Until recently, sustainable development was perceived as essentially an environmental issue, relating to the integration of environmental concerns into economic decision-making. As a result, environmental considerations have been the primary focus of sustainability decision making during the economic development process for major projects, and the assessment and preservation of social and cultural systems has been arguably too limited. The practice of social impact and sustainability assessment is an established and accepted part of project planning, however, these practices are not aimed at delivering sustainability outcomes for social systems, rather they are designed to minimise ‘unsustainability’ and contribute to project approval. Currently, there exists no widely recognised standard approach for assessing social sustainability and accounting for positive externalities of existing social systems in project decision making. As a result, very different approaches are applied around the world, and even by the same organisations from one project to another. This situation is an impediment not only to generating a shared understanding of the social implications as related to major projects, but more importantly, to identifying common approaches to help improve social sustainability outcomes of proposed activities. This paper discusses the social dimension of sustainability decision making of mega-projects, and argues that to improve accountability and transparency of project outcomes it is important to understand the characteristics that make some communities more vulnerable than others to mega-project development. This paper highlights issues with current operational level approaches to social sustainability assessment at the project level, and asserts that the starting point for project planning and sustainability decision making of mega-projects needs to include the preservation, maintenance, and enhancement of existing social and cultural systems. It draws attention to the need for a scoping mechanism to systematically assess community vulnerability (or sensitivity) to major infrastructure development during the feasibility and planning stages of a project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since 2001, district governments have had the main responsibility for providing public health care in Indonesia. One of the main public health challenges facing many district governments is improving nutritional standards, particularly among poorer segments of the population. Developing effective policies and strategies for improving nutrition requires a multi-sectoral approach encompassing agricultural development policy, access to markets, food security (storage) programs, provision of public health facilities, and promotion of public awareness of nutritional health. This implies a strong need for a coordinated approach involving multiple government agencies at the district level. Due to diverse economic, agricultural, and infrastructure conditions across the country, district governments’ ought to be better placed than central government both to identify areas of greatest need for public nutrition interventions, and devise policies that reflect local characteristics. However, in the two districts observed in this study—Bantul and Gunungkidul—it was clear that local government capacity to generate, obtain and integrate evidence about local conditions into the policy-making process was still limited. In both districts, decision-makers tended to rely more on intuition,anecdote, and precedent in formulating policy. The potential for evidence-based decision making was also severely constrained by a lack of coordination and communication between agencies, and current arrangements related to central government fiscal transfers, which compel local governments to allocate funding to centrally determined programs and priorities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Improved public awareness and strong sentiments towards environmental issues will continue to create increasing demand for sustainable housing (SH) in the coming years. Despite this potential, the up-take rate of sustainable housing in new build and through home renovation is not as high as expected within the housing industry. This is in contrast to the influx of emerging building technologies, new materials and innovative designs seen in exemplar homes built worldwide. How we should use the increasing awareness of SH and emerging technologies as an impetus to change the un-sustainable designs and practices of the building industry is high on the agenda of the government and majority of the stakeholders involved. This warrants the study of multifaceted strategies that meet the needs of multiple stakeholders and integrated seamlessly into housing development processes. Specifically, the different perceptions, roles and incentives of stakeholders, who inevitably need to ensure their benefits and commercial returns, should be highlighted and acted upon. ----- This paper discusses the preliminary findings of a research project that aims to promote SH implementation by identifying and materializing the mutual benefits among key stakeholders. The aim is to be achieved through questionnaire surveys, structural equation modelling, interviews and case studies with seven major stakeholders within the Australian housing industry. This research identifies the influence and relationship of relevant factors, investigates preferences, similarities and differences between stakeholders on perceived benefits and in turn explores the mutual-benefit strategy package that facilitates decision making towards sustainable housing development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.