18 resultados para Wetland Restoration

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rodman Reservoir, an impoundment on the Ocklawaha River in north central Florida, is a last remnant of the Cross-Florida Barge Canal (CFBC). The canal, conceived in the 1820's, was designed by the U.S. Army Corps of Engineers (USACE) to shorten shipping lanes between the Fulf ports and the Atlantic coast. Opposition to CFBC by Florida's young environmental movement led to a half in construction of the CFBC in 1971, but decommissioning of the already-constructed Rodman dam and the reservoir behind it has been mired in controversy every since.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2010 LAGI competition was held on three underutilized sites in the United Arab Emirates. By choosing Staten Island, New York in 2012 the competition organises have again brought into question new roles for public open space in the contemporary city. In the case of the UEA sites, the competition produced many entries which aimed to create a sculpture and by doing so, they attracted people to the selected empty spaces in an arid climate. In a way these proposals were the incubators and the new characters of these empty spaces. The competition was thus successful at advancing understandings of the expanded role of public open spaces in EAU and elsewhere. LAGI 2012 differs significantly to the UAE program because Fresh Kills Park has already been planned as a public open space for New Yorkers - with or without these clean energy sculptures. Furthermore, Fresh Kills Park is already an (gas) energy generating site in its own right. We believe Fresh Kills Park, as a site, presents a problem which somewhat transcends the aims of the competition brief. Advancing a sustainable urban design proposition for the site therefore requires a fundamental reconsideration of the established paradigms public open space. Hence our strategy is to not only create an energy generating, site specific art work, but to create synergy between the public and the site engagement while at the same time complement the idiosyncrasies of the pre-existing engineered landscape. Current PhD research about energy generation in public open spaces informs this work.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We used in vivo (biological), in silico (computational structure prediction), and in vitro (model sequence folding) analyses of single-stranded DNA sequences to show that nucleic acid folding conservation is the selective principle behind a high-frequency single-nucleotide reversion observed in a three-nucleotide mutated motif of the Maize streak virus replication associated protein (Rep) gene. In silico and in vitro studies showed that the three-nucleotide mutation adversely affected Rep nucleic acid folding, and that the single-nucleotide reversion [C(601)A] restored wild-type-like folding. In vivo support came from infecting maize with mutant viruses: those with Rep genes containing nucleotide changes predicted to restore a wild-type-like fold [A(601)/G(601)] preferentially accumulated over those predicted to fold differently [C(601)/T(601)], which frequently reverted to A(601) and displaced the original population. We propose that the selection of native nucleic acid folding is an epigenetic effect, which might have broad implications in the evolution of plants and their viruses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Performance of a constructed wetland is commonly reported as variable due to the site specific nature of influential factors. This paper discusses outcomes from an in-depth study which characterised treatment performance of a wetland based on the variation in runoff regime. The study included a comprehensive field monitoring of a well established constructed wetland in Gold Coast, Australia. Samples collected at the inlet and outlet was tested for Total Suspended Solids (TSS), Total Nitrogen (TN) and Total Phosphorus (TP). Pollutant concentrations in the outflow were found to be consistent irrespective of the variation in inflow water quality. The analysis revealed two different treatment characteristics for events with different rainfall depths. TSS and TN load reduction is strongly influenced by hydraulic retention time where performance is higher for rainfall events below the design event. For small events, treatment performance is higher at the beginning of the event and gradually decreased during the course of the event. For large events, the treatment performance is comparatively poor at the beginning and improved during the course of the event. The analysis also confirmed the variable treatment trends for different pollutant types.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Restoring a large-scale power system has always been a complicated and important issue. A lot of research work has been done on different aspects of the whole power system restoration procedure. However, more time will be required to complete the power system restoration process in an actual situation if accurate and real-time system data cannot be obtained. With the development of the wide area monitoring system (WAMS), power system operators are capable of accessing to more accurate data in the restoration stage after a major outage. The ultimate goal of the system restoration is to restore as much load as possible while in the shortest period of time after a blackout, and the restorable load can be estimated by employing WAMS. Moreover, discrete restorable loads are employed considering the limited number of circuit-breaker operations and the practical topology of distribution systems. In this work, a restorable load estimation method is proposed employing WAMS data after the network frame has been reenergized, and WAMS is also employed to monitor the system parameters in case the newly recovered system becomes unstable again. The proposed method has been validated with the New England 39-Bus system and an actual power system in Guangzhou, China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Restoring old buildings to conform the current building policies and standards is a great challenge to engineers and architects. The restoration of the Brisbane City Hall, a heritage building listed by the State of Queensland in Australia, developed an innovative approach to upgrade the building using the method called ‘concrete overlay’ following the guidelines of both the International Council on Monuments and Sites and the Burra Charter of Australia. Concrete overlay is a new method of structural strengthening by drilling new reinforcement and placing new concrete on top of the existing structure, akin to a bone transplant or bone grafting in the case of a human being. This method is popularly used for newer bridges which have suffered load stresses. However, this method had never been used on any heritage buildings which were built on different conditions and standards. The compatibility of this method is currently being monitored. Most of the modern historic buildings are rapidly deteriorating and require immediate interventions in order to be saved. As most of these heritage buildings are on the stage of advanced deterioration, significant attempts are being made and several innovations are being applied to upgrade these structures to conform with the current building requirements. To date, the knowledge and literature in regarding ‘concrete cancer’ in relation to rehabilitating these reinforced concrete heritage structures is significantly lacking. It is hoped that the method of concrete overlay and the case study of Brisbane City Hall restoration will contribute to the development of restoration techniques and policies for Modern Heritage Buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project contributed to the in-depth understanding of the influence of hydrologic and hydraulic factors on the stormwater treatment performance of constructed wetlands and bioretention basins in the "real world". The project was based on the comprehensive monitoring of a Water Sensitive Urban Design treatment train in the field and underpinned by complex multivariate statistical analysis. The project outcomes revealed that the reduction in pollutant concentrations were consistent in the constructed wetland, but was highly variable in the bioretention basin to a range of influential factors. However, due to the significant amount retention within the filter media, all pollutant loadings were reduced in the bioretention basin.