29 resultados para biogas, biometano, upgrading, purificazione

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The people of Bangladesh are underprivileged from continuous grid electricity. Despite the plentiful supply of renewable sources of energy in Bangladesh, currently their contribution to the electricity supply remains inconsequential. Use of renewable energy is considered an indispensable component of sustainable energy systems, as renewable energy resources emit less greenhouse gas emissions compared to other non-renewable energy systems. Out of the various renewable sources, solar and biogas and to a limited extend, wind and hydro-power are effectively used. Though the biogas production was the leading and most appropriate renewable energy resource in our country, it has become notably insignificant due to the lack of appropriate strategies and institutional settings. To address this, this article examines Bangladesh's current energy strategies and institutional settings and investigates future strategies for the advancement of biogas production. This article argues that further significant efforts could be made toward energy sustainability in Bangladesh and the development for a national sustainable energy policy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As fossil fuel prices increase and environmental concerns gain prominence, the development of alternative fuels from biomass has become more important. Biodiesel produced from microalgae is becoming an attractive alternative to share the role of petroleum. Currently it appears that the production of microalgal biodiesel is not economically viable in current environment because it costs more than conventional fuels. Therefore, a new concept is introduced in this article as an option to reduce the total production cost of microalgal biodiesel. The integration of biodiesel production system with methane production via anaerobic digestion is proved in improving the economics and sustainability of overall biodiesel stages. Anaerobic digestion of microalgae produces methane and further be converted to generate electricity. The generated electricity can surrogate the consumption of energy that require in microalgal cultivation, dewatering, extraction and transesterification process. From theoretical calculations, the electricity generated from methane is able to power all of the biodiesel production stages and will substantially reduce the cost of biodiesel production (33% reduction). The carbon emissions of biodiesel production systems are also reduced by approximately 75% when utilizing biogas electricity compared to when the electricity is otherwise purchased from the Victorian grid. The overall findings from this study indicate that the approach of digesting microalgal waste to produce biogas will make the production of biodiesel from algae more viable by reducing the overall cost of production per unit of biodiesel and hence enable biodiesel to be more competitive with existing fuels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hydrothermal liquefaction (HTL) presents a viable route for converting a vast range of materials into liquid fuel, without the need for pre-drying. Currently, HTL studies produce bio-crude with properties that fall short of diesel or biodiesel standards. Upgrading bio-crude improves the physical and chemical properties to produce a fuel corresponding to diesel or biodiesel. Properties such as viscosity, density, heating value, oxygen, nitrogen and sulphur content, and chemical composition can be modified towards meeting fuel standards using strategies such as solvent extraction, distillation, hydrodeoxygenation and catalytic cracking. This article presents a review of the upgrading technologies available, and how they might be used to make HTL bio-crude into a transportation fuel that meets current fuel property standards.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since China’s Economic Reform and its Open Door Policy, China has entered a new era of education (Adamson, 2002; Hu, 2005a). English has gained status as a language for international relations (Graddol, 1997) and international trade (Qu, 2007). Hence, in 2001, China’s Ministry of Education (MOE) required universities to offer 5-10% of their course units in English, particularly in the fields of information technology, biotechnology, finance and law (Jen, 2001; MOE, 2001). However, “the upgrading of national English proficiency, then, is predicted largely on the professional competence of the teaching force” (Hu, 2005b, p. 655). For TEFL academics, one component of this competence is the capacity to conduct research (Day, 1991; Shu, 2002). Indeed, research productivity has become essential for university success, and academics’ employment and promotional prospects. This study aims to investigate 182 Chinese TEFL academics’ research outputs across three Chinese higher education institutions through the research question: What are the research productivity levels of Chinese TEFL academics? A survey instrument was devised to gather TEFL academics’ calculations of research productivity and, in particular, the quality and quantity of research outputs over a five-year period (2004-2008). Descriptive statistics through SPSS were used to analyse data across research output fields (e.g., journal articles, conference papers). Academic status varied (n=182; teaching assistants 23.6%, lecturers 47.3%, associate professors 22.5%, and professors 6.6%) as did years of teaching (1-5 years 27.4%, 6-10 years 24.7%, 11-15 18.1%, 16-20 years 13.7%, > 21 years 15.9%). Results (n=182, male=27%, females=73%) indicated 18% had not produced any research in the five-year period. Indeed, more than 70% had produced no research in all categories except non-core journal articles and provincial projects. An overwhelming majority of TEFL academics had zero productivity in 10 of the 12 categories. Nevertheless, there were highly-productive TEFL academics, who had produced five or more pieces of research across the 12 categories. In addition, there was not much difference between sole and co-authored research outputs, except non-core journal articles where sole authored work was 20% higher than co-authored work. China’s desire for international competitiveness in education will require measures that facilitate higher levels of research productivity. These measures must include professional development, support and mentoring programs, and employment of personnel who can guide these processes. Research performance is an outcome, hence there is a need to understand Chinese TEFL academics’ perceptions about research, and experiences that may hinder and facilitate higher research productivity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

For many organizations, maintaining and upgrading enterprise resource planning (ERP) systems (large packaged application software) is often far more costly than the initial implementation. Systematic planning and knowledge of the fundamental maintenance processes and maintenance-related management data are required in order to effectively and efficiently administer maintenance activities. This paper reports a revelatory case study of Government Services Provider (GSP), a high-performing ERP service provider to government agencies in Australia. GSP ERP maintenance-process and maintenance-data standards are compared with the IEEE/EIA 12207 software engineering standard for custom software, also drawing upon published research, to identify how practices in the ERP context diverge from the IEEE standard. While the results show that many best practices reflected in the IEEE standard have broad relevance to software generally, divergent practices in the ERP context necessitate a shift in management focus, additional responsibilities, and different maintenance decision criteria. Study findings may provide useful guidance to practitioners, as well as input to the IEEE and other related standards.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the last few years more stringent environmental laws (e.g. the German “Energie¬ein-sparverordnung ENEV” - Energy Performance of Buildings Directive) and soaring energy prices has increased the need for the real estate industry to react and participate in overall energy reduction through efficient house construction and design, as well as upgrading the existing housing stock to be more energy efficient. Therefore the Property Economics Group at Queensland University of Technology in Australia and Nuertingen-Geislingen University in Germany are carrying out research in relation to sustainable housing construction and public awareness of “green” residential property. Part of this research is to gain an understanding of the level of knowledge and importance of these issues to the house buyer and to determine the importance of sustainable housing to the general public. The paper compares data from two different empirical studies; one of studies analyzes the situation in New Zealand, the other is focused on Germany.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

President’s Message Hello fellow AITPM members, Due to three colliding forces of nature I find myself writing this month’s message from home – today, I am still getting over a persistent virus that seemed to set in just after returning from Singapore a couple of weeks ago, which my diabetes won’t let me get away with too easily (no Kermit the Frog swine flu jokes please). Combine this with a very wet day in Brisbane – in fact the wettest for 20 years (how can we complain, except for flash flooding?). And in Queensland today is a state school teachers’ strike, so one half of our brood is over watching TV. Family snapshots aside, the biggest news for our industry of late is the $8.5 billion announced in the Federal Budget for transport infrastructure projects; many “shovel ready”, but some – and fortunate for our profession – desktop ready. This newsletter provides nationwide coverage on the transport infrastructure aspects of the Federal Budget. We’ll need a bit more time to carefully look at the ensuing State Budgets’ announcements. Regarding the federal budget announcements, I am pleased to see serious attention being paid to upgrading the M1 system – I hope to see a motorway standard facility connecting Adelaide to at least Rockhampton in my lifetime. But some other important roads are of course missing out in this particular budget. Various levels of commitment are being made to urban passenger rail – some project significant while others planning significant. Enhancement of suburban rail is important across the capitals and Australia’s medium sized cities such as the Gold Coast and Newcastle. Not much on road safety initiatives jumped out at me, but I believe it is implied in the large road projects and in some of the detail elsewhere. I do believe it’s about time a ‘Vision Zero’ style policy is adopted at the National level, since any death is unacceptable on the road, just as it is in any other workplace. So, overall some good news on building transport infrastructure to keep the economy purring during this recession, and strongly supporting it during future boom times. The other edge to the sword, of course, is that we tax payers will be paying a considerable amount for borrowings for these projects over a long period of time. I close again in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report focuses on risk-assessment practices in the private rental market, with particular consideration of their impact on low-income renters. It is based on the fieldwork undertaken in the second stage of the research process that followed completion of the Positioning Paper. The key research question this study addressed was: What are the various factors included in ‘risk-assessments’ by real estate agents in allocating ‘affordable’ tenancies? How are these risks quantified and managed? What are the key outcomes of their decision-making? The study builds on previous research demonstrating that a relatively large proportion of low-cost private rental accommodation is occupied by moderate- to high-income households (Wulff and Yates 2001; Seelig 2001; Yates et al. 2004). This is occurring in an environment where the private rental sector is now the de facto main provider of rental housing for lower-income households across Australia (Seelig et al. 2005) and where a number of factors are implicated in patterns of ‘income–rent mismatching’. These include ongoing shifts in public housing assistance; issues concerning eligibility for rent assistance; ‘supply’ factors, such as loss of low-cost rental stock through upgrading and/or transfer to owner-occupied housing; patterns of supply and demand driven largely by middle- to high-income owner-investors and renters; and patterns of housing need among low-income households for whom affordable housing is not appropriate. In formulating a way of approaching the analysis of ‘risk-assessment’ in rental housing management, this study has applied three sociological perspectives on risk: Beck’s (1992) formulation of risk society as entailing processes of ‘individualisation’; a socio-cultural perspective which emphasises the situated nature of perceptions of risk; and a perspective which has drawn attention to different modes of institutional governance of subjects, as ‘carriers of specific indicators of risk’. The private rental market was viewed as a social institution, and the research strategy was informed by ‘institutional ethnography’ as a method of enquiry. The study was based on interviews with property managers, real estate industry representatives, tenant advocates and community housing providers. The primary focus of inquiry was on ‘the moment of allocation’. Six local areas across metropolitan and regional Queensland, New South Wales, and South Australia were selected as case study localities. In terms of the main findings, it is evident that access to private rental housing is not just a matter of ‘supply and demand’. It is also about assessment of risk among applicants. Risk – perceived or actual – is thus a critical factor in deciding who gets housed, and how. Risk and its assessment matter in the context of housing provision and in the development of policy responses. The outcomes from this study also highlight a number of salient points: 1.There are two principal forms of risk associated with property management: financial risk and risk of litigation. 2. Certain tenant characteristics and/or circumstances – ability to pay and ability to care for the rented property – are the main factors focused on in assessing risk among applicants for rental housing. Signals of either ‘(in)ability to pay’ and/or ‘(in)ability to care for the property’ are almost always interpreted as markers of high levels of risk. 3. The processing of tenancy applications entails a complex and variable mix of formal and informal strategies of risk-assessment and allocation where sorting (out), ranking, discriminating and handing over characterise the process. 4. In the eyes of property managers, ‘suitable’ tenants can be conceptualised as those who are resourceful, reputable, competent, strategic and presentable. 5. Property managers clearly articulated concern about risks entailed in a number of characteristics or situations. Being on a low income was the principal and overarching factor which agents considered. Others included: - unemployment - ‘big’ families; sole parent families - domestic violence - marital breakdown - shift from home ownership to private rental - Aboriginality and specific ethnicities - physical incapacity - aspects of ‘presentation’. The financial vulnerability of applicants in these groups can be invoked, alongside expressed concerns about compromised capacities to manage income and/or ‘care for’ the property, as legitimate grounds for rejection or a lower ranking. 6. At the level of face-to-face interaction between the property manager and applicants, more intuitive assessments of risk based upon past experience or ‘gut feelings’ come into play. These judgements are interwoven with more systematic procedures of tenant selection. The findings suggest that considerable ‘risk’ is associated with low-income status, either directly or insofar as it is associated with other forms of perceived risk, and that such risks are likely to impede access to the professionally managed private rental market. Detailed analysis suggests that opportunities for access to housing by low-income householders also arise where, for example: - the ‘local experience’ of an agency and/or property manager works in favour of particular applicants - applicants can demonstrate available social support and financial guarantors - an applicant’s preference or need for longer-term rental is seen to provide a level of financial security for the landlord - applicants are prepared to agree to specific, more stringent conditions for inspection of properties and review of contracts - the particular circumstances and motivations of landlords lead them to consider a wider range of applicants - In particular circumstances, property managers are prepared to give special consideration to applicants who appear worthy, albeit ‘risky’. The strategic actions of demonstrating and documenting on the part of vulnerable (low-income) tenant applicants can improve their chances of being perceived as resourceful, capable and ‘savvy’. Such actions are significant because they help to persuade property managers not only that the applicant may have sufficient resources (personal and material) but that they accept that the onus is on themselves to show they are reputable, and that they have valued ‘competencies’ and understand ‘how the system works’. The parameters of the market do shape the processes of risk-assessment and, ultimately, the strategic relation of power between property manager and the tenant applicant. Low vacancy rates and limited supply of lower-cost rental stock, in all areas, mean that there are many more tenant applicants than available properties, creating a highly competitive environment for applicants. The fundamental problem of supply is an aspect of the market that severely limits the chances of access to appropriate and affordable housing for low-income rental housing applicants. There is recognition of the impact of this problem of supply. The study indicates three main directions for future focus in policy and program development: providing appropriate supports to tenants to access and sustain private rental housing, addressing issues of discrimination and privacy arising in the processes of selecting suitable tenants, and addressing problems of supply.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, the train scheduling problem is modelled as a blocking parallel-machine job shop scheduling (BPMJSS) problem. In the model, trains, single-track sections and multiple-track sections, respectively, are synonymous with jobs, single machines and parallel machines, and an operation is regarded as the movement/traversal of a train across a section. Due to the lack of buffer space, the real-life case should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold the train until next section on the routing becomes available. Based on literature review and our analysis, it is very hard to find a feasible complete schedule directly for BPMJSS problems. Firstly, a parallel-machine job-shop-scheduling (PMJSS) problem is solved by an improved shifting bottleneck procedure (SBP) algorithm without considering blocking conditions. Inspired by the proposed SBP algorithm, feasibility satisfaction procedure (FSP) algorithm is developed to solve and analyse the BPMJSS problem, by an alternative graph model that is an extension of the classical disjunctive graph models. The proposed algorithms have been implemented and validated using real-world data from Queensland Rail. Sensitivity analysis has been applied by considering train length, upgrading track sections, increasing train speed and changing bottleneck sections. The outcomes show that the proposed methodology would be a very useful tool for the real-life train scheduling problems

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the past decade there have been a large number of significant innovations in manufacturing which have resulted in more flexible and cost efficient methods and higher quality products, as manufacturers have set about upgrading their processes, systems and performance. This study compares the use of technologies and improvement programs between OECD and Non-OECD countries, and also between small and large firms, and examines differences in the use and outcomes across the economies and different sized firms. The empirical analysis provides an opportunity to test whether the ‘capabilities’ or strengths of a firm can be linked to these activities and examines if developing economies are using technology or management programs such as quality management and business process re-engineering to catch up to manufacturers in developed economies. The analysis utilises data from the second International Manufacturing Strategy Survey (IMSS), which encompasses 703 firms in 23 countries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, a comprehensive planning methodology is proposed that can minimize the line loss, maximize the reliability and improve the voltage profile in a distribution network. The injected active and reactive power of Distributed Generators (DG) and the installed capacitor sizes at different buses and for different load levels are optimally controlled. The tap setting of HV/MV transformer along with the line and transformer upgrading is also included in the objective function. A hybrid optimization method, called Hybrid Discrete Particle Swarm Optimization (HDPSO), is introduced to solve this nonlinear and discrete optimization problem. The proposed HDPSO approach is a developed version of DPSO in which the diversity of the optimizing variables is increased using the genetic algorithm operators to avoid trapping in local minima. The objective function is composed of the investment cost of DGs, capacitors, distribution lines and HV/MV transformer, the line loss, and the reliability. All of these elements are converted into genuine dollars. Given this, a single-objective optimization method is sufficient. The bus voltage and the line current as constraints are satisfied during the optimization procedure. The IEEE 18-bus test system is modified and employed to evaluate the proposed algorithm. The results illustrate the unavoidable need for optimal control on the DG active and reactive power and capacitors in distribution networks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Preservation and enhancement of transportation infrastructure is critical to continuous economic development in Australia. Of particular importance are the road assets infrastructure, due to their high costs of setting up and their social and economic impact on the national economy. Continuous availability of road assets, however, is contingent upon their effective design, condition monitoring, maintenance, and renovation and upgrading. However, in order to achieve this data exchange, integration, and interoperability is required across municipal boundaries. On the other hand, there are no agreed reference frameworks that consistently describe road infrastructure assets. As a consequence, specifications and technical solutions being chosen to manage road assets do not provide adequate detail and quality of information to support asset lifecycle management processes and decisions taken are based on perception not reality. This paper presents a road asset information model, which works as reference framework to, link other kinds of information with asset information; integrate different data suppliers; and provide a foundation for service driven integrated information framework for community infrastructure and asset management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Biomass and non-food crop residues are seen as relatively low cost and abundant renewable sources capable of making a large contribution to the world’s future energy and chemicals supply. Signifi cant quantities of ethanol are currently produced from biomass via biochemical processes, but thermochemical conversion processes offer greater potential to utilize the entire biomass source to produce a range of products. This chapter will review thermochemical gasifi cation and pyrolysis methods with a focus on hydrothermal liquefaction processes. Hydrothermal liquefaction is the most energetically advantageous thermochemical biomass conversion process. If the target is to produce sustainable liquid fuels and chemicals and reduce the impact of global warming as a result of carbon dioxide, nitrous oxide, and methane emissions (i.e., protect the natural environment), the use of “green” solvents, biocatalysts and heterogeneous catalysts must be the main R&D initiatives. As the biocrude produced from hydrothermal liquefaction is a complex mixture which is relatively viscous, corrosive, and unstable to oxidation (due to the presence of water and oxygenated compounds), additional upgrading processes are required to produce suitable biofuels and chemicals.