686 resultados para Training project

em Queensland University of Technology - ePrints Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In 1993 the Australian Broadcasting Corporation was contracted by the Australian Government to assist in the reshaping of the South African Broadcasting Corporation from a state-run broadcaster to a respected and trusted national broadcaster for all people in the newly democratic South Africa. Broadcast journalism training was identified by ABC consultant Bob Wurth as possibly the greatest need for SABC Radio. This thesis examines the ABC's role in South Africa and the effectiveness of its radio journalism training project considering the organisational, structural, cultural and political constraints of the SABC. This thesis will show through interviews and participant observation the difficulties in achieving the production of Western Liberal journalism values at the SABC within the time constraints set by the project funded by the Australian Government and the particular South African morays.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste have negative impacts on the environment. As a significant proportion of C&D waste is related to the design stage of a project, there is an opportunity for architects to reduce the waste. However, research suggests that many architects often do not understand the impact of their design on waste generation. Training and education are proposed by current researchers to improve architects’ knowledge; however, this has not been adequately validated as a viable approach to solving waste issues. This research investigates architects’ perceptions towards waste management in the design phase, and determines whether they feel they are adequately skilled in reducing C&D waste. Questionnaire surveys were distributed to architects from 98 architectural firms and 25 completed surveys were returned. The results show that while architects are aware of the relationship between design and waste, ‘extra time’ and ‘lack of knowledge’ are the key barriers to implementing waste reduction strategies. In addition, the majority of respondents acknowledge their lack of skill to reduce waste through design evaluation. Therefore, training programmes can be a viable strategy to enable them to address the pressing issue of C&D waste reduction.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Motorcycle trauma is a serious road safety issue in Queensland and throughout Australia. In 2009, Queensland Transport (later Transport and Main Roads or TMR) appointed CARRS-Q to provide a three-year program of Road Safety Research Services for Motorcycle Rider Safety. Funding for this research originated from the Motor Accident Insurance Commission. This program of research was undertaken to produce knowledge to assist TMR to improve motorcycle safety by further strengthening the licensing and training system to make learner riders safer by developing a pre-learner package (Deliverable 1), and by evaluating the QRide CAP program to ensure that it is maximally effective and contributes to the best possible training for new riders (Deliverable 2). The focus of this report is Deliverable 3 of the overall program of research. It identifies potential new licensing components that will reduce the incidence of risky riding and improve higher-order cognitive skills in new riders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Practice placement education has been recognised as an integral and critical component of the training of occupational therapy students. Although there is an extensive body of literature on clinical education and traditional practice placement education models, there has been limited research on alternative placements.-------- This paper reviews the literature on various practice placement education models and presents a contemporary view on how it is currently delivered. The literature is examined with a particular focus on the increasing range of practice placement education opportunities, such as project and role-emerging placements. The drivers for non-traditional practice placement education include shortages of traditional placement options, health reform and changing work practices, potential for role development and influence on practice choice. The benefits and challenges of non-traditional practice placement education are discussed, including supervision issues, student evaluation, professional and personal development and the opportunity to practise clinical skills.--------- Further research is recommended to investigate occupational therapy graduates' perceptions of role-emerging and project placements in order to identify the benefits or otherwise of these placements and to contribute to the limited body of knowledge of emerging education opportunities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper explores the efficacy of public agencies using their contracting relationships with private firms to affect training outcomes in the construction industry. It develops a theoretical perspective on this issue by extending a framework that was originally developed by Hart, Schleifer and Vishny (1997) to study privatisation. This paper shows how their framework can also be applied to situations where the provision of public works is already privatised and the government is attempting to regulate training outcomes via a contracting arrangement. An empirical study of two training policies of the Western Australian government complements this theoretical discussion. We report the results of an analysis of data drawn from the government’s Tender Registration System between 1997 & 2006. As such we use a unique and comprehensive resource to examine the possible effects of new training policies on an important segment of the construction ‘market’.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explores the likely efficacy of government agencies using their contracting relationships with private firms to affect training outcomes in the construction industry. Specifically, it reports on the results of a study of two training policies of theWestern Australian government. Empirical data is drawn from the government’s Tender Registration System between 1997 and 2006. The main finding of the quantitative analysis is that in the absence of strong industry commitment to policy objectives, the contracting approach is likely to result in high levels of avoidance activity and generate very few benefits. The results of a qualitative investigation also support these findings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper seeks to continue the debate about the need for professionals in the library and information services (LIS) sector to continually engage in career-long learning to sustain and develop their knowledge and skills in a dynamic industry. Aims: The neXus2 workforce study has been funded by the ALIA and the consortium of National and State Libraries Australasia (NSLA). It builds on earlier research work (the neXus census) that looked at the demographic, educational and career perspectives of individual library and information professions, to critically examine institutional policies and practices associated with the LIS workforce. The research aims to develop a clearer understanding of the issues impacting on workforce sustainability, workforce capability and workforce optimisation. Methods: The research methodology involved an extensive online survey conducted in March 2008 which collected data on organisational and general staffing; recruitment and retention; staff development and continuing professional education; and succession planning. Encouragement to participate was provided by key industry groups, including academic, public, health, law and government library and information agencies, with the result that around 150 institutions completed the questionnaire. Results: The paper will specifically discuss the research findings relating to training and professional development, to measure the scope and distribution of training activities across the workforce, to consider the interrelationship between the strategic and operational dimensions of staff development in individual institutions and to analyse the common and distinctive factors evident in the different sectors of the profession. Conclusion: The neXus2 project has successfully engaged LIS institutions in the collection of complex industry data that is relevant to the future education and workforce strategies for all areas of the profession. Cross-sector forums such as Information Online 2009 offer the opportunity for stimulating professional dialogue on the key issues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Exercise for Health program is a telephone-delivered exercise intervention for women with breast cancer (BC) living in regional Queensland. The effect of the program is being evaluated in the context of a randomised controlled trial. Consenting, newly diagnosed BC patients, treated in one of 8 regional Queensland hospitals, were randomly allocated to telephone-based exercise counselling (EC) or usual care (UC) at 6-weeks post-surgery. EC participants received an exercise workbook and 16 calls from an exercise physiologist over 8 months. Physical activity levels (PA) (Active Australia & CHAMPS), quality-of-life (FACTB+4), upper-body function (DASH) and fatigue (FACIT-Fatigue) were assessed at baseline (4-6 weeks post-surgery), 6- and 12-months post-surgery. Preliminary analyses of available 6-month data were conducted using t-tests and repeated measures ANCOVAs. Participating women (n=143; EC n=73, UC n=70) were aged 53±9 years and 30% met PA guidelines at baseline. Up to two thirds of the women received adjuvant therapy during the first 6 months following surgery. Greater improvements (mean change+SD) occurred for the EC vs UC group in weekly sessions of walking (1.83±4.3 vs -0.5±5.5, p=0.029) moderate-vigorous PA (5.0±6.5 vs -1.1±6.1, p=0.005) and strength training (1.9±2.9 vs -0.5±4.2 p<0.001), and in upper-body function, reflected by lower log-transformed disability scores (-0.34±0.44 vs -0.17±0.28, p=0.038). More EC than UC participants met PA guidelines at 6 months (46.3% vs 32.7%). Preliminary findings from this ongoing trial suggest that the telephone is a feasible and effective medium for delivering exercise counselling to newly diagnosed BC patients living in regional areas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses the challenges of transfer of training back to the workplace for programme and project managers who are being groomed for the leadership of large and complex projects. The paper draws on the experience of the development and delivery of Queensland University of Technology (QUT) education programs: an Executive Masters of Complex Project Management and a series of Continuing Professional Development (CPD) events for an Australian government agency, Defence Materiel Organisation (DMO). Drawing on notions of ‘far transfer’ (Laker 1990; Noe, 1986) and ‘transfer climate’ (Kozlowski & Salas, 1993; Yamnill & McLean, 2001), the paper describes the steps undertaken to achieve a design that ensures that programme and project leadership skills developed through these corporate education programs become successfully embedded back in the organisation. Further, the paper reports on a small qualitative study where the programme success was evaluated by the organisational sponsor, senior leaders and program participants. Nine interviews were conducted and analysed to identify the success of far transfer and transfer climate four months after the return of program participants from cohort 1 2008 to the workplace.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A research study was conducted in a key area of project management: stakeholder and relationship management through communication - ‘the soft skills’. It was conducted with Diploma of Project Management graduates from one Australian Registered Training Organisation (RTO), the Australian College of Project Management (ACPM). The study was designed to initially identify the qualifications and project management experience of the participants. Further, it identified the respondents’ understanding of and attitude to commonly held principles and literature within the project management field as it relates to the soft skills of projects. This is specifically connected to their project experience and knowledge, approach to project communications, and the stakeholder’s needs. Some of the literature showed that through the management and application of the project soft skills by project managers may actually be a recipe for project success. Hence, an important underpinning of this study was that the project manager can enhance project success (or reduce the impact of failure) by identifying and prioritising stakeholders, developing and implementing strategies for engaging and communicating with them. The use of a positivist approach to this research study allowed for the evaluation and understanding of respondents to the emergent theories of successful projects being delivered through the management of stakeholders, communications, and relationships. Consequently, a quantitative approach to this study was undertaken. The participants were drawn from graduates who completed (graduated) from the ACPM with the Diploma of Project Management between January 2004 and December 2007 only. A list of graduates was collated from this period indicating that a total of 656 graduates have completed and graduated with the qualification. The data collection for this study was done in one phase only. The questionnaire was emailed individually by the researcher directly to the selected potential respondents. Subsequently, a total of 44 responses were received, providing an overall response rate of 43%. Two key factors emerged from the survey questionnaire. Firstly, the need for the soft skills to be incorporated in project management curriculum and education programs, and secondly, that successful projects are delivered through the management and application of the project soft skills. It is expected that the findings of this study be provided across various forums (such as vocational education and training, and project management conferences) and via project management bodies such as the Australian Institute of Project Management (AIPM) to inform learning and provide greater insight into the soft skills of project management. It is the contention of the researcher that this quantitative study of Diploma of Project Management graduates’ views and attitudes highlights the importance of project soft skills and its importance in the delivery of successful projects as well as being part of the competencies of a successful project manager. This study also revealed the value of project experience and knowledge as it pertains to the management and application of the project soft skills.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project examines the application of the Suzuki Actor Training Method (the Suzuki Method) within the work ofTadashi Suzuki's company in Japan, the Shizuoka Performing Arts Complex (SPAC), within the work of Brisbane theatre company Frank:Austral Asian Performance Ensemble (Frank:AAPE), and as related to the development of the theatre performance Surfacing. These three theatrical contexts have been studied from the viewpoint of a "participant- observer". The researcher has trained in the Suzuki Method with Frank:AAPE and SP AC, performed with Frank:AAPE, and was the solo performer and collaborative developer in the performance Surfacing (directed by Leah Mercer). Observations of these three groups are based on a phenomenological definition of the "integrated actor", an actor who is able to achieve a totality or unity between the body and the mind, and between the body and the voice, through a powerful sense of intention. The term "integrated actor" has been informed by the philosophy of Merleau-Ponty and his concept of the "lived body". Three main hypotheses are presented in this study: that the Suzuki Method focuses on actors learning through their body; that the Suzuki Method presents an holistic approach to the body and the voice; and that the Suzuki Method develops actors with a strong sense of intention. These three aspects of the Suzuki Method are explored in relation to the stylistic features of the work of SPAC, Frank:AAPE and the performance Surfacing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance.