655 resultados para public purpose

em Queensland University of Technology - ePrints Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project set out to explore Unitary Authority (UA) involvement in festivals and special events across Wales. It considers the level and nature of UA involvement and investigates activity by event purpose; reasons for, and characteristics of, UA engagement; and, crucially, the extent and nature of event evaluation. The study’s aim was to begin the development of a baseline of information for further research into the growing use of festivals and special events as a strategy for local economic development in Wales. A quantitative survey approach facilitated a comprehensive snapshot of UA responses whilst also incorporating discursive elements. A telephone survey was designed and undertaken with representatives of all 22 UA departments responsible for festivals and events in Wales. The research reveals a significant level of festival and special event activity across Wales, supported primarily for its perceived socio-cultural value. However, evaluation would appear to be focused on improving processes and measuring economic outputs rather than assessing whether socio-cultural objectives are being achieved. Whilst overwhelmingly positive about efforts to improve approaches to evaluation, respondents held clear views about the complications most likely to hamper any such efforts. These responses focused upon the need for flexibility, cost effectiveness and comparability across festival and special event typologies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this research is to capture and interpret the stories of “outsider” managers who make the transition to the public sector. These experiences are considered in the context of efforts to shift public management culture in a direction consistent with meeting contemporary demands placed on public sector organisations. It is often noted that an important strategy for changing culture is the infusion of outsiders. Outsiders are thought to bring new perspectives that, through a dialectical process (Van de Ven 1995), create the potential for change. While there have been cross-sector comparisons (Broussine 1990; Silfvast 1994; Redman 1997), little attention has been given to the experience of those who make the transition in the context of efforts to reform public sector management culture. Not only is the infusion of private sector managers into the public sector a potential culture change strategy, it is also a personal experience for those who make the transition. Boundary crossing is typically an anxiety provoking experience (Van Maanen & Schein 1979) and the quality of this experience influences decisions to commit, engage, disengage or exit. The quality of the experience is likely to be affected by how the public organisation responds to people making this transition, that is, their investment in people processing (Saks 2007). The cost of recruitment and selection processes at middle and senior management levels warrants a greater research focus on this transition. In this paper we argue that the experiences of those who make the transition from private to public sectors has much to tell us about the traps that transition managers experience in making this change, the implications for injecting outsider managers as a strategy for achieving public management culture change, and how reform-oriented public organisations can manage the transitions of outsider managers into the public sector in order that best value might be achieved for both the individual and organisational change goals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this paper is to emphasis the significance of public asset management in Indonesia that is by identifying opportunities and challenges of Indonesian local governments in adopting current practice of Public Asset Management System. A Case Study, in South Sulawesi Provincial government was used as the approach to achieve the research objective. The case study involved two data collection techniques i.e. interviews followed by study on documents. The result of the study indicates there are some significant opportunities and challenges that Indonesian local government might deal with in adopting current practice of public asset management. There are opportunities that can lead to more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, and improve the quality of public services. The challenges include no clear institutional and legal framework to support the asset management application, non-profit principle of public assets, cross jurisdictions in public asset management, complexity of local government objectives, and unavailability of data for managing public property. The study only covers condition of South Sulawesi Province, which could not represent exactly the whole local governments’ condition in Indonesia. Findings from this study provide useful input for the policy makers, scholars and asset management practitioners in Indonesia to establish a public asset management framework that suitable for Indonesia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: With the increasing interest in Public Private Partnership (PPP) there is a need to investigate the factors contributing to successful delivery of PPP projects. Design/methodology/approach: An empirical questionnaire survey was conducted in Hong Kong and Australia. The survey respondents were asked to rate eighteen factors which contribute to delivering successful PPP projects. Findings: The findings from this survey were further compared with the results achieved by a previous researcher (Li, 2003) in a similar survey conducted in the United Kingdom. The comparison showed that amongst the top five success factors ranked by Hong Kong respondents, three were also ranked highly by the Australians and British. These success factors included: ‘Commitment and responsibility of public and private sectors’; ‘Strong and good private consortium’; and ‘Appropriate risk allocation and risk sharing’. Originality/value: These success factors were therefore found to be important for contributing to successful PPP projects irrespective of geographical locations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: As part of a comprehensive research study looking at implementing PPPs, interviews with experienced researchers were conducted to realize their views on private sector involvement in public works projects. Design / methodology / approach: Amongst these interviews, five were launched with academics from Hong Kong and Australia, and two were conducted with Legislative Councillors of the Hong Kong Special Administration Region (HKSAR) government. Findings: The interview findings show that both Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. The interviewees highlighted that “Different risk profiles” and “Private sector more innovative / efficient” were the main differences between projects that were procured by PPP and traditionally. Other differences include risk transfer. In a PPP arrangement the public sector passes on a substantial amount of the project risks to the private sector, whereas in a traditional case the public sector would take the largest responsibility in bearing these risks. Another common feature of the private sector is that they tend to be more efficient and innovative when compared to the public sector hence their expertise is often reflected in PPP projects. The interviewees agreed that the key performance indicators for PPP projects were unique depending on the individual project. The critical success factors mentioned by both groups of interviewees included “Transparent process”, “Project dependent” and “Market need”. Due to the fact that PPP projects tend to be large scaled costly projects, adequate transparency in the process is necessary in order to demonstrate that a fair selection and tendering process is conducted. A market need for the project is also important to ensure that the project will be financially secure and that the private sector can make a reasonable profit to cover their project expenditure. Originality / value: The findings from this study have enabled a comparative analysis between the views of researchers in two completely different jurisdictions. With the growing popularity to implement PPP projects, it is believed that the results presented in this paper would be of interest to the industry at large.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose : The Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) is an international leading commercial hub particularly in Asia. In order to keep up its reputation a number of large public works projects have been considered. Public Private Partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The findings presented in this paper will specifically consider whether PPPs should be used to procure public works projects in Hong Kong by studying the attractive and negative factors for adopting PPP. Design/methodology/approach : As part of this study a questionnaire survey was conducted with industrial practitioners. The respondents were requested to rank the importance of fifteen attractive factors and thirteen negative factors for adopting PPP. Findings : The results found that in general the top attractive factors ranked by respondents from Hong Kong were efficiency related, these included (1) ‘Provide an integrated solution (for public infrastructure / services)’; (2) ‘Facilitate creative and innovative approaches’; and (3) ‘Solve the problem of public sector budget restraint’. It was found that Australian respondents also shared similar findings to those in Hong Kong, but the United Kingdom respondents showed a higher priority to those economic driven attractive factors. Also, the ranking of the attractive and negative factors for adopting PPP showed that on average the attractive factors were scored higher than the negative factors. Originality/value : The results of this research have enabled a comparison of the attractive and negative factors for adopting PPP between three administrative systems. These findings have confirmed that PPP is a suitable means to procure large public projects which are believed to be useful and interesting to PPP researchers and practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the buyer awareness and acceptance of environmental and energy efficiency measures in the New Zealand residential property markets. This study aims to provide a greater understanding of consumer behaviour in the residential property market in relation to green housing issues ---------- Design/methodology/approach – The paper is based on an extensive survey of Christchurch real estate offices and was designed to gather data on the factors that were considered important by buyers in the residential property market. The survey was designed to allow these factors to be analysed on a socio-economic basis and to compare buyer behaviour based on property values. ---------- Findings – The results show that regardless of income levels, buyers still consider that the most important factor in the house purchase decision is the location of the property and price. Although the awareness of green housing issues and energy efficiency in housing is growing in the residential property market, it is only a major consideration for young and older buyers in the high income brackets and is only of some importance for all other buyer sectors of the residential property market. Many of the voluntary measures introduced by Governments to improve the energy efficiency of residential housing are still not considered important by buyers, indicating that a more mandatory approach may have to be undertaken to improve energy efficiency in the established housing market, as these measures are not valued by the buyer. ---------- Originality/value – The paper confirms the variations in real estate buyer behaviour across the full range of residential property markets and the acceptance and awareness of green housing issues and measures. These results would be applicable to most established and transparent residential property markets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research used the Queensland Police Service, Australia, as a major case study. Information on principles, techniques and processes used, and the reason for the recording, storing and release of audit information for evidentiary purposes is reported. It is shown that Law Enforcement Agencies have a two-fold interest in, and legal obligation pertaining to, audit trails. The first interest relates to the situation where audit trails are actually used by criminals in the commission of crime and the second to where audit trails are generated by the information systems used by the police themselves in support of the recording and investigation of crime. Eleven court cases involving Queensland Police Service audit trails used in evidence in Queensland courts were selected for further analysis. It is shown that, of the cases studied, none of the evidence presented was rejected or seriously challenged from a technical perspective. These results were further analysed and related to normal requirements for trusted maintenance of audit trail information in sensitive environments with discussion on the ability and/or willingness of courts to fully challenge, assess or value audit evidence presented. Managerial and technical frameworks for firstly what is considered as an environment where a computer system may be considered to be operating “properly” and, secondly, what aspects of education, training, qualifications, expertise and the like may be considered as appropriate for persons responsible within that environment, are both proposed. Analysis was undertaken to determine if audit and control of information in a high security environment, such as law enforcement, could be judged as having improved, or not, in the transition from manual to electronic processes. Information collection, control of processing and audit in manual processes used by the Queensland Police Service, Australia, in the period 1940 to 1980 was assessed against current electronic systems essentially introduced to policing in the decades of the 1980s and 1990s. Results show that electronic systems do provide for faster communications with centrally controlled and updated information readily available for use by large numbers of users who are connected across significant geographical locations. However, it is clearly evident that the price paid for this is a lack of ability and/or reluctance to provide improved audit and control processes. To compare the information systems audit and control arrangements of the Queensland Police Service with other government departments or agencies, an Australia wide survey was conducted. Results of the survey were contrasted with the particular results of a survey, conducted by the Australian Commonwealth Privacy Commission four years previous, to this survey which showed that security in relation to the recording of activity against access to information held on Australian government computer systems has been poor and a cause for concern. However, within this four year period there is evidence to suggest that government organisations are increasingly more inclined to generate audit trails. An attack on the overall security of audit trails in computer operating systems was initiated to further investigate findings reported in relation to the government systems survey. The survey showed that information systems audit trails in Microsoft Corporation's “Windows” operating system environments are relied on quite heavily. An audit of the security for audit trails generated, stored and managed in the Microsoft “Windows 2000” operating system environment was undertaken and compared and contrasted with similar such audit trail schemes in the “UNIX” and “Linux” operating systems. Strength of passwords and exploitation of any security problems in access control were targeted using software tools that are freely available in the public domain. Results showed that such security for the “Windows 2000” system is seriously flawed and the integrity of audit trails stored within these environments cannot be relied upon. An attempt to produce a framework and set of guidelines for use by expert witnesses in the information technology (IT) profession is proposed. This is achieved by examining the current rules and guidelines related to the provision of expert evidence in a court environment, by analysing the rationale for the separation of distinct disciplines and corresponding bodies of knowledge used by the Medical Profession and Forensic Science and then by analysing the bodies of knowledge within the discipline of IT itself. It is demonstrated that the accepted processes and procedures relevant to expert witnessing in a court environment are transferable to the IT sector. However, unlike some discipline areas, this analysis has clearly identified two distinct aspects of the matter which appear particularly relevant to IT. These two areas are; expertise gained through the application of IT to information needs in a particular public or private enterprise; and expertise gained through accepted and verifiable education, training and experience in fundamental IT products and system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this article our starting point is the current context of national curriculum change and intense speculation about the assessment, standards and reporting. It is written against a background of accountability measures and improvement imperatives, and focuses attention on standards as offering representations of quality. We understand standards to be constructs that aim to achieve public credibility and utility. Further, they can be examined for the purposes they seek to serve and also their expected functions. Fitness for purpose is therefore a useful notion in considering the nature of standards. Our interest in the discussion is the ‘fit’ between how standards are formulated and how they are used in practice, by whom and for what purposes. A related interest is in the matter of how standards can be harnessed to realise improvement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose To identify the challenges faced by local government in Indonesia when adopting a Public Asset Management Framework. Design A Case Study in South Sulawesi Provincial Government was used as the approach to achieving the research objective. The case study involved two data collection techniques - interviews and document analysis. Findings The result of the study indicates there are significant challenges that the Indonesian local government need to manage when adopting a public asset management framework. Those challenges are: absence of an institutional and legal framework to support the asset management application; non-profit principle of public assets; multiple jurisdictions involved in the public asset management processes; the complexity of local government objectives; unavailability of data for managing public property; and limited human resources. Research Limitation This research is limited to one case study. It is a preliminary study from larger research that uses multiple case studies. The main research also investigates opportunities for local government by adopting and implementing public asset management. Originality/Value Findings from this study provide useful input for the policy makers, academics and asset management practitioners in Indonesia to establish a public asset management framework resulting in efficient and effective organizations, as well as an increase of public services quality. This study has a potential application for other developing countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The major purpose of Vehicular Ad Hoc Networks (VANETs) is to provide safety-related message access for motorists to react or make a life-critical decision for road safety enhancement. Accessing safety-related information through the use of VANET communications, therefore, must be protected, as motorists may make critical decisions in response to emergency situations in VANETs. If introducing security services into VANETs causes considerable transmission latency or processing delays, this would defeat the purpose of using VANETs to improve road safety. Current research in secure messaging for VANETs appears to focus on employing certificate-based Public Key Cryptosystem (PKC) to support security. The security overhead of such a scheme, however, creates a transmission delay and introduces a time-consuming verification process to VANET communications. This paper proposes an efficient public key management system for VANETs: the Public Key Registry (PKR) system. Not only does this paper demonstrate that the proposed PKR system can maintain security, but it also asserts that it can improve overall performance and scalability at a lower cost, compared to the certificate-based PKC scheme. It is believed that the proposed PKR system will create a new dimension to the key management and verification services for VANETs.