2 resultados para Saint Lucia

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

What is the secret mesmerism that death possesses and under the operation of which a modern architect – strident, confident, resolute – becomes rueful, pessimistic, or melancholic?1 Five years before Le Corbusier’s death at sea in 1965, the architect reluctantly agreed to adopt the project for L’Église Saint-Pierre de Firminy in Firminy-Vert (1960–2006), following the death of its original architect, André Sive, from leukemia in 1958.2 Le Corbusier had already developed, in 1956, the plan for an enclave in the new “green” Firminy town, which included his youth and culture center and a stadium and swimming pool; the church and a “boîte à miracles” near the youth center were inserted into the plan in the ’60s. (Le Corbusier was also invited, in 1962, to produce another plan for three Unités d’Habitation outside Firminy-Vert.) The Saint-Pierre church should have been the zenith of the quartet (the largest urban concentration of works by Le Corbusier in Europe, and what the architect Henri Ciriani termed Le Corbusier’s “acropolis”3) but in the early course of the project, Le Corbusier would suffer the diocese’s serial objections to his vision for the church – not unlike the difficulties he experienced with Notre Dame du Haut at Ronchamp (1950–1954) and the resistance to his proposed monastery of Sainte-Marie de la Tourette (1957–1960). In 1964, the bishop of Saint-Étienne requested that Le Corbusier relocate the church to a new site, but Le Corbusier refused and the diocese subsequently withdrew from the project. (With neither the approval, funds, nor the participation of the bishop, by then the cardinal archbishop of Lyon, the first stone of the church was finally laid on the site in 1970.) Le Corbusier’s ambivalence toward the project, even prior to his quarrels with the bishop, reveals...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

At the time of its official opening on 15 July 2011, The University of Queensland 1.22 MW array was the largest flat-panel PhotoVoltaic (PV) array in Australia. This PV array consists of over 5000 Trina Solar 240 Wp polycrystalline silicon PV modules installed across four rooftops at the St Lucia campus. Grid connection was achieved with 85 12.5 kW three phase and four 5 kW single phase grid connect inverters manufactured by Power-One. The site also includes one 8.4 kWp SolFocus concentrating solar 2 axis tracking PV array. Site wide monitoring and data logging of all DC, AC and environmental quantities will allow this array to be a rich source of research data. The site will also include a 200 kW 400 kWh zinc bromine energy storage system by Redflow, and associated power quality metering and monitoring. This paper presents highlights of the project feasibility study which included a site survey, shading analysis, and technology and triple bottom line assessment. A detailed description of the final technical implementation including discussion of alterative options considered is given. Finally, example initial data showing yield, trends and early example experimental results are presented.