72 resultados para a price spike

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents a demand side response model (DSR) which assists small electricity consumers, through an aggregator, exposed to the market price to proactively mitigate price and peak impact on the electrical system. The proposed model allows consumers to manage air-conditioning when as a function of possible price spikes. The main contribution of this research is to demonstrate how consumers can minimise the total expected cost by optimising air-conditioning to account for occurrences of a price spike in the electricity market. This model investigates how pre-cooling method can be used to minimise energy costs when there is a substantial risk of an electricity price spike. The model was tested with Queensland electricity market data from the Australian Energy Market Operator and Brisbane temperature data from the Bureau of Statistics during hot days on weekdays in the period 2011 to 2012.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The aim of this work is to develop a demand-side-response model, which assists electricity consumers exposed to the market price to independently and proactively manage air-conditioning peak electricity demand. The main contribution of this research is to show how consumers can optimize the energy cost caused by the air conditioning load considering to several cases e.g. normal price, spike price, and the probability of a price spike case. This model also investigated how air-conditioning applies a pre-cooling method when there is a substantial risk of a price spike. The results indicate the potential of the scheme to achieve financial benefits for consumers and target the best economic performance for electrical generation distribution and transmission. The model was tested with Queensland electricity market data from the Australian Energy Market Operator and Brisbane temperature data from the Bureau of Statistics regarding hot days from 2011 to 2012.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aims of this project is to develop demand side response model which assists electricity consumers who are exposed to the market price through aggregator to manage the air-conditioning peak electricity demand. The main contribution of this research is to show how consumers can optimise the energy cost caused by the air-conditioning load considering the electricity market price and network overload. The model is tested with selected characteristics of the room, Queensland electricity market data from Australian Energy Market Operator and data from the Bureau of Statistics on temperatures in Brisbane, during weekdays on hot days from 2011 - 2012.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abnormally high price spikes in spot electricity markets represent a significant risk to market participants. As such, a literature has developed that focuses on forecasting the probability of such spike events, moving beyond simply forecasting the level of price. Many univariate time series models have been proposed to dealwith spikes within an individual market region. This paper is the first to develop a multivariate self-exciting point process model for dealing with price spikes across connected regions in the Australian National Electricity Market. The importance of the physical infrastructure connecting the regions on the transmission of spikes is examined. It is found that spikes are transmitted between the regions, and the size of spikes is influenced by the available transmission capacity. It is also found that improved risk estimates are obtained when inter-regional linkages are taken into account.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an Active Gate Signaling scheme to reduce voltage/current spikes across insulated gate power switches in hard switching power electronic circuits. Voltage and/or current spikes may cause EMI noise. In addition, they increase voltage/current stress on the switch. Traditionally, a higher gate resistance is chosen to reduce voltage/current spikes. Since the switching loss will increase remarkably, an active gate voltage control scheme is developed to improve efficiency of hard switching circuits while the undesirable voltage and/or current spikes are minimized.