Resumo:
Network Interfaces (NIs) are used in Multiprocessor System-on-Chips (MPSoCs) to connect CPUs to a packet switched Network-on-Chip. In this work we introduce a new NI architecture for our hierarchical CoreVA-MPSoC. The CoreVA-MPSoC targets streaming applications in embedded systems. The main contribution of this paper is a system-level analysis of different NI configurations, considering both software and hardware costs for NoC communication. Different configurations of the NI are compared using a benchmark suite of 10 streaming applications. The best performing NI configuration shows an average speedup of 20 for a CoreVA-MPSoC with 32 CPUs compared to a single CPU. Furthermore, we present physical implementation results using a 28 nm FD-SOI standard cell technology. A hierarchical MPSoC with 8 CPU clusters and 4 CPUs in each cluster running at 800MHz requires an area of 4.56mm2.
Resumo:
From the perspective of network, a project team’s social capital consists of conduits network, and resource exchange network. Prior research intensively studies the effect of the structure of conduits network on the team’s performance, assuming knowledge transfer is the causal mechanism linking conduits network to performance. This paper attempts to explore the interrelations between conduits network and knowledge network, and further distinguish the different influence between various conduit networks, and hypothesizes that a project team’s knowledge network mediates the effect of various conduit networks on the team’s performance. This research can enrich our knowledge of disparate influence of the various conduit networks on knowledge transfer, and imply some management practices to enhance the organization’s social capital, and hence improve the organization’s performance.
Resumo:
Agriculture accounts for a significant portion of the GDP in most developed countries. However, managing farms, particularly largescale extensive farming systems, is hindered by lack of data and increasing shortage of labour. We have deployed a large heterogeneous sensor network on a working farm to explore sensor network applications that can address some of the issues identified above. Our network is solar powered and has been running for over 6 months. The current deployment consists of over 40 moisture sensors that provide soil moisture profiles at varying depths, weight sensors to compute the amount of food and water consumed by animals, electronic tag readers, up to 40 sensors that can be used to track animal movement (consisting of GPS, compass and accelerometers), and 20 sensor/actuators that can be used to apply different stimuli (audio, vibration and mild electric shock) to the animal. The static part of the network is designed for 24/7 operation and is linked to the Internet via a dedicated high-gain radio link, also solar powered. The initial goals of the deployment are to provide a testbed for sensor network research in programmability and data handling while also being a vital tool for scientists to study animal behavior. Our longer term aim is to create a management system that completely transforms the way farms are managed.
Resumo:
Monitoring stream networks through time provides important ecological information. The sampling design problem is to choose locations where measurements are taken so as to maximise information gathered about physicochemical and biological variables on the stream network. This paper uses a pseudo-Bayesian approach, averaging a utility function over a prior distribution, in finding a design which maximizes the average utility. We use models for correlations of observations on the stream network that are based on stream network distances and described by moving average error models. Utility functions used reflect the needs of the experimenter, such as prediction of location values or estimation of parameters. We propose an algorithmic approach to design with the mean utility of a design estimated using Monte Carlo techniques and an exchange algorithm to search for optimal sampling designs. In particular we focus on the problem of finding an optimal design from a set of fixed designs and finding an optimal subset of a given set of sampling locations. As there are many different variables to measure, such as chemical, physical and biological measurements at each location, designs are derived from models based on different types of response variables: continuous, counts and proportions. We apply the methodology to a synthetic example and the Lake Eacham stream network on the Atherton Tablelands in Queensland, Australia. We show that the optimal designs depend very much on the choice of utility function, varying from space filling to clustered designs and mixtures of these, but given the utility function, designs are relatively robust to the type of response variable.
Resumo:
The power of projects has been demonstrated by the growth in their use across an increasing range of industries and workplaces in recent years. Not only has the number of people involved in project management increased, but the qualifications and backgrounds of those people have also broadened, with engineering no longer being the only path to project management (PM). Predicting the career trajectories in Project Management has become more important for both organisations employing project managers and project managers building career portfolios. Our research involved interviewing more than 75 project officers and project managers across a range of industries to explore their career journey. We used Wittgenstein’s family resemblance theory is to analyse the information from the transcripts to identify the extent to which the roles of participants fit with the commonly accepted definition of project management. Findings demonstrate diversity of project manager backgrounds and experiences and relational competencies across these backgrounds that form and shape PM careers.
Resumo:
A common challenge among OECD countries has been the development of education and training pathways that accommodate student needs and interests at the upper secondary level (OECD, 2000). The introduction of trade-focussed Australian Technical Colleges (ATCs) has met with mixed response. The ATCs aim to create a supported transition from school to work through dual pathway programs enabling students to follow a trade career while completing their upper secondary studies. There has been little explicit examination of the effectiveness of such senior secondary school arrangements. Using one such Australian Technical College as a case-study, this paper investigates the perceptions of the employers and students who were associated with the college. Using mixed-methods consisting of quantitative perception surveys and focus interviews, the results of this study show that students and employers are very satisfied with the College and illustrate that students have made significant gains in relating their learning to the workplace and everyday life.
Resumo:
In this paper, the problems of three carrier phase ambiguity resolution (TCAR) and position estimation (PE) are generalized as real time GNSS data processing problems for a continuously observing network on large scale. In order to describe these problems, a general linear equation system is presented to uniform various geometry-free, geometry-based and geometry-constrained TCAR models, along with state transition questions between observation times. With this general formulation, generalized TCAR solutions are given to cover different real time GNSS data processing scenarios, and various simplified integer solutions, such as geometry-free rounding and geometry-based LAMBDA solutions with single and multiple-epoch measurements. In fact, various ambiguity resolution (AR) solutions differ in the floating ambiguity estimation and integer ambiguity search processes, but their theoretical equivalence remains under the same observational systems models and statistical assumptions. TCAR performance benefits as outlined from the data analyses in some recent literatures are reviewed, showing profound implications for the future GNSS development from both technology and application perspectives.
Resumo:
Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.
Resumo:
The birth of a baby is a significant event for women and their families, with the event being influenced by the prevailing social and cultural context. Historically, women throughout the world have given birth at home assisted by other women who helped them cope with the stress of labour and birth. In the middle of the twentieth century, the togetherness, caring and support that were provided within the social and cultural context of childbirth began to change; women in most developed countries, and to some extent in developing countries, laboured and gave birth in institutions that isolated them from the support of family and friends. This practice is referred to as the medical model of childbirth and, over time, birthing within this model has come to be viewed by women as a dehumanising experience. In an attempt to secure a more supportive experience, women began to demand the presence of a supportive companion; namely their partner. This event became the catalyst for a number of studies focusing on different types of support providers and their contribution to the phenomenon of social support during labour. More recently, it has become a common practice for some women to be supported during labour by a number of people from their social network. However, research on the influence of such supportive people on women’s experience of labour and birth and on birth outcomes is scarce. The aim of this study is to examine the influence of various support arrangements from a woman’s family and social network on her experience of labour and birth and on birth outcomes. The mixed-method study was conducted to answer three research questions: 1. Do women with more than one support person present during labour and birth have similar perceptions and experiences of support compared to women with one support person? 2. Do women with more than one support person present during labour and birth have similar birth outcomes compared to women with one support person? 3. Do women with different types of support providers during labour and birth have similar birth outcomes? Methods Phase one of this study developed, pilot tested and administered a newly developed instrument designed to measure women’s perceptions of supportive behaviours provided during labour. Specific birth outcome data were extracted from the medical records. Phase two consisted of in-depth interviews with a sample of women who had completed the survey. Results: The results identified a statistically significant relationship between women’s perceptions of social support and the number of support providers: women supported by one person only rated the supportive behaviours of that person more highly compared to women who were supported by a number of people. The results also identified that women supported by one person used less analgesia. An additional qualitative finding was that some women sacrificed the support of female relatives at the request of their partners. Conclusion: By using a mixed-method approach, this study found that women were selective in their choice of support providers, as they chose individuals with whom they had an enduring affectionate attachment. Women place more emphasis on a support person’s ability to fulfil their attachment needs of close proximity and a sense of security and safety, rather than their ability to provide the expected functional supportive behaviours.
Resumo:
This special issue of Project Management Journal presents a collection of six of the best papers presented at the International Research Network on Organizing by Projects (IRNOP) Conference hosted by the University of Quebec at Montreal (UQAM) in June 2011 in Montréal, Canada. In this editorial, Professor Brian Hobbs, organizer of the IRNOP 2011 Conference and Project Management Chair at UQAM, shares his observations about the current state of project research and identifies trends...
Resumo:
In power hardware in the loop (PHIL) simulations, a real-time simulated power system is interfaced to a piece of hardware, usually called hardware under test (HuT). A PHIL test can be realized using several simulation tools. Among them Real Time Digital Simulator (RTDS) is an ideal tool to perform complex power system simulations in near real-time. Stable operation of the entire system, along with the accuracy of simulation results are the main concerns regarding a PHIL simulation. In this paper, a simulated power network on RTDS will be interfaced to HuT through a voltage source converter (VSC). Issues around stability and other interface problems are studied and a new method to stabilize some unstable PHIL cases is proposed. PHIL simulation results in PSCAD and RSCAD are presented.
Resumo:
The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.
Resumo:
This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how knowledge governance mechanisms can move the organization towards desired knowledge-based goals. A multiple-case study comprising 23 cases advances our understanding of the elements that trigger, enable, hamper, and drive shifting, leveraging and adapting. Finally, the paper offers a tentative framework of dynamic capability building promoting project competence development.