870 resultados para performance appraisal

em Queensland University of Technology - ePrints Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Subcontractors contribute significantly to construction projects and their performance can seriously affect over-all project success. It is crucial, therefore, to appraise the performance of subcontractors to ensure they satisfy the client's expectations and project requirements. To increase the transparency and accuracy of subcontractor appraisal, the baseline and target performance levels should be set at the outset so that the appraisers and those being appraised realize exactly what standards are to be achieved. The balanced scorecard, being a powerful tool for performance appraisal, offers a potentially good approach for modeling the subcontractor appraisal process. In this paper, an approach to developing a balanced scorecard subcontractor appraisal model is proposed and demonstrated through a questionnaire survey administered in Hong Kong and from which the baseline and target performance levels for large-scale skilled subcontractors are identified. A case example is used to illustrate the operation of the model. Finally, a means by which the model may be validated is demonstrated through the use of field experts. The results demonstrate the feasibility of developing a balanced scorecard model that can help improve the transparency of subcontractor appraisal despite the baseline and target performance levels changing according to the project characteristics, subcontractor categories and size.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The use of professional competency standards to assess postgraduate nursing student’s clinical performance has been in place since 2004, at the Queensland University of Technology, School of Nursing & Midwifery (SONAM) when the Graduate Certificate in Emergency Nursing degree commenced. Emergency nursing students were assessed in their workplace, using a Clinical Performance Appraisal Tool or CPAT which was based on the Australian College of Critical Care Nurses (ACCCN) Competency Standards. With the subsequent formation of a separate Emergency Nursing Course advisory group in 2007, there was a review of clinical assessment course component. The release of the 2008 CENA revised Practice Standards for the Emergency Nursing Specialist’s, led to the emergency nursing course advisory committee supporting the integration of the CENA practice standards for assessment of emergency nurses in preference to the less relevant ACCCN competency standards. The SONAM emergency nursing study area team commenced the phasing in and progression of the CENA practice standards across the two Graduate Certificate units, and Graduate Diploma and Master of Nursing (emergency) clinical major options in 2009. As some units undertaken in the degree are available to nurses in other disciplines a separate CPAT was devised for the clinical assessments according to speciality context. The team has had to carefully consider how the professional standards are integrated into the teaching and assessment of the unit and not just applied instead of the ACCCN competency standards. Professional standards for the emergency context has also helped tailor course content and learning outcomes to be relevant across a number of emergency nursing contexts in Australia. The assessment of the CPAT is undertaken at the workplace by QUT appointed clinical lecturers. Clinical lecturers need to apply and have suitable postgraduate qualification to undertake the position. The clinical lecturer support role is well established at QUT. The integration of the new CENA practice standards has necessitated a review of the postgraduate assessment of emergency nurses. A clinical lecturer workshop has been organised to review role, scope and how to utilise the new look CENA based CPAT, clinical assessment format.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research shows that gross pollutant traps (GPTs) continue to play an important role in preventing visible street waste—gross pollutants—from contaminating the environment. The demand for these GPTs calls for stringent quality control and this research provides a foundation to rigorously examine the devices. A novel and comprehensive testing approach to examine a dry sump GPT was developed. The GPT is designed with internal screens to capture gross pollutants—organic matter and anthropogenic litter. This device has not been previously investigated. Apart from the review of GPTs and gross pollutant data, the testing approach includes four additional aspects to this research, which are: field work and an historical overview of street waste/stormwater pollution, calibration of equipment, hydrodynamic studies and gross pollutant capture/retention investigations. This work is the first comprehensive investigation of its kind and provides valuable practical information for the current research and any future work pertaining to the operations of GPTs and management of street waste in the urban environment. Gross pollutant traps—including patented and registered designs developed by industry—have specific internal configurations and hydrodynamic separation characteristics which demand individual testing and performance assessments. Stormwater devices are usually evaluated by environmental protection agencies (EPAs), professional bodies and water research centres. In the USA, the American Society of Civil Engineers (ASCE) and the Environmental Water Resource Institute (EWRI) are examples of professional and research organisations actively involved in these evaluation/verification programs. These programs largely rely on field evaluations alone that are limited in scope, mainly for cost and logistical reasons. In Australia, evaluation/verification programs of new devices in the stormwater industry are not well established. The current limitations in the evaluation methodologies of GPTs have been addressed in this research by establishing a new testing approach. This approach uses a combination of physical and theoretical models to examine in detail the hydrodynamic and capture/retention characteristics of the GPT. The physical model consisted of a 50% scale model GPT rig with screen blockages varying from 0 to 100%. This rig was placed in a 20 m flume and various inlet and outflow operating conditions were modelled on observations made during the field monitoring of GPTs. Due to infrequent cleaning, the retaining screens inside the GPTs were often observed to be blocked with organic matter. Blocked screens can radically change the hydrodynamic and gross pollutant capture/retention characteristics of a GPT as shown from this research. This research involved the use of equipment, such as acoustic Doppler velocimeters (ADVs) and dye concentration (Komori) probes, which were deployed for the first time in a dry sump GPT. Hence, it was necessary to rigorously evaluate the capability and performance of these devices, particularly in the case of the custom made Komori probes, about which little was known. The evaluation revealed that the Komori probes have a frequency response of up to 100 Hz —which is dependent upon fluid velocities—and this was adequate to measure the relevant fluctuations of dye introduced into the GPT flow domain. The outcome of this evaluation resulted in establishing methodologies for the hydrodynamic measurements and gross pollutant capture/retention experiments. The hydrodynamic measurements consisted of point-based acoustic Doppler velocimeter (ADV) measurements, flow field particle image velocimetry (PIV) capture, head loss experiments and computational fluid dynamics (CFD) simulation. The gross pollutant capture/retention experiments included the use of anthropogenic litter components, tracer dye and custom modified artificial gross pollutants. Anthropogenic litter was limited to tin cans, bottle caps and plastic bags, while the artificial pollutants consisted of 40 mm spheres with a range of four buoyancies. The hydrodynamic results led to the definition of global and local flow features. The gross pollutant capture/retention results showed that when the internal retaining screens are fully blocked, the capture/retention performance of the GPT rapidly deteriorates. The overall results showed that the GPT will operate efficiently until at least 70% of the screens are blocked, particularly at high flow rates. This important finding indicates that cleaning operations could be more effectively planned when the GPT capture/retention performance deteriorates. At lower flow rates, the capture/retention performance trends were reversed. There is little difference in the poor capture/retention performance between a fully blocked GPT and a partially filled or empty GPT with 100% screen blockages. The results also revealed that the GPT is designed with an efficient high flow bypass system to avoid upstream blockages. The capture/retention performance of the GPT at medium to high inlet flow rates is close to maximum efficiency (100%). With regard to the design appraisal of the GPT, a raised inlet offers a better capture/retention performance, particularly at lower flow rates. Further design appraisals of the GPT are recommended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As part of Australian licensing requirements professional valuers are required to maintain a level of professional indemnity insurance. A core feature of any insurance cover is that the insured has an obligation to notify their insurer of both actual and potential claims. An actual claim clearly will impact upon future policies and premiums paid. Notification of a potential claim, whether or not the notification crystallises into an actual claim, also can have an impact upon the insured’s claims history and premiums. The Global Financial Crisis continues to impact upon business practices and land transactions both directly and indirectly. The Australian valuation profession is not exempt from this impact. One example of this ongoing impact is reflected in a worrying practice engaged in by some financial institutions in respect of their loan portfolios. That is, even though the mortgagor is not in default, some institutions are pre-emptively issuing notices of demand regarding potential losses. Further, in some instances such demands are based only on mass appraisal valuations without specific consideration being given to the individual lot in question. The author examines the impact of this practice for the valuation profession and seeks to provide guidance for the appropriate handling of such demands.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In today's high-pressure work environment, project managers are often forced to “do more with less.” We argue that this imperative can lead project managers to engage in either high-performance or abusive supervision behaviors. To understand this process, we develop a model and associated propositions linking a project manager's cognitive appraisal of project-related demands to high-performance work practices versus abusive supervision behaviors—both of which impact three project outcomes: stakeholder relationships, people-related project success factors, and employee well-being. We propose that the choice between high-performance work practices and abusive supervision behaviors is moderated by a project manager's personal resources (psychological capital, emotional intelligence, and dark triad personality).