178 resultados para team conflict

em Queensland University of Technology - ePrints Archive


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The success of many knowledge-intensive industries depends on creative projects that lie at the heart of their logic of production. The temporality of such projects, however, is an issue that is insufficiently understood. To address this, we study the perceived time frame of teams that work on creative projects and its effects on project dynamics. An experiment with 267 managers assigned to creative project teams with varying time frames demonstrates that compared to creative project teams with a relatively longer time frame, project teams with a shorter time frame focus more on the immediate present, are less immersed in their task, and utilize a more heuristic mode of information processing. Furthermore, we find that time frame moderates the negative effect of team conflict on team cohesion. These results are consistent with our theory that the temporary nature of creative projects shapes different time frames among project participants, and that it is this time frame that is an important predictor of task and team processes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study was aimed at examining the safety climate and relational conflict within teams at the individual level. A sample of 372 respondents, divided into 50 teams, was used to test our hypothesis. It was proposed - and discovered - that team members’ individual differences in need for closure mitigated the negative relationship between perceptions of team safety climate and team relational conflict. The implications of our findings and the study’s limitations are discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The study aimed to examine shiftworkers fatigue and the longitudinal relationships that impact on fatigue such as team climate, work life conflict, control of shifts and shift type in shift working nurses. We used a quantitative survey methodology and analysed data with a moderated hierarchical multiple regression. After matching across two time periods 18 months apart, the sample consisted of 166 nurses from one Australian hospital. Of these nurses, 61 worked two rotating day shifts (morning & afternoon/evening) and 105 were rotating shiftworkers who worked three shifts (morning afternoon/evening and nights). The findings suggest that control over shift scheduling can have significant effects on fatigue for both two-shift and three-shift workers. A significant negative relationship between positive team climate and fatigue was moderated by shift type. At both Time 1 and Time 2, work life conflict was the strongest predictor of concurrent fatigue, but over time it was not.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In June 2011, a research project team from the Institute for Ethics, Governance and Law (IEGL), Queensland University of Technology, the United Nations University, and the Australian Government’s Asia Pacific Civil-Military Centre of Excellence (APCMCOE) held three Capacity-Building Workshops (the Workshops) on the Responsibility to Protect (R2P) and the Protection of Civilians (POC) in Armed Conflict in Manila, Kuala Lumpur, and Jakarta. The research project is funded by the Australian Responsibility to Protect Fund, with support from APCMCOE. Developments in Libya and Cote d’Ivoire and the actions of the United Nations Security Council have given new significance to the relationship between R2P and POC, providing impetus to the relevance and application of the POC principle recognised in numerous Security Council resolutions, and the R2P principle, which was recognised by the United Nations General Assembly in 2005 and, now, by the Security Council. The Workshops considered the relationship between R2P and POC. The project team presented the preliminary findings of their study and sought contributions and feedback from Workshop participants. Prior to the Workshops, members of the project team undertook interviews with UN offices and agencies, international organisations (IOs) and non-government organisations (NGOs) in Geneva and New York as part of the process of mapping the relationship between R2P and POC. Initial findings were considered at an Academic-Practitioner Workshop held at the University of Sydney in November 2010. In addition to an extensive literature review and a series of academic publications, the project team is preparing a practical guidance text (the Guide) on the relationship between R2P and POC to assist the United Nations, governments, regional bodies, IOs and NGOs in considering and applying appropriate protection strategies. It is intended that the Guide be presented to the United Nations Secretariat in New York in early 2012. The primary aim of the Workshops was to test the project’s initial findings among an audience of diplomats, military, police, civilian policy-makers, practitioners, researchers and experts from within the region. Through dialogue and discussion, the project team gathered feedback – comments, questions, critique and suggestions – to help shape the development of practical guidance about when, how and by whom R2P and POC might be implemented.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study investigates the existence of intercultural adjustment in the multicultural construction workplaces by examining the leadership orientations (task-/people-orientation), communication and conflict resolution skills (high/low-context culture), and power relationship styles (high/low power distance) of local Chinese and the British expatriate project managers in the multinational construction companies in Hong Kong. A sample of project managers (N = 40) and their subordinates (N = 61) were surveyed using the structured questionnaires. Statistical techniques (independent-samples t-test, and Pearson correlation analysis) were employed to evaluate the data. The results revealed a number of interesting findings. First, it was found that both project manager groups equally considered the importance of task performance and interpersonal relationship. The results of correlations analysis provide support for the linkages of the length of working abroad with the change in task/people orientation for Chinese and expatriate managers. The analysis revealed that those Chinese managers who have the longest length of time living or working in Western countries tended to measure higher on task-orientation. Similarly, those British expatriate managers who have the longest period of working in Hong Kong tended to be less task-orientated. Second, local Chinese managers were found to be more confrontational when they strongly disagree with their team members than their British expatriate counterparts. It would appear that stress from project deadline which increase the directness and terseness in communication acts, and retain the composure of project managers in dealing with the subordinates. Finally, our findings show that there is significant difference between local Chinese and British expatriate managers in their power relationship with subordinates. This implies that although the intercultural adjustment might influence perceptions of local and expatriate managers, some dominant deep-rooted cultural values and beliefs are still not easily altered. Conclusions are presented along with suggestions for future studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Current software tools for documenting and developing models of buildings focus on supporting a single user who is a specialist in the specific software used within their own discipline. Extensions to these tools for use by teams maintain the single discipline view and focus on version and file management. There is a perceived need in industry to have tools that specifically support collaboration among individuals from multiple disciplines with both a graphical representation of the design and a persistent data model. This project involves the development of a prototype of such a software tool. We have identified multi-user 3D virtual worlds as an appropriate software base for the development of a collaborative design tool. These worlds are inherently multi-user and therefore directly support collaboration through a sense of awareness of others in the virtual world, their location within the world, and provide various channels for direct and indirect communication. Such software platforms also provide a 3D building and modelling environment that can be adapted to the needs of the building and construction industry. DesignWorld is a prototype system for collaborative design developed by augmenting the Second Life (SL) commercial software platform1 with a collection web-based tools for communication and design. Agents manage communication between the 3D virtual world and the web-based tools. In addition, agents maintain a persistent external model of designs in the 3D world which can be augmented with data such as relationships, disciplines and versions not usually associated with 3D virtual worlds but required in design scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.