitive differential that generates economic gains. In terms of theoretical findings, it was found that, due to its explanatory power for actions that are difficult to explain only in economic terms, Institutional Theory may be used as theoretical support concurrent with other theories. TCE model has limitations in explaining the program actions. In the case, it s emphasized that Petrobras doesn t seek only economic efficiency, but has in its mission the commitment to social development.
Resumo:
The change in the economic world and the emergence of Internet as a tool for communication and integration among the markets have forced organizations to adopt a different structure, process-oriented with a focus on information management. Thus, information technology has gained prominence in the organizational context, increasing its complexity and range of services provided by this function. Moreover, outsourcing has become an important model for flexible corporate structure, helping organizations to achieve better results when carrying out their activities and processes and be more competitive. To make the IT outsourcing, it is necessary to follow certain steps that range from strategic assessment to the management of outsourced service. Such steps can influence the form of contracting services, varying the types of service providers and contractors. Thus, the study aimed to identify how this IT outsourcing process influences the use of models for contracting services. For this, a study was conducted in multiple cases study involving two companies in Rio Grande do Norte State, specifically the health sector. Data collection was carried out with the CIOs of the companies surveyed through semi-structured interviews. According to the results obtained, it was found that the outsourcing process more structured influences the use of a more advanced contracting model. However, there are features found in these steps carrying more clearly this influence, as the goals pursued by outsourcing, the criteria used in selecting the supplier, a contract negotiation, how to transition services and the use of methods management, but can vary depending on the level of maturity in the relationship of the companies examined. Moreover, it was found that the use of contracting model may also influence how it is developed the IT outsourcing process, requiring or not its more formalized and organization
Resumo:
The information technology - IT- benefits have been more perceived during the last decades. Both IT and business managers are dealing with subjects like governance, IT-Business alignment, information security and others on their top priorities. Talking about governance, specifically, managers are facing it with a technical approach, that gives emphasis on protection against invasions, antivirus systems, access controls and others technical issues. The IT risk management, commonly, is faced under this approach, that means, has its importance reduced and delegated to IT Departments. On the last two decades, a new IT risk management perspective raised, bringing an holistic view of IT risk to the organization. According to this new perspective, the strategies formulation process should take into account the IT risks. With the growing of IT dependence on most of organizations, the necessity of a better comprehension about the subject becomes more clear. This work shows a study in three public organizations of the Pernambuco State that investigates how those organizations manage their IT risks. Structured interviews were made with IT managers, and later, analyzed and compared with conceptual categories found in the literature. The results shows that the IT risks culture and IT governance are weakly understood and implemented on those organizations, where there are not such an IT risk methodology formally defined, neither executed. In addition, most of practices suggested in the literature were found, even without an alignment with an IT risks management process
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced
Resumo:
This work aims to analyze risks related to information technology (IT) in procedures related to data migration. This is done considering ALEPH, Integrated Libray System (ILS) that migrated data to the Library Module present in the software called Sistema Integrado de Gestão de Atividades Acadêmicas (SIGAA) at the Zila Mamede Central Library at the Federal University of Rio Grande do Norte (UFRN) in Natal/Brazil. The methodological procedure used was of a qualitative exploratory research with the realization of case study at the referred library in order to better understand this phenomenon. Data collection was able once there was use of a semi-structured interview that was applied with (11) subjects that are employed at the library as well as in the Technology Superintendence at UFRN. In order to examine data Content analysis as well as thematic review process was performed. After data migration the results of the interview were then linked to both analysis units and their system register with category correspondence. The main risks detected were: data destruction; data loss; data bank communication failure; user response delay; data inconsistency and duplicity. These elements point out implication and generate disorders that affect external and internal system users and lead to stress, work duplicity and hassles. Thus, some measures were taken related to risk management such as adequate planning, central management support, and pilot test simulations. For the advantages it has reduced of: risk, occurrence of problems and possible unforeseen costs, and allows achieving organizational objectives, among other. It is inferred therefore that the risks present in data bank conversion in libraries exist and some are predictable, however, it is seen that librarians do not know or ignore and are not very worried in the identification risks in data bank conversion, their acknowledge would minimize or even extinguish them. Another important aspect to consider is the existence of few empirical research that deal specifically with this subject and thus presenting the new of new approaches in order to promote better understanding of the matter in the corporate environment of the information units
Resumo:
Universidade Federal do Rio Grande do Norte