2 resultados para manned submersible

em Repositório Científico da Universidade de Évora - Portugal


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper is on modeling and simulation for an offshore wind system equipped with a semi-submersible floating platform, a wind turbine, a permanent magnet synchronous generator, a multiple point clamped four level or five level full-power converter, a submarine cable and a second order filter. The drive train is modeled by three mass model considering the resistant stiffness torque, structure and tower in deep water due to the moving surface elevation. The system control uses PWM by space vector modulation associated with sliding mode and proportional integral controllers. The electric energy is injected into the electric grid either by an alternated current link or by a direct current link. The model is intend to be a useful tool for unveil the behavior and performance of the offshore wind system, especially for the multiple point clamped full-power converter, under normal operation or under malfunctions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In order to turn more efficient the heating of class rooms in the lower floor of the old building of the University of Évora (a XVI century building), five drillings were organised inside the area of the university (Figure 1). The purpose was to use the temperature differential of groundwater in relation to air, by means of a heat exchanger, and use this process to heat the rooms using less energy, turning the heating process less expensive. The wells were drilled in fractured rocks (gneisses), and the purpose was to locate them at least around 100 m one from each other, whilst trying to have a hydraulic connection in-between. From the five initial wells, four were successful in terms of productivity, but just two of them (RA1 and RA2) proved to be hydraulically connected. The wells were equipped with screens for all their drilled depth (100 m), except for the first six meters and some two or three pipes of six meters each, to allow space for the installation for submersible pumps. The length of the installed screens guarantees a good efficiency of the system. In the wells with no connection, the heating system can work using each single well for abstraction and injection, but the process is much less efficient than in the cases where interaction between wells is possible through the rock’s fracture network.