85 resultados para Supply chain performance
em Queensland University of Technology - ePrints Archive
Resumo:
A fundamental principle of the resource-based (RBV) of the firm is that the basis for a competitive advantage lies primarily in the application of bundles of valuable strategic capabilities and resources at a firm’s or supply chain’s disposal. These capabilities enact research activities and outputs produced by industry funded R&D bodies. Such industry lead innovations are seen as strategic industry resources, because effective utilization of industry innovation capacity by sectors such as the Australian beef industry are critical, if productivity levels are to increase. Academics and practitioners often maintain that dynamic supply chains and innovation capacity are the mechanisms most likely to deliver performance improvements in national industries.. Yet many industries are still failing to capitalise on these strategic resources. In this research, we draw on the resource-based view (RBV) and embryonic research into strategic supply chain capabilities. We investigate how two strategic supply chain capabilities (supply chain performance differential capability and supply chain dynamic capability) influence industry-led innovation capacity utilization and provide superior performance enhancements to the supply chain. In addition, we examine the influence of size of the supply chain operative as a control variable. Results indicate that both small and large supply chain operatives in this industry believe these strategic capabilities influence and function as second-order latent variables of this strategic supply chain resource. Additionally respondents acknowledge size does impacts both the amount of influence these strategic capabilities have and the level of performance enhancement expected by supply chain operatives from utilizing industry-led innovation capacity. Results however also indicate contradiction in this industry and in relation to existing literature when it comes to utilizing such e-resources.
Resumo:
Increasing global competitiveness worldwide has forced manufacturing organizations to produce high-quality products more quickly and at a competitive cost which demand of continuous improvements techniques. In this paper, we propose a fuzzy based performance evaluation method for lean supply chain. To understand the overall performance of cost competitive supply chain, we investigate the alignment of market strategy and position of the supply chain. Competitive strategies can be achieved by using a different weight calculation for different supply chain situations. By identifying optimal performance metrics and applying performance evaluation methods, managers can predict the overall supply chain performance under lean strategy.
Resumo:
Increasing global competitiveness worldwide has forced manufacturing organizations to produce high-quality products more quickly and at a competitive cost. In order to reach these goals, they need good quality components from suppliers at optimum price and lead time. This actually forced all the companies to adapt different improvement practices such as lean manufacturing, Just in Time (JIT) and effective supply chain management. Applying new improvement techniques and tools cause higher establishment costs and more Information Delay (ID). On the contrary, these new techniques may reduce the risk of stock outs and affect supply chain flexibility to give a better overall performance. But industry people are unable to measure the overall affects of those improvement techniques with a standard evaluation model .So an effective overall supply chain performance evaluation model is essential for suppliers as well as manufacturers to assess their companies under different supply chain strategies. However, literature on lean supply chain performance evaluation is comparatively limited. Moreover, most of the models assumed random values for performance variables. The purpose of this paper is to propose an effective supply chain performance evaluation model using triangular linguistic fuzzy numbers and to recommend optimum ranges for performance variables for lean implementation. The model initially considers all the supply chain performance criteria (input, output and flexibility), converts the values to triangular linguistic fuzzy numbers and evaluates overall supply chain performance under different situations. Results show that with the proposed performance measurement model, improvement area for each variable can be accurately identified.
Resumo:
Increasing global competition, rapid technological changes, advances in manufacturing and information technology and discerning customers are forcing supply chains to adopt improvement practices that enable them to deliver high quality products at a lower cost and in a shorter period of time. A lean initiative is one of the most effective approaches toward achieving this goal. In the lean improvement process, it is critical to measure current and desired performance level in order to clearly evaluate the lean implementation efforts. Many attempts have tried to measure supply chain performance incorporating both quantitative and qualitative measures but failed to provide an effective method of measuring improvements in performances for dynamic lean supply chain situations. Therefore, the necessity of appropriate measurement of lean supply chain performance has become imperative. There are many lean tools available for supply chains; however, effectiveness of a lean tool depends on the type of the product and supply chain. One tool may be highly effective for a supply chain involved in high volume products but may not be effective for low volume products. There is currently no systematic methodology available for selecting appropriate lean strategies based on the type of supply chain and market strategy This thesis develops an effective method to measure the performance of supply chain consisting of both quantitative and qualitative metrics and investigates the effects of product types and lean tool selection on the supply chain performance Supply chain performance matrices and the effects of various lean tools over performance metrics mentioned in the SCOR framework have been investigated. A lean supply chain model based on the SCOR metric framework is then developed where non- lean and lean as well as quantitative and qualitative metrics are incorporated in appropriate metrics. The values of appropriate metrics are converted into triangular fuzzy numbers using similarity rules and heuristic methods. Data have been collected from an apparel manufacturing company for multiple supply chain products and then a fuzzy based method is applied to measure the performance improvements in supply chains. Using the fuzzy TOPSIS method, which chooses an optimum alternative to maximise similarities with positive ideal solutions and to minimise similarities with negative ideal solutions, the performances of lean and non- lean supply chain situations for three different apparel products have been evaluated. To address the research questions related to effective performance evaluation method and the effects of lean tools over different types of supply chains; a conceptual framework and two hypotheses are investigated. Empirical results show that implementation of lean tools have significant effects over performance improvements in terms of time, quality and flexibility. Fuzzy TOPSIS based method developed is able to integrate multiple supply chain matrices onto a single performance measure while lean supply chain model incorporates qualitative and quantitative metrics. It can therefore effectively measure the improvements for supply chain after implementing lean tools. It is demonstrated that product types involved in the supply chain and ability to select right lean tools have significant effect on lean supply chain performance. Future study can conduct multiple case studies in different contexts.
Resumo:
There is little empirical research on the relational capabilities and competences in supply chain relationships, and the important links that exist between relational capabilities, competences and supply chain innovation. This study addresses some of that knowledge gap gained through a case study of the Australian freight services sector. Findings suggest that different competences developed by supply chain participants support different ways to enable operational effectiveness. Road freight businesses should acquire knowledge of how to select and manage inter-firm relationships that provide the greatest benefit, acquiring competences that either improve their current capabilities or assist them to explore strategies that ensure incremental innovation and supply chain performance objectives are met.
Resumo:
Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
This paper focuses on data exchange relationships and ways to improve collaboration in the supply chain. Initially, the paper examines the information needs and alternatives in supply chain management. In the second part, the paper identifies different sets of factors that are likely to influence information sharing with suppliers, from the manufacturers’ point of view. Results from a Finnish Manufacturing industry survey show that manufacturers provided substantial information on demand data, production schedules, and inventories to their suppliers. Respondents perceived delivery performance measured by the timeliness, accuracy, and defect rate of deliveries as the primary incentives for supplier collaboration. On the other hand, supplier image and the market in which the supplier operates were found to be less relevant in determining the intensity of collaboration.
Resumo:
In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in developing sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals’ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur, a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Effective supply chain management enhances organisation performance and competitiveness through the management of operations across organisational boundaries. Relational contracting approaches facilitate the exchange of information and knowledge and build capacity in the supply chain, thus enhancing its sustainability. Relationship management also provides the conditions necessary for the development of collaborative and cooperative relationships However, often subcontractors and suppliers are not empowered to attend project meetings or to have direct communication with project based staff. With this being a common phenomenon in the construction industry, one might ask: what are the barriers to implementation of relationship management through the supply chain? In other words, the problem addressed in this research is the engagement of the supply chain through relationship management.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Resumo:
The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.
Resumo:
Organizations adopt a Supply Chain Management System (SCMS) expecting benefits to the organization and its functions. However, organizations are facing mounting challenges to realizing benefits through SCMS. Studies suggest a growing dissatisfaction among client organizations due to an increasing gap between expectations and realization of SCMS benefits. Further, reflecting the Enterprise System studies such as Seddon et al. (2010), SCMS benefits are also expected to flow to the organization throughout its lifecycle rather than being realized all at once. This research therefore proposes to derive a lifecycle-wide understanding of SCMS benefits and realization to derive a benefit expectation management framework to attain the full potential of an SCMS. The primary research question of this study is: How can client organizations better manage their benefit expectations of SCM systems? The specific research goals of the current study include: (1) to better understand the misalignment of received and expected benefits of SCM systems; (2) to identify the key factors influencing SCM system expectations and to develop a framework to manage SCMS benefits; (3) to explore how organizational satisfaction is influenced by the lack of SCMS benefit confirmation; and (4) to explore how to improve the realization of SCM system benefits. Expectation-Confirmation Theory (ECT) provides the theoretical underpinning for this study. ECT has been widely used in the consumer behavior literature to study customer satisfaction, post-purchase behavior and service marketing in general. Recently, ECT has been extended into Information Systems (IS) research focusing on individual user satisfaction and IS continuance. However, only a handful of studies have employed ECT to study organizational satisfaction on large-scale IS. The current study will enrich the research stream by extending ECT into organizational-level analysis and verifying the preliminary findings of relevant works by Staples et al. (2002), Nevo and Chan (2007) and Nevo and Wade (2007). Moreover, this study will go further trying to operationalize the constructs of ECT into the context of SCMS. The empirical findings of the study commence with a content analysis, through which 41 vendor reports and academic reports are analyzed yielding sixty expected benefits of SCMS. Then, the expected benefits are compared with the benefits realized at a case organization in the Fast Moving Consumer Goods industry sector that had implemented a SAP Supply Chain Management System seven years earlier. The study develops an SCMS Benefit Expectation Management (SCMS-BEM) Framework. The comparison of benefit expectations and confirmations highlights that, while certain benefits are realized earlier in the lifecycle, other benefits could take almost a decade to realize. Further analysis and discussion on how the developed SCMS-BEM Framework influences ECT when applied in SCMS was also conducted. It is recommended that when establishing their expectations of the SCMS, clients should remember that confirmation of these expectations will have a long lifecycle, as shown in the different time periods in the SCMS-BEM Framework. Moreover, the SCMS-BEM Framework will allow organizations to maintain high levels of satisfaction through careful mitigation and confirming expectations based on the lifecycle phase. In addition, the study reveals that different stakeholder groups have different expectations of the same SCMS. The perspective of multiple stakeholders has significant implications for the application of ECT in the SCMS context. When forming expectations of the SCMS, the collection of organizational benefits of SCMS should represent the perceptions of all stakeholder groups. The same mechanism should be employed in the measurements of received SCMS benefits. Moreover, for SCMS, there exists interdependence of the satisfaction among the various stakeholders. The satisfaction of decision-makers or the authorized staff is not only driven by their own expectation confirmation level, it is also influenced by the confirmation level of other stakeholders‘ expectations in the organization. Satisfaction from any one particular stakeholder group can not reflect the true satisfaction of the client organization. Furthermore, it is inferred from the SCMS-BEM Framework that organizations should place emphasis on the viewpoints of the operational and management staff when evaluating the benefits of SCMS in the short and middle term. At the same time, organizations should be placing more attention on the perspectives of strategic staff when evaluating the performance of the SCMS in the long term.
Resumo:
The absorptive capacity of organisations is one of the key drivers of innovation performance in any industry. This research seeks to refine our understanding of the relationship between absorptive capacity and innovation performance, with a focus on characterising the absorptive capacity of the different participant groups within the Australian road industry supply chain. One of the largest and most comprehensive surveys ever undertaken of innovation in road construction was completed in 2011 by the Queensland University of Technology (QUT), based on the Australian road industry. The survey of over 200 construction industry participants covered four sectors, comprising suppliers (manufacturers and distributors), consultants (engineering consultants), contractors (head and subcontractors) and clients (state government road agencies). The survey measured the absorptive capacity and innovation activity exhibited by organisations within each of these participant groups, using the perceived importance of addressing innovation obstacles as a proxy for innovation activity. One of the key findings of the survey is about the impact of participant competency on product innovation activity. The survey found that the absorptive capacity of industry participants had a significant and positive relationship with innovation activity. Regarding the distribution of absorptive capacity, the results indicate that suppliers are more likely to have high levels of absorptive capacity than the other participant groups, with 32% of suppliers showing high absorptive capacity, ahead of contractors (18%), consultants (11%), and clients (7%). These results support the findings of previous studies in the literature and suggest the importance of policies to enhance organisational learning, particularly in relation to openness to new product ideas.